The LHCb DAQ and Trigger Systems: recent updates Ricardo Graciani XXXIV International Meeting on Fundamental Physics.

Slides:



Advertisements
Similar presentations
High Level Trigger (HLT) for ALICE Bergen Frankfurt Heidelberg Oslo.
Advertisements

0 25. Sept 2006 M.Smizanska, Lancaster University, UK LHC preparations for precise measurements of muonic very rare B-decays 25. Sept 2006 M.Smizanska,
LHCb Upgrade Overview ALICE, ATLAS, CMS & LHCb joint workshop on DAQ Château de Bossey 13 March 2013 Beat Jost / Cern.
High Level Trigger – Applications Open Charm physics Quarkonium spectroscopy Dielectrons Dimuons Jets.
Valeria Perez Reale University of Bern SM Higgs Discovery Channels ATLAS High Level Trigger Trigger & Physics Selection Higgs Channels: Physics Performance.
CMS High Level Trigger Selection Giuseppe Bagliesi INFN-Pisa On behalf of the CMS collaboration EPS-HEP 2003 Aachen, Germany.
27 th June 2008Johannes Albrecht, BEACH 2008 Johannes Albrecht Physikalisches Institut Universität Heidelberg on behalf of the LHCb Collaboration The LHCb.
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
October 20 th, 2000Lyon - DAQ2000HP Beck ATLAS Trigger & Data Acquisition Requirements and Concepts Hanspeter Beck LHEP - Bern for the ATLAS T/DAQ Group.
The ATLAS B physics trigger
CERN June HERA-LHC Workshop Status and startup for physics with LHCb G. Passaleva (INFN-Firenze) On behalf of the LHCb collaboration.
CHEP04 - Interlaken - Sep. 27th - Oct. 1st 2004T. M. Steinbeck for the Alice Collaboration1/20 New Experiences with the ALICE High Level Trigger Data Transport.
6 th International Conference on Hyperons, Charm and Beauty Hadrons July 2, 2004 Rare B Decays at LHC Sébastien VIRET Laboratoire de Physique Subatomique.
Laboratoire de l’Accélérateur Linéaire, Orsay, France and CERN Olivier Callot on behalf of the LHCb collaboration Implementation and Performance of the.
Beauty 2006 R. Muresan – Charm 1 Charm LHCb Raluca Mureşan Oxford University On behalf of LHCb collaboration.
The LHCb Online System Design, Implementation, Performance, Plans Presentation at the 2 nd TIPP Conference Chicago, 9 June 2011 Beat Jost Cern.
Hall D Trigger and Data Rates Elliott Wolin Hall D Electronics Review Jefferson Lab 23-Jul-2003.
Tracking at the ATLAS LVL2 Trigger Athens – HEP2003 Nikos Konstantinidis University College London.
Architecture and Dataflow Overview LHCb Data-Flow Review September 2001 Beat Jost Cern / EP.
Overview of the High-Level Trigger Electron and Photon Selection for the ATLAS Experiment at the LHC Ricardo Gonçalo, Royal Holloway University of London.
FPCP04, Daegu, 9 Oct 2004P J Dornan - Imperial College London1 B-Physics at the LHC P J Dornan Imperial College, London.
LHCb computing in Russia Ivan Korolko (ITEP Moscow) Russia-CERN JWGC, October 2005.
Copyright © 2000 OPNET Technologies, Inc. Title – 1 Distributed Trigger System for the LHC experiments Krzysztof Korcyl ATLAS experiment laboratory H.
Finnish DataGrid meeting, CSC, Otaniemi, V. Karimäki (HIP) DataGrid meeting, CSC V. Karimäki (HIP) V. Karimäki (HIP) Otaniemi, 28 August, 2000.
ALICE Upgrade for Run3: Computing HL-LHC Trigger, Online and Offline Computing Working Group Topical Workshop Sep 5 th 2014.
1 Performance Studies for the LHCb Experiment Performance Studies for the LHCb Experiment Marcel Merk NIKHEF Representing the LHCb collaboration 19 th.
HEP 2005 WorkShop, Thessaloniki April, 21 st – 24 th 2005 Efstathios (Stathis) Stefanidis Studies on the High.
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
The ATLAS Trigger: High-Level Trigger Commissioning and Operation During Early Data Taking Ricardo Gonçalo, Royal Holloway University of London On behalf.
IOP HEPP: Beauty Physics in the UK, 12/11/08Julie Kirk1 B-triggers at ATLAS Julie Kirk Rutherford Appleton Laboratory Introduction – B physics at LHC –
The LHCb CERN R. Graciani (U. de Barcelona, Spain) for the LHCb Collaboration International ICFA Workshop on Digital Divide Mexico City, October.
M. Poli Lener XI Spring School - "Bruno Touschek" 1 Luminosity measurements with dimuon and single muon reconstruction of Z 0 and W decays OUTLINE:  LHCb.
LHCb front-end electronics and its interface to the DAQ.
LHCb DAQ system LHCb SFC review Nov. 26 th 2004 Niko Neufeld, CERN.
Study of exclusive radiative B decays with LHCb Galina Pakhlova, (ITEP, Moscow) for LHCb collaboration Advanced Study Institute “Physics at LHC”, LHC Praha-2003,
Niko Neufeld, CERN/PH. Online data filtering and processing (quasi-) realtime data reduction for high-rate detectors High bandwidth networking for data.
Overview of the High-Level Trigger Electron and Photon Selection for the ATLAS Experiment at the LHC Ricardo Gonçalo, Royal Holloway University of London.
Online View and Planning LHCb Trigger Panel Beat Jost Cern / EP.
CP violation in B decays: prospects for LHCb Werner Ruckstuhl, NIKHEF, 3 July 1998.
Management of the LHCb DAQ Network Guoming Liu *†, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
LHCbComputing Computing for the LHCb Upgrade. 2 LHCb Upgrade: goal and timescale m LHCb upgrade will be operational after LS2 (~2020) m Increase significantly.
DAQ Systems and Technologies for Flavor Physics FPCP Conference Lake Placid 1 June 2009 Beat Jost/ Cern-PH.
DAQ Overview + selected Topics Beat Jost Cern EP.
LHCb trigger: algorithms and performance Hugo Ruiz Institut de Ciències del Cosmos March 12 th -17 th 2009, Tsukuba, Japan On behalf of the LHCb Collaboration.
Introduction to DAQ Architecture Niko Neufeld CERN / IPHE Lausanne.
Workshop ALICE Upgrade Overview Thorsten Kollegger for the ALICE Collaboration ALICE | Workshop |
Trigger Strategy and Performance of the LHCb Detector Mitesh Patel (CERN) (on behalf of the LHCb Collaboration) Thursday 7 th July 2005.
Open and Hidden Beauty Production in 920 GeV p-N interactions Presented by Mauro Villa for the Hera-B collaboration 2002/3 data taking:
ATLAS UK physics meeting, 10/01/08 1 Triggers for B physics Julie Kirk RAL Overview of B trigger strategy Algorithms – current status and plans Menus Efficiencies.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
TELL1 A common data acquisition board for LHCb
Controlling a large CPU farm using industrial tools
ALICE – First paper.
RT2003, Montreal Niko Neufeld, CERN-EP & Univ. de Lausanne
DAQ Systems and Technologies for Flavor Physics
The LHCb Trigger Niko Neufeld CERN, PH
LHC Collisions.
The LHCb Event Building Strategy
LHCb Trigger and Data Acquisition System Requirements and Concepts
John Harvey CERN EP/LBC July 24, 2001
on behalf of the LHCb collaboration
Overview of LHCb Poland Ukraine Brazil UK Switzerland France Spain
The LHCb Trigger Niko Neufeld CERN, PH.
LHCb Trigger, Online and related Electronics
8th International Conference on Advanced Technology and
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
on behalf of the LHCb collaboration
LHCb Trigger LHCb Trigger Outlook:
TELL1 A common data acquisition board for LHCb
Presentation transcript:

