GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness.

Slides:



Advertisements
Similar presentations
GLAST LAT Project Managers F2F Integration and Test 1 GLAST Large Area Telescope: Face to Face Managers Meeting LAT Integration & Test April.
Advertisements

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
IFCT Plan for Next 3 Months Larry Wai June 26, 2003.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Safety Overview.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review I&T Plan.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
Where to put Towers A and B in the Grid – technical issues 18-Jan-2005 L. Wai (SLAC/Group K) for LAT I&T.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test J. Panetta 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope:
GLAST LAT Project Technical/Cost/Schedule Review 03/31/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
111/3/2004 GLAST LAT ProjectLAT Engineering Meeting LAT Face to Face Manager’ Meeting Nov. 3, 2004 LAT Level Design Status LAT Face to Face Manager’ Meeting.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test L. Miller 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson.
GLAST LAT ProjectPDU/GASU MRR, February 3, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, G. Haller SLAC xxxx LAT Quality Engineer
GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
EGSE CENTRIC PLAN FOR TWO TOWER TESTS IN ACCORDANCE WITH MEETING HELD 02 MAR 2005 REVISED 22 MAR 2005.
GLAST Large Area Telescope:
Tracker Subsystem1 GLAST LAT Project Production Readiness Review, 25 August, 2004 GLAST LAT Tracker TOWER-A PRR TKR Tower Electrical Test Plan Luca Latronico.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT Project Technical/Cost/Schedule Review 06/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT Project Integration and Test IFCT Peer Review 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT Project IFC Tour – Sep 5,2003 Larry Wai 1 GLAST Large Area Telescope: Integration and Facility Status Larry Wai SU-SLAC Integration and Facility.
GLAST LAT Project Test Beam Meeting, Apr 18, 2006 E. do Couto e Silva 1/2 Beam Test Hardware Delivery Status Eduardo do Couto e Silva February 18, 2006.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Mechanical Integration
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope
Integration and Test Organization Chart
GLAST Large Area Telescope: I&T Test Readiness Review
LAT Environmental Test Planning and Design Review
Introduction and Overview
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Integration, Facilities, Configuration and Test (IFCT) Department Ken Fouts / Brian Grist Gamma-ray Large Area Space Telescope

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 2 IFCT Outline I.Operations Readiness II.EGSE III.Integration Facility

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 3 IFCT Part I. Operations Readiness 1.Summary of 2 tower I&T Operations and AIDS 2.Mapping of AIDS to schedule / PMCS 3.AIDS and Time Estimates Overview 4.Grid Installation and Survey 5.Calorimeter Receiving and Post-Ship Test 6.TEM/TPS Receiving 7.Tracker Receiving and Post-Ship Test 8.Calorimeter and TEM/TPS I&T 9.Test Bay I&T 10.Grid Bay I&T 11.Bays I&T

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 4 Two Tower I&T Operations Receive Tracker Flight Unit A Install in Metrology Bay for Shimming & Assembly Install tower in Test Bay Receive Calorimeter, TEM/TEM PS Flight Units A Test Single Bay Tower Test CAL A & TEM/TEM PS A Integrate Tracker A into Grid De-Install Tower from test bay Receive and assemble Grid Integrate Grid onto Rotation Stand Grid Optical Survey Integrate CAL/TEM/TPS A into Grid Single Tower Test in Grid Integrate Tracker B into Grid Integrate Cal/TEM/TEM- PS B into Grid Single Tower Test in Grid Two Tower I&T Install in Metrology Bay for Shimming & Assembly Install tower in Test Bay Receive Calorimeter, TEM/TEM PS Flight Units B Receive Tracker Flight Unit B Test Single Bay Tower Test CAL B & TEM/TEM PS B De-Install Tower from test bay Optical Survey

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 5 Assembly and Inspection Data Sheet

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 6 Assembly and Inspection Data Sheet

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 7 Assembly and Inspection Data Sheet

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 8 Mapping of AIDS to schedule / PMCS Strategy –AIDS line items tracked in MS Project –Line items are groups of work which take >1hr Status –AIDS drafts delivered to scheduler; data input in process; ECD Dec. 18

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 9 AIDS and Time Estimates Overview

