H. EvansRun2b L1Cal Meeting: 22-Aug-021 Temple Review Post-Mortem Hal Evans 12-15 Aug: Director’s Rev. of all CDF & DØ Run IIb Projects –Prep for DOE (Lehman)

Slides:



Advertisements
Similar presentations
Low Mass Standard Model Higgs Boson Searches at the Tevatron Andrew Mehta Physics at LHC, Split, Croatia, September 27th 2008 On behalf of the CDF and.
Advertisements

H/Abb -> 4b’s process & Multi-Et-Threshold Study for 4jet Trigger Kohei Yorita Young-Kee Kim University of the FTK Meeting on July 13 th, 2006.
Introduction Ricardo Gonçalo HSG5 weekly meeting – 19 January 2012.
Brick Finding Ankara CM 2/4/2009 Dario Autiero. A large effort was put in the last months by a team of people in order to recover the events pending due.
Feb 26, 2004 Mike Hildreth – DØ Collaboration Meeting Run IIb Trigger Simulation Report Mike Hildreth & Ela Barberis for the Run IIb Trigger Simulation.
Progress on the FTK Physics Case (For H/Abb 4b signal) Kohei Yorita Young-Kee Kim University of FTK Meeting on January 26 th, 2006 (1)Brief Sample.
Recent Electroweak Results from the Tevatron Weak Interactions and Neutrinos Workshop Delphi, Greece, 6-11 June, 2005 Dhiman Chakraborty Northern Illinois.
Calice Meeting DESY 13/2/07David Ward Guidelines for CALICE presentations Recently approved by the Steering Committee.
Saclay, 04 / 11 / 2002 E. Perez 1 Simulation of the performances of the upgraded L1Cal  Short reminder  Performances (jets) (see Jovan’s talk for electron.
H. EvansRun2b L1Cal Meeting: 03-Oct-021 Nevis Design Status: Summary Hal EvansColumbia University Trigger Algorithm Board –Done  Jet, EM & Tau Sliding.
Update FTK Meeting 07/13/06 Erik Brubaker U of Chicago.

Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
THE ADVANCED TECHNOLOGY ENVIRONMENTAL AND ENERGY CENTER (ATEEC) Summative External Evaluation July 1, 2013 – June 30, 2014 PRELIMINARY OUTLINE.
Create Mailing Labels (Word 2007) Word 2007 using the Mail Merge function and an Excel spreadsheet Create mailing labels from Member Rosters in.
Proceedings and Report of the Expert Meeting: Arrangements Proceedings and Report of the Expert Meeting: Arrangements.
Assurance Continuity: What and How? Nithya Rachamadugu September 25, 2007.
Mu2e WGM 7/27/2011 R. Ray Mu2e Project manager. Director’s Review We have settled on date for the Director’s CD-1 Review; Oct Focus of review will.
United Nations Counter-Terrorism Committee Executive Directorate (CTED) Revised documents and procedures for assessing Member States’ implementation efforts.
Intro: Spin Report Update Hi Gerry (from S. Vigdor, 10/17/07), I would like to ask you to organize efforts, with the help of the others copied on this.
AGS RSVP Weekly Meeting P. Pile 27 Jan 2005 AGS RSVP Weekly Meeting 27 Jan 2005 Useful Links: RSVP Project : C-AD.
Process Management  Identify and involve stakeholders  Find common vision and mission  Define roles and responsibilities  Monitor/evaluate team effectiveness.
T. Kawamoto1 Small Wheel upgrade project Muon week, upgrade meeting T. Kawamoto.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
Principal Leadership Academy November 2012 Project Management System.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
P5 and the HEP Program A. Seiden Fermilab June 2, 2003.
LHC (and ATLAS) Status and Plans
Collider Detector at Fermilab Sung-hyun chang High Energy Physics lab. KNU.
Physics Validation. Validations 18/12/13: DC14 (1) 5 validation tasks for this week: Several DC14 simulation tests, grouped into 3 tasks 2 tasks on IBL/ITK.
Doc.: IEEE / Submission March 2004 Larry Taylor (Staccato)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
Introduction to Web Authoring Ellen Cushman Class mtg. #19.
Presentation Title | May 4, 2009 Human Resources HR.
DUSEL Beamline Working Group Meeting March 09, :00 AM – Snake Pit (WH2NE) By Dean Hoffer - OPMO.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting September 21, 2004.
Brenna Flaugher Sept. 24 th Lehman Review1 Run IIB Silicon Upgrade: Cost and Schedule Lehman Review Sept. 24, 2002 Brenna Flaugher Run IIB Silicon Project.
Find-A-Church.org is much more than a directory of churches. Find-A-Church.org.
Update on Chesapeake Bay Program Developments Briefing to the Water Resources Technical Committee October 9, 2009 (revised) Briefing to the Water Resources.
STEP-BY-STEP GUIDE VIU POLICY REVIEW PROCESS. STEP 1 SUBMISSION Scheduled Review  Every 5 years (at least) to Executive Responsible  Delegated.
10/24/2003Yu Chul Yang(CHEP,KNU) Accelerator & Detector 1.Accelerator 2. Tevatron 3. Detector 4. CDF Detector.
AGS RSVP Weekly Meeting P. Pile 6 Jan 2005 AGS RSVP Weekly Meeting 6 Jan 2005 Useful Links: RSVP Project : C-AD.
H ➝ bb Note Meeting Malachi Schram, McGill Ricardo Gonçalo, RHUL H->bb 7TeV meeting, 5/11/2011.
November 1, 2004 ElizabethGallas -- D0 Luminosity Db 1 D0 Luminosity Database: Checklist for Production Elizabeth Gallas Fermilab Computing Division /
MICE – Video conference Alain Blondel, 17 December   MICE selected NEWS: Future meetings Safety review Study of controls Gateway I & Toward Gateway.
La Thuile, March, 15 th, 2003 f Makoto Tomoto ( FNAL ) Prospects for Higgs Searches at DØ Makoto Tomoto Fermi National Accelerator Laboratory (For the.
Thomas Jefferson National Accelerator Facility Page 1 FNAL/JLab weekly meeting, April 23, 2014 Agenda  Path Forward  Status at FNAL  Status at JLab.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Creating your own quiz ClickClick here to open the quiz webpage This quiz will go with your PowerPoint. It will be created to test students on the information.
IUCN WCPA Best Practice Guidelines and Technical Report Series - Overview 1 Technical Report & 10 Best Practice documents in preparation 1 Technical Report.
TDR end game. Timeline constraints We need to use the current momentum to conclude the TDR work Needed by all funding agencies to support funding requests.
H->bb Note Plans for Summer Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 21 June 2011.
News and Miscellaneous Didier Contardo, Jeff Spalding UPO August 03/ UPO 08/03/12.
Management Items – (John) EC comments on TDR snapshot (Brian) Editing status reports (Editors) Other items, wrap-up 1 TEB webex meeting, 6 Aug 2012 Global.
INT’L FORMATTING WORKSHOP
Physics Analysis Summaries towards a proposal
Preparation for CERN test beam
SM Higgs for Summer p17 publications:
SKADS Controller’s Meeting Timeline Annual Financial Report
DØ and Hunting the Higgs at Arizona
Jan Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: In response to r0 “Proposal for PFD”
Jan Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: In response to r0 “Proposal for PFD”
WG Technical Editor’s Report
Arnaud Duperrin (CPPM Marseille)
Geant4 Documentation Geant4 Workshop 4 October 2002 Dennis Wright
Submission Title: [Task Group 1 Report] Date Submitted: [8May00]
Ctclink executive leadership committee May 31, 2018
Agile Project Management and Quantitative Risk Analysis
PAC47 Charge Robert McKeown PAC47 July 29, 2019.
Presentation transcript:

H. EvansRun2b L1Cal Meeting: 22-Aug-021 Temple Review Post-Mortem Hal Evans Aug: Director’s Rev. of all CDF & DØ Run IIb Projects –Prep for DOE (Lehman) review: week of 23 Sep. –Reviewed: Technical Aspects / Cost & Schedule –Technical Committee Members  L.Bauerdick*, F.Forti, D.Marlow*, J.Pilcher**, M.Selen*, H.Sadrozinski, H.Tajima Review went well on all fronts (thanks!) –New Tevatron Run IIb baseline  L = 4x10 32 cm -2 s -1 & 396 ns bunch spacing –Documentation basically ok  need more on Basis of Estimate –Technical side also sound. Only 2 recommendations:  “The proponents should try to characterize the performance of the upgraded system with a few global figures of merit. The PAC has emphasized the Higgs detection significance.”  “This task appears ready to baseline.”

H. EvansRun2b L1Cal Meeting: 22-Aug-022 Schedule to Lehman Week ofTasks to Finish Aug 19 Final changes to schedule by groups Submit note of adequacy of L2 & L3 processing power Aug 26 1 st draft of responses to review circulated Revise TDR (mainly simulation for L1Cal) Final Project Management Plan Sep 2 Schedule Frozen (except for BOE changes) TDR to internal DØ editors Final draft of responses to review Sep 9 Final TDR version complete Practice talks All Lehman Review material posted to web (9/13) Sep 16 Committee reads documentation Sep 23 Lehman Review

H. EvansRun2b L1Cal Meeting: 22-Aug-023 What We Need to Do Fill holes in Schedule Basis of Estimate –see L1Cal Web  Documents  Administratia Address Technical Committee’s comment 1.Increase in Higgs sensitivity wrt current trigger ZH  vvbb (& H   ???) 2.High Pt trigger menu with rate comparisons probably too ambitious 3.Other suggestions ??? Double-check rate numbers Compare Data vs MC for current conditions –see Josh Kalk’s numbers Update TDR with new simulation results –Jet Algorithmnew eff. vs rate plot(s) –EM Algorithmnothing here? –Tau Algorithmnew eff vs rate plot –ICRnothing here?

H. EvansRun2b L1Cal Meeting: 22-Aug-024 Data vs MC Rates (now) DataMC QCD5 TriggerL = 15e30L = 20e30L = 18e30 cem(1,5) ±25 cem(1,10)385055±7 cem(1,15) ±5 cem(2,5)273638±6 cem(2,10)123±2 cem(1,5)cjt(2,5)527062±10 cem(1,10)cjt(2,5)121617±5 cem(1,10)cjt(2,7)7910±4 cem(1,15)cjt(2,7)344±2 cem(1,10)cjt(2,10)9125±3 cjt(2,3) ±25 cjt(2,5)547270±10 cjt(3,5)101313±4 cjt(3,7)234±3 cjt(4,5)341.5±1.5 cjt(4,7)