The LHCb DAQ and Trigger Systems: recent updates Ricardo Graciani XXXIV International Meeting on Fundamental Physics.

XXXIV IMFPThe LHCb DAQ and Trigger Systems: recent updates2 Overview LHCb The Original Design Trigger Rate: –From 200 Hz to 2000 Hz Level 1 suppression: –1 MHz Readout Outlook

XXXIV IMFPThe LHCb DAQ and Trigger Systems: recent updates3 LHCb LHC: –40 MHz crossing rate –30 MHz with bunches from both directions Luminosity: 2·10 32 cm -2 s -1 –10 to 50 times lower ATLAS, CMS One Arm Forward Spectrometer LHCb rates: (for visible events  at least 2 tracks in acceptance) –Total rate (minimum bias): 10 MHz –bb: ~100kHz Whole decay of one B in acceptance: 15kHz –cc: ~600kHz pp interactions/crossing  B (rad) Production angle Of B vs B

XXXIV IMFPThe LHCb DAQ and Trigger Systems: recent updates4 The Spectrometer p p 250 mrad 10 mrad Muon system Vertex Locator RICH detectors Tracking systemDipole magnet Calorimeters

XXXIV IMFPThe LHCb DAQ and Trigger Systems: recent updates5 LHCb Physics Program B s oscillation frequency, phase and ΔΓ s –B s  D s , J/ ΨΦ, J/ Ψη, η c Φ  from B d  0  –  +  with B d  J/  K S as a proof of principle –And  from b  s penguin  in various channels, differing sensitivity to new physics: –Time-dependent CP asymmetry of B s  D s  K  and D s  K  –Time dependent CP asymmetries of B d     and B s  K  K  –Comparison of decay rates in the B d  D 0 (K + π -,K - π +,K + K - )K * 0 system –Comparison of decay rates in the B -  D 0 (K + π -,K + π - π + π - )K - system –Dalitz analysis of B -  D 0 (K S π - π + )K - and B d  D 0 (K S π - π + )K *0 Rare decays –Radiative penguin B d  K* , B s  Φ , B d   –Electroweak penguin B d  K * 0      –Gluonic penguin B s  ΦΦ, B d  Φ K s –Rare box diagram B s      B c, b-baryon physics + unexpected !