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 10 Grid Installation and Survey Notes 1.Mechanical Systems (Martin Nordby) is working with SLAC metrology to define the Grid survey requirements. Risk Mitigation 1.Plan for completing a Grid to Grid Perimeter Ring fit check in work ECD 12/1. Minimal Risk Two Tower Risk Key

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 11 Calorimeter Receiving and Post-Ship Test Notes 1.Calorimeter post-ship test performed by Calorimeter Subsystem using subsystem GSE and staff. 2.Calorimeter TEM/TPS safe-to-mate performed by I&T for TEM-GASU and TPS-PDU connectors only 3.Calorimeter I&T receiving test performed by I&T Risk Mitigation 1.ELX will complete acceptance testing on EGSE Test Stand

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 12 TEM/TPS Receiving Notes 1.TEM/TPS manufacturing is completed in Room Safe-to-mate is performed on all TEM/TPS connectors (14)

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 13 Tracker Receiving and Post-Ship Test Notes 1.Tracker receiving inspection yet to be defined 2.Tracker post-ship test performed by tracker subsystem Risk Mitigation 1.I&T working closely with TKR subsystem to develop processes. 2.Plan is to use the TKR Mock Up with Flight-like Cables delivered in December to dry run receiving procedures. 3.ELX will complete acceptance testing on EGSE Test Stand

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 14 Calorimeter and TEM/TPS I&T Notes 1.I&T is considering requirements for relocating this process from room 104 (current baseline) to room 103 to relieve floor space usage in room 104 Risk Mitigation 1.ELX will complete acceptance testing on EGSE Test Stand

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 15 Test Bay I&T Notes 1.Tracker installation procedures not finalized at this time 2.Tower survey is managed by Martin Nordby and staffed from SLAC Metrology 3.Tower trigger test procedures and software not finalized at this time 4.E2E test software not finalized at this time 5.SVAC test software not finalized at this time Risk Mitigation 1.Plan is to use the TKR Mock Up with Flight-like Cables delivered in December to dry run receiving procedures 2.ELX will complete acceptance testing on EGSE Test Stand

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 16 Tracker Installation Basic Procedure complete –New inputs from Tracker Group to be incorporated Cone assembly process (done) Cable bonding process (still in work) –Some Project decisions pending Adjustment of Tower lean Measurement of Tower location –Procedures and documentation for Lifting need approval after procedure release

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 17 I&T Test Definitions Single Bay Test (in EM single bay) 54 hrs total (40 hrs w/o E2E/SVAC/VDG) –Aliveness Test (15 min) –Calorimeter: CPT (2 hrs) –Tracker: Pass/fail tests (2hrs) –Trigger: Module internal timing, GEM timing alignment, subsystem TACK delays (36 hours) –End-to-end Test, 6 hrs –SVAC Data Collection (Bay 9 only, includes VDG) 8 hrs Single Bay Test (in flight grid) 44 hrs total (4 hrs w/o SVAC) –Aliveness Test (15 min) –Calorimeter: CPT (2 hrs) –Tracker: Pass/fail tests (2hrs) –SVAC Data Collection (Bay 9 only, no VDG) Day 1=16 hrs, Day 2 = 24 hrs Two Bay Test (in flight grid) 104 hrs total –Aliveness Test (15 min) –Calorimeter: CPT (4 hours) –Tracker: Pass/fail tests (4hrs) –End-to-end Test, 40 hrs –SVAC Data Collection (includes VDG) Day 1=16 hrs, Day 2 = 24 hrs, VDG=16 hrs

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 18 Grid Bay I&T Notes 1.Same as for test bay I&T, except no trigger nor E2E tests Risk Mitigation 1.Plan is to use the TKR Mock Up with Flight-like Cables delivered in December to dry run receiving procedures 2.ELX will complete acceptance testing on EGSE Test Stand

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 19 Bays 8+9 I&T Notes 1.Flight mates are performed on DAQ cables to bays 8 & 9 2.Subsystem tests are executed module by module 3.E2E test software not finalized at this time 4.SVAC test software not finalized at this time Risk Mitigation 1.ELX will complete acceptance testing on EGSE Test Stand 2.Test definition in process with Systems Engineering

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 20 IFCT Part II. EGSE Preparation 1.Acceptance and validation process 2.COTS 3.BOBs 4.Connector savers 5.PDU 6.GASU 7.TEM/TPS 8.BPU 9.Test Stands 10.Test Procedures

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 21 EGSE Process; Design to Use Integration and Test (I&T) Subsystem Electrical Ground Support Equipment (EGSE) Plan LAT-MD Just released for review.

