Geoff Pile FAC Review - Undulator 12 November 2008 LCLS Undulator System Overview and Fabrication Geoff Pile.

Slides:



Advertisements
Similar presentations
Getting off to a good start The first 3 months Institute of Psychiatry, Supervisors Training Course September Requirements for first month Induction.
Advertisements

Rodd Pope, SLAC Undulator System April 16-17, 2007 FAC Meeting 1 Undulator System Assembly, Installation, and Integration.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
Marion M. White Undulator System 07 April 2005 LCLSLCLSLCLSLCLS Undulator System Tests Marion M. White ANL-ASD-LCLS.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
Geoff Pile FAC Review - Undulator 17 June 2008 LCLS Undulator System Status and Schedule Geoff Pile.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
John Arthur Photon Systems April 16, LCLS Photon Systems Status Technical status and accomplishments Response to.
M. White – June 28, 2004 LCLS Requirements Meeting In a project, we live or die by the schedule. After we’re “baselined” it is our plan for what we will.
Jess Albino Facility Advisory October 29, 2007 FACILITY ADVISORY COMMITTEE PLENARY CONVENTIONAL FACILITIES UPDATE October.
Marion White Magnets & Supports April 16, 2007 Undulator Magnets and Supports Status.
Richard M. Boyce FAC October 29-31, Installation Planning Integration process – IMT update Installation Planning &
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Rodd Pope, SLAC Undulator System April 20-21, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC In collaboration.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Bob Lill LCLS FAC June 16-18, 2008 RF BPM Status and Production Test Results.
Eric Bong LCLS FAC Injector-Linac System October 27, 2005 Injector –Linac System Overview E. Bong LCLS FAC October 27, 2005.
Mike Scharfenstein FAC Review - November 11, 2008 SLAC National Accelerator Laboratory 1 Environment Safety & Health Status.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Geoff Pile LCLS Und. System FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Update FAC Review October 29 th (30 th.
Jose Chan FAC Review- LTU-DUMP Installation Status & 11/11/08 1 LTU-Dump Installation Status & Schedule.
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status.
1 BROOKHAVEN SCIENCE ASSOCIATES Preparations for Linac Commissioning Ray Fliller, Associate Physicist 8 th ASAC meeting for NSLS-II Project May 10-11,
ASPERA-3 Sep. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 9_25/ Page 1 Monthly Status Report Report due 9/25/00 Schedule statused.
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
August 2 and 3, 2010 Project Cost, Schedule, Risk and Contingency Jay Elias.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
Prof. Roy Levow Session 8.  Steps in Closing a Project  Getting Client Acceptance  Installing Project Deliverables  Documenting the Project  Post-Implementation.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
Status of X-Band PPM Klystron R&D for JLC KEK Yong Ho Chin ISG9 KEK December 10-13, 2002.
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May review Near Detector Electronics production.
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 16-Nov-2009.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
Procurement and Manufacture of LCLS Undulators FY 04 Activity: Complete design of Second Prototype Undulator This will include field control comb Procure.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
Strategic Planning Deanna Herwald Vice President-Quality Management Systems.
Josh Stein 29-Apr-08 Undulator Controls Undulator Controls Status Update Josh Stein LCLS Undulator Controls CAM/TL.
S. Smith LCLS Facility Advisory October 12, Beam Position Monitors Facility Advisory Committee October 12, 2006.
Lab-Wide Earned Value Management System Project Oversight Committee Meeting September 11, 2008 Dean. Hoffer / Elaine McCluskey.
Lab-Wide Earned Value Management System Project Core Team Meeting September 10, 2008 Dean A. Hoffer/Elaine McCluskey.
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
LCLS Undulator System Detailed Report
Undulator Scope, Management, and Organization
Electron Beam Systems ETC and Methodology
Undulator System Components Status Dean Walters
LCLS Undulator System Status and Schedule
Undulator Cavity BPM System Status
LCLS Undulator System Production Management
E-Beams Systems Manager
LCLS Undulator System Status and Schedule
Installation Status & Operational Readiness Process
Undulator Integration Test Status
Electron Beam Systems ETC and Methodology
LCLS Undulator System Detailed Report
LCLS e- Beams System Overview
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Alignment Diagnostic System Status
LCLS Control System Personnel Linac & BC2 Controls progress
Undulator Systems Integration
DOE Status Meeting of the LCLS Project
LCLS e- Beams Systems Manager
Presentation transcript:

Geoff Pile FAC Review - Undulator 12 November 2008 LCLS Undulator System Overview and Fabrication Geoff Pile

FAC Review - Undulator 12 November 2008 Safety Minute FY09 - SLAC steps up it’s Work Planning and Control even further My personal views and experiences: Work Planning and Control is an Integral part of good Integrated Safety Management In most facilities, implementation of ES&H requirements and work control processes at the activity level has not been effective for non-experimental work activities. By complying with DOE Work Planning & Control: ALL work in “Research & Development, Operations, Maintenance & Construction/Destruction should be reviewed”. APS holds effective weekly pre-project and pre-task briefings associated with Operations and Shut downs - work planning and control is discussed and approved in principle. “Operations Group” requires formal approved work requests prior to work starting Feedback and lessons learned during task close out. Usual attendance of reps and interested parties