XXXIV IMFPThe LHCb DAQ and Trigger Systems: recent updates6 The LHCb TP HLT

XXXIV IMFPThe LHCb DAQ and Trigger Systems: recent updates7 From 200 to 2000 Hz Initial Design: –200 Hz of partial or fully reconstructed B final States. –Exclusive B Trigger. Limitations: –Strong MC dependence: Efficiency determination Detector Performance (vertex, proper time, PID) Backgrounds –Huge MC samples are necessary. Conclusion: –Review strategy Use real Data for the above studies –Re-evaluation of Computing needs Factor 10 reduction on MC needs Factor 10 increase on Trigger rate

XXXIV IMFPThe LHCb DAQ and Trigger Systems: recent updates8 2 kHz Trigger Output Best guess at present (split between streams still to be determined) Exclusive reconstruction is kept Large inclusive streams to be used to control calibration and systematics (trigger, tracking, PID, tagging,…) 10-15% acceptance for any channel on inclusive samples. Output rateTrigger TypePhysics Use 200 HzExclusive B candidatesSpecific final states 600 HzHigh Mass di-muons J/ , b  J/  X 300 HzD* CandidatesCharm, calibrations 900 Hz Inclusive b (e.g. b  ) B data mining

XXXIV IMFPThe LHCb DAQ and Trigger Systems: recent updates9 Cost Estimate 200Hz2000Hz Hoffman 2007 Now 2008 CERN CPU(MSI2k) Disk(PB) Tape(PB) Tier-1’s CPU(MSI2k) Disk(PB) Tape(PB) Tier-2’s CPU(MSI2k)-7.6 Disk(PB)-0.02 Relative Cost

XXXIV IMFPThe LHCb DAQ and Trigger Systems: recent updates10 DAQ Architecture Storage System TIER0 Scalable in depth: more CPUs (<2200) Scalable in width: more detectors in Level-1 Multiplexing Layer FE Switch Level-1 Traffic HLT Traffic 1000 kHz 5.5 GB/s 40 kHz 1.6 GB/s 94 SFCs Front-end Electronics 7.1 GB/s TRM Sorter L1-Decision Readout Network Switch SFC Switch CPU SFC Switch CPU SFC Switch CPU SFC Switch CPU SFC Switch CPU CPU Farm ~1600 CPUs ~ 250 MB/s total TFC System ECS

XXXIV IMFPThe LHCb DAQ and Trigger Systems: recent updates11 The “old” System Detector L0 boards: –talk Gb Ethernet –implement buffer to allow for Level 1 latency Two Data Streams: –Level-1 trigger with latency limit of ~58 MHz 3.8 kB/event  ~4.3 GB/sec –HLT traffic without latency 40 kHz ~30 kB/event  ~1.2 GB/s

XXXIV IMFPThe LHCb DAQ and Trigger Systems: recent updates12 1 MHz DAQ

XXXIV IMFPThe LHCb DAQ and Trigger Systems: recent updates13 Advantages Major simplification of the DAQ system –Only one data flow through the system –Elimination of the SFCs; –Event-Building in each CPU node –Elimination of the Level-1 decision sorter –No latency limitations for event processing –Well suited for multi-core CPU architectures For the Trigger software –ALL information available at all times in full precision and full granularity Better trigger efficiency Required Switching power: ~ 60 GB/s

XXXIV IMFPThe LHCb DAQ and Trigger Systems: recent updates14 The Hardware Candidate Force10 equipment  Port densities –Biggest switch has 14 slots for line-cards –Biggest port density is 90 Gb Ethernet ports per line-card (90/48 over-committed) ➔ 14*90 = 1260 GbEthernet ports  Switching Fabric ➣ Switching capacity is raw ~ 1.6 Tb/sec, usable ~ 1.2 Tb/sec (150 GB/s)

XXXIV IMFPThe LHCb DAQ and Trigger Systems: recent updates15 Reviewed HLT Strategy

XXXIV IMFPThe LHCb DAQ and Trigger Systems: recent updates16 Outlook LHCb had a very scalable and flexible DAQ schema. LHCb Trigger includes inclusive samples –HLT rate from 200 to 2000 Hz. High-mass di-muon D* Inclusive b Full L0 rate (1 MHz) sent to Online Filter Farm for a full software High Level Trigger. Review Vertical Trigger strategy for HLT.