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 22 Break Out Boxes are Ready Breakout boxes facilitate interface verification without significant risk to flight hardware. Note that the LAT electronics design does not easily permit measurements of LVDS signaling characteristics at data rate. Four boxes are required: –26 pin interface –44 pin interface –78 pin interface –104 pin interface Adapter cables adapt between different pin outs, connector styles and sizes. Examples of breakout boxes are shown in the following picture:

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 23 Configuration Block Diagram, Tracker Test EGSE TKR

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 24 Equipment List, Tracker Test TypeManufacturer/Model/ID Number VME CrateDawn VME Products, VME, TST-STP Trans cardLAT-DS VME SBC MVME2304 cardMotorola PN MVME VME LCB Mezzanine cardLAT-TD LCB Transition board cableLAT-DS DC Power supplyBK Precision MN1786A Uninterruptible Power SupplyTripp-Lite SU1000 or equivalent 28 Volt supply cableLAT-DS PS Control cableLAT-DS TEM to GASU cableLAT-DS CAT5 Ethernet cableTRD855PL-50 CAT5 Ethernet cable.RS-232TDC003-7 (RECO98M connectors) Local PCDELL, Model “Golden” TEM/TPS

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 25 Configuration Block Diagram, Two Tower Test

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 26 Equipment List, Two Tower Test

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 27 EGSE IN SINGLE TOWER ASSY FLOW

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 28 EGSE IN TWO TOWER ASSY

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 29 EGSE TEST REQUIREMENTS: MD Configuration of EGSE shall be controlled via released documentation EGSE shall be acceptance tested EGSE shall be validated before use if it has been moved, reconfigured, or repaired –Validation shows that equipment is both ready for use and safe to use High degree of confidence that equipment in that configuration has full operating capabilities –NASA guidance Perform an EICIT and an SVT to ensure electrical safety Trip points on circuit breakers, current limits in power supplies, shall be verified While everything is validated, the scope of validation is tailored for each piece equipment type

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 30 STATUS OF EGSE– COTS Digital Multimeters (I&T responsible for these) –Calibrated Instrument –Validation Tests Embedded within test procedure that calls them –STATUS: Meter purchased exceed maximum voltage for parts in some equipment, so we are re-procuring Borrowing “Safe” DMM’s in the meantime Hand Tools –Procured, cleaned, and placed in toolbox within cleanroom Automated Test Equipment for Safe to Mate –All parts received - calibrated –Interconnection harness designed –in assembly –Rack tray’s sent out for machining – affected by safety stand down at SLAC

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 31 SCOPE OF EGSE TESTS – BOB’s ETC. Cables and break out boxes (I&T is responsible for these) –Design documentation complete and released –Acceptance Tests include Configuration inspection to assembly drawing Interface integrity and cleanliness, inspection Electrical continuity & isolation tests per LAT-TD Labeling with test due date, operator, QA –Validation Tests include Verify Acceptance Testing has been performed and is not due for re-test Configuration inspection Interface integrity and cleanliness, inspection Electrical continuity tests, manual Connector Savers –Tests: Interface integrity and cleanliness, inspection

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 32 STATUS OF BOB’s ETC All BOB’s designed, built, and tested –Inspection remains to be completed Associated cables designed, built to shortage, and tested –The backshells for the 100 pin cables were back ordered and just arrived. Estimate assembly complete 12/1 –Inspection remains to be completed Long versions of the Two Tower test cables for EGSE interconnections are awaiting the floor layout to determine lengths. Design, build, and test complete 12/31. Acceptance and Validation Test Procedures in sign off cycle

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 33 STATUS OF CONNECTOR SAVERS Determining connector saver needs –Coordinating with subsystems All ELX boxes arrive with connector savers on each connector CAL delivers mated to an EM TEM, so they are not needed TKR towers arrive with connector savers that will be turned over to I&T –Determining who buys connector savers for the flight cables – submitted lien to program office to fund procurement –Complete determination by 11/24