Geoff Pile FAC Review - Undulator 12 November 2008 Second Safety Minute Make time for WP&C - Group Leaders should schedule seperate mandatory 1 to 2 hours weekly WPC meetings. Plan least two weeks work for workers every week. Work Planner describes plan to workers involved Documentation: Written assignments with work, safety check lists, referenced procedures, work request and/or permit numbers and feed back discussions. Schedule 1 hour weekly mandatory cross training – 1 staff to up to 10 trainees Practical – perform approved group procedures and make sure they work Theory - explanations of relevant components, systems and how system works with LCLS 10 years of weekly cross training helps both staff and trainees Share the load, plan the work and don’t carry the can yourself!

Geoff Pile FAC Review - Undulator 12 November 2008 Overview of Undulator Component Fabrication Topics What has and hasn’t been delivered to SLAC as of November 12 th 2008? What has been… or appear problem areas now? What is ANL doing in FY09

Geoff Pile FAC Review - Undulator 12 November 2008 Controls

Geoff Pile FAC Review - Undulator 12 November 2008 Controls Status and Schedule ALL Controls delivered I month ahead of schedule (23 rd June 2008) September work deferred due to funding issues. ANL Under estimated contingency effort required to support and complete installation. PROBLEMS: EPICS Programming Support and Motion positioning system not functioning properly. SLAC doesn’t get same results as ANL’s SUT, LTT or LAB View results – Suspect software Stein and Shaof working on LTT with APS metrology group – checking software programming and version #’s, IOC versions - cam calibration etc. LTT still looks good - Exploring basics first, expect resolution this week. Voogd has been helping out at SLAC during installation and turn on Stein will be at SLAC after thanksgiving to help with controls integration

Geoff Pile FAC Review - Undulator 12 November 2008 Magnets and Supports

Geoff Pile FAC Review - Undulator 12 November 2008 Problem: ( discussed at last FAC) Obtaining X Translation Limits & Stops for mm over travel - required redesign Solution: 69 production units delivered to SLAC on 6 /20/08

Geoff Pile FAC Review - Undulator 12 November 2008 Vacuum

Geoff Pile FAC Review - Undulator 12 November 2008 Diagnostics

Geoff Pile FAC Review - Undulator 12 November 2008 Diagnostics Status and Schedule BPM Mechanical – Deliveries complete Problems – brazing BPM window went well until the last 7 units. 33 brazed production Units 7 units were Indium/tin soldered. BPM Electrical – 36 Production Units complete 4 spare units very late due to parts shortage at Miteq ALL parts at Vendors – delivery rescheduled to ANL Nov 21 ANL complete by Nov 28 th - Ship to SLAC following week

Geoff Pile FAC Review - Undulator 12 November 2008 Diagnostics (Contd)

Geoff Pile FAC Review - Undulator 12 November 2008 Beam Loss Monitor Initially five BLMs will be used to protect the undulators by inhibiting beam bunches following an “above-threshold” radiation event. 30 production BLMs may be built in FY09 if R&D is successful Scheduled delivery to SLAC – Berg to install 5 units - 18th of November 2008 Aggressive schedule – Vendor dates slip - may need few extra days to assemble/checkout – plastic radiator backup solution available for 18 th. Electronics are done First Article detector fitted well – vendor approved to proceed Still some components at vendors Anodizing completed this week Quartz Promised to ANL Friday 14 th

Geoff Pile FAC Review - Undulator 12 November 2008 Undulator Inserted Position

Geoff Pile FAC Review - Undulator 12 November 2008 BLM Detector and Electronic Interface Z Integration of Detector Head

Geoff Pile FAC Review - Undulator 12 November 2008 Long Term Test Does LTT match SUT?  LTT testing was put on hold at the end of August  ANL approved to finish more comprehensive and comparative results Requires matrixed staff for:  Alignment, mechanical and electrical assembly, Controls and data acquisition etc. Task management, work planning and control.  The effort is not insignificant ($30 - $40K) but was in MW’s original budget and it is essential

Geoff Pile FAC Review - Undulator 12 November 2008 Status and Schedule Undulator System Management and Integration CPR & Costs to go – Generally in good shape. Some unplanned effort has been required in the last two months to solve problems and meet installation schedules. ANL Controls CPR for October with positive $200K variance Some of it will solve integration problems ( a month or two of Voogd, Shoaf and Steins’ effort) Most spares costs were moved to OPC in September. SLAC has funded essential ANL work in FY09 MOU

Geoff Pile FAC Review - Undulator 12 November 2008 Summary Almost all work related to installation will be completed by late November/ early December 2008 – Production BLMs? TBD (2009) Argonne Construction team started rolling off the project in July – mainly documentation and LTT effort is required to wrap things up. September was a tough month – a few essential people now catching up with outstanding work FY09 – the original small budget included for installation and commissioning support has been increased to allow better integration and problem resolution