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 34 SCOPE OF EGSE TESTS - PDU EM PDU –Acceptance Tests include Configuration inspection to LAT-DS Interface integrity and cleanliness, inspection EICIT and SVT tests Functional Tests in accordance with LAT-TD Labeling with test due date, operator, QA –Validation Tests include Verify Acceptance Testing has been performed and is not due for re- test Configuration inspection Interface integrity and cleanliness, inspection Electrical STM tests Further validation tests performed within the test stand using load box

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 35 SCOPE OF EGSE TESTS – PDU LOAD EM PDU LOAD BOX –Acceptance Tests include Configuration inspection to LAT-DS Interface integrity and cleanliness, inspection EICIT and SVT tests Functional Tests in accordance with LAT-TD Labeling with test due date, operator, QA –Validation Tests include Verify Acceptance Testing has been performed and is not due for re- test Configuration inspection Interface integrity and cleanliness, inspection Electrical STM tests Further validation tests performed within the test stand

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 36 STATUS OF PDU & LOAD BOX Documentation –PDU Assy, LAT-DS-01696, released –PDU Test Procedure, LAT-TD , released –PDU Load Box Assy, LAT-DS-03400, released –PDU Load Test Procedure, LAT-TD , released –EICIT Procedure, PDU, LAT-TD-04332, released –SVT Procedure, PDU, LAT-TD-04332, in work (12/1) Delivered to I&T Inspection, acceptance test, validation pending development of flight documentation

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 37 SCOPE OF EGSE TESTS - GASU EM GASU –Acceptance Tests include Configuration inspection to LAT-DS Interface integrity and cleanliness, inspection EICIT and SVT tests Functional Tests in accordance with LAT-TD Labeling with test due date, operator, QA –Validation Tests include Verify Acceptance Testing has been performed and is not due for re- test Configuration inspection Interface integrity and cleanliness, inspection Electrical STM tests Further validation tests performed within the test stand

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 38 STATUS OF GASU Documentation –GASU Assy, LAT-DS , released –GASU/Test Stand Test Procedure, LAT-TD , released –EICIT Procedure, GASU, LAT-TD-04260, released –SVT Procedure, GASU, LAT-TD-04382, in work (12/1) Delivered to I&T Inspection, acceptance test, validation pending development of flight documentation

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 39 SCOPE OF EGSE TESTS – TEM/TPS EM TEM/TPS –Acceptance Tests include Configuration inspection to LAT-DS Interface integrity and cleanliness, inspection EICIT and SVT tests Functional Tests in accordance with LAT-TD Labeling with test due date, operator, QA –Validation Tests include Verify Acceptance Testing has been performed and is not due for re- test Configuration inspection Interface integrity and cleanliness, inspection Electrical STM tests Further validation tests performed within the test stand

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 40 STATUS OF TEM/TPS Documentation –TEM/TPS Assy, LAT-DS-01643, released –TEM/TPS Test Procedure, LAT-TD , released –EICIT Procedure, TEM, LAT-TD , released –SVT Procedure, TEM, LAT-TD , released –EICIT Procedure, TPS, LAT-TD , released –SVT Procedure, TPS, LAT-TD , released Two delivered to I&T Inspection, acceptance test, validation pending development of flight documentation

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 41 SCOPE OF EGSE TESTS – BUS PROTECTOR –Acceptance Tests include Configuration inspection to LAT-DS- Interface integrity and cleanliness, inspection EICIT and SVT tests Functional Tests in accordance with LAT-TD- Labeling with test due date, operator, QA –Validation Tests include Verify Acceptance Testing has been performed and is not due for re-test Configuration inspection Interface integrity and cleanliness, inspection Electrical STM tests Validation tests performed in accordance with LAT-TD-

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 42 STATUS OF BUS PROTECTOR Requirements identified in EGSE Plan Design assigned within ELX Documentation needs be created Developing schedule with ELX to support Two Tower Test

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 43 TEM TEST STAND - CAL AND TKR TESTS Acceptance Tests include –Configuration inspection LAT-DS CAL LAT-DS TKR –Interface integrity and cleanliness, inspection –EICIT and SVT tests –Functional Tests in accordance with LAT-TD Validation Tests include –Verify Acceptance Testing has been performed and is not due for re-test –Configuration inspection –Interface integrity and cleanliness, inspection –Electrical STM tests –Perform tests described in LAT-TD , Para , Basic Test

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 44 STATUS OF TEM TEST STAND Documentation –CAL Test Stand set up procedure, LAT-DS-02861, released –TKR Test Stand set up procedure, LAT-DS-03605, released –TEM/TPS Test Procedure, LAT-TD , released –EICIT Procedure, TEM, LAT-TD , released –SVT Procedure, TEM, LAT-TD , released –EICIT Procedure, TPS, LAT-TD , released –SVT Procedure, TPS, LAT-TD , released Two Test Stands delivered to I&T Inspection, acceptance test, validation pending development of flight documentation

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 45 GASU TEST STAND – TESTS IN 1X1 Acceptance Tests include –Configuration inspection LAT-TD –Interface integrity and cleanliness, inspection –EICIT and SVT tests –Functional Tests in accordance with LAT-TD Validation Tests include –Verify Acceptance Testing has been performed and is not due for re-test –Configuration inspection –Interface integrity and cleanliness, inspection –Electrical STM tests –Perform tests described in LAT-TD , Para , Basic Test

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 46 STATUS OF GASU TEST STAND Documentation –Assembly and test procedure, LAT-TD , released –Validation test, run LAT-TD , released –EICIT Procedure, GASU, LAT-TD-04260, released –SVT Procedure, GASU, LAT-TD-04382, in work (12/1) Delivered to I&T Inspection, acceptance test, validation pending development of flight documentation

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 47 GASU/PDU TEST STAND – TWO TOWER Acceptance Tests include –Configuration inspection LAT-TD –Interface integrity and cleanliness, inspection –EICIT and SVT tests –Functional Tests in accordance with LAT-TD Validation Tests include –Verify Acceptance Testing has been performed and is not due for re-test –Configuration inspection –Interface integrity and cleanliness, inspection –Electrical STM tests –Perform tests described in LAT-TD , Para , PDU-GASU Interface and electrical load tests LAT-TD , Para , Basic Test

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 48 STATUS OF GASU/PDU TEST STAND Documentation –Assembly and test procedure, LAT-TD , released –PDU Validation LAT-TD-02544, released –Validation test, run LAT-TD , released –EICIT Procedure, PDU, LAT-TD-04332, released –SVT Procedure, PDU, LAT-TD-04332, in work (12/1) –EICIT Procedure, GASU, LAT-TD-04260, released –SVT Procedure, GASU, LAT-TD-04382, in work (12/1) Delivered to I&T Inspection, acceptance test, validation pending development of flight documentation

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 49 TEST PROCEDURE STATUS I&T Test procedures are being written prior to completion of test plan. CAL Test Procedure –Draft complete and in review –Draft must be updated with new input from CAL subsystem (received after procedure completed) –Complete one week after CAL final update TKR Test Procedure –Draft was complete and in review three weeks ago –Draft was updated with new input from TKR subsystem (received after procedure completed) –Complete one week after TKR final update

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 50 TEST PROCEDURE STATUS (cont) Single Tower Test –Draft in review in I&T –Affected by change to subordinate documents References to be updated and test descriptions re-written –Complete 12/15 Two Tower Test –Draft begun –Complete 12/31 VG and CR Data Runs for LAT Integration

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 51 IFCT Part III. Integration Facility 1.Cleanroom 2.Computing

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 52 Cleanroom Building 33 Clean Rooms functional and occupied –Monitoring system fully operational. –Clean Rooms fully certified. –All computers and oxygen sensors have battery back ups. Upgrades –Grounding system for ESD and Multi-point ground to be installed. ECD 1/3/05 –15 ton crane to get two speed option, after initial Grid handling. ECD 3/1/05 (TBR) –Stand alone hot water boiler. ECD 3/1/05 (TBR) –Upgrade environmental controls on clean room air handler. ECD 3/1/05 (TBR) –Substation upgrade. ECD 3/31/05 –Extend back up generator lease thru Jun 05. ECD 12/31/04

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 53 Computing Hardware and networking –Online network / firewall fully operational –SLAC centrally administered accounts (active directory) working Upgrades –RAID5 servers in hand (3 units+spare) and migration is in progress; ECD Dec.18 –Environmental test computing infrastructure design in progress