1 LHeC Considerations for a Lepton Hadron Collider Option for the LHC F. Willeke, BNL The 4th Electron Ion Collider Workshop Hampton University, 19-23.

Slides:



Advertisements
Similar presentations
Linac-LHC ep Collider Options F. Zimmermann, F. Bordry, H.-H. Braun, O.S. Bruning, H. Burkhardt, A. de Roeck, R. Garoby, T. Linnecar, K.-H. Mess, J. Osborne,
Advertisements

Beam-Beam Effects for FCC-ee at Different Energies: at Different Energies: Crab Waist vs. Head-on Dmitry Shatilov BINP, Novosibirsk FCC-ee/TLEP physics.
Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
Design Considerations LHC hadron beams: E p =7 TeV E A =E e  Z/A Luminosity O (10 33 ) cm -2 s -1 with Beam Power 100 MW (wall plug) Integrated e ± p.
Diffractive DIS with E e =70GeV and E p =7TeV at the LHeC For general physics aim and sketch of machine design, see plenary talk of E. Perez … … what could.
CESR-c Status CESR Layout - Pretzel, Wigglers, solenoid compensation Performance to date Design parameters Our understanding of shortfall Plans for remediation.
The Large Hadron electron Collider (LHeC) at the LHC F. Zimmermann, F. Bordry, H.-H. Braun, O.S. Brüning, H. Burkhardt, A. Eide, A. de Roeck, R. Garoby,
ERHIC design status V.Ptitsyn for the eRHIC design team.
Recirculating pass optics V.Ptitsyn, D.Trbojevic, N.Tsoupas.
Luminosity Prospects of LHeC, a Lepton Proton Collider in the LHC Tunnel DESY Colloquium May F. Willeke, DESY.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
Brain Gestorme: Status of the LHeC Ring-Ring / Linac- Ring Basic Parameters I appologise to talk about things you already know...
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Issues.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility EIC Collaboration Meeting, Hampton University, May 19-23,
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
Page 1 An lepton energy-recovery-linac scalable to TeV Vladimir N. Litvinenko Stony Brook University, Stony Brook, NY, USA Brookhaven National Laboratory,
Accelerator Group for LHeC LHeC Meeting at CERN; October Questions raised by Max  does the e-ring fit into the tunnel?  can one bypass ATLAS and.
ERHIC Conceptual Design V.Ptitsyn, J.Beebe-Wang, I.Ben-Zvi, A.Fedotov, W.Fischer, Y.Hao, V.N. Litvinenko, C.Montag, E.Pozdeyev, T.Roser, D.Trbojevic.
Summary of the Accelerator Working Group 1st ECFA LHeC Workshop; 1-3 September 2008, Divonne 1 First discussions started at CERN at the end of last year.
ERHIC with Self-Polarizing Electron Ring V.Ptitsyn, J.Kewisch, B.Parker, S.Peggs, D.Trbojevic, BNL, USA D.E.Berkaev, I.A.Koop, A.V.Otboev, Yu.M.Shatunov,
ERHIC design status V.Ptitsyn for the eRHIC design team.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility 1 Alex Bogacz EIC14 Workshop, Jefferson Lab, March 20,
Flat-beam IR optics José L. Abelleira, PhD candidate EPFL, CERN BE-ABP Supervised by F. Zimmermann, CERN Beams dep. Thanks to: O.Domínguez. S Russenchuck,
1 BINP Tau-Charm Project 3 February 2010, KEK, Tsukuba E.Levichev For the BINP C-Tau team.
F. Willeke, Snowmass Luminosity Limitations of e-p Colliders Extrapolation from HERA Experience Examples for IR Layout LINAC-Ring Limitations HERA.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
FCC-ee booster: preliminary design study Dmitry Shwartz BINP
Lattice design for FCC-ee Bastian Haerer (CERN BE-ABP-LAT, Karlsruhe Institute of Technology (KIT)) 1 8 th Gentner Day, 28 October 2015.
E. Todesco, Milano Bicocca January-February 2016 Unit 2 Magnets for circular accelerators: the interaction regions Ezio Todesco European Organization for.
P OSSIBILITIES FOR MAINTAINING AA AND PP CAPABILITIES IN PARALLEL WITH E RHIC V. Ptitsyn Collider-Accelerator Department BNL RHIC and AGS Users Meeting,
Present MEIC IR Design Status Vasiliy Morozov, Yaroslav Derbenev MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
Introduction of Accelerators for Circular Colliders 高亮度 TAU-CHARM 工厂 & 先进光源, 2014/09.
Optics with Large Momentum Acceptance for Higgs Factory Yunhai Cai SLAC National Accelerator Laboratory Future Circular Collider Kick-off Meeting, February.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility 1 LHeC Workshop, Chavennes-de-Bogis, June 26, 2015 LHeC.
HF2014 Workshop, Beijing, China 9-12 October 2014 Challenges and Status of the FCC-ee lattice design Bastian Haerer Challenges.
Please check out: K. Ohmi et al., IPAC2014, THPRI003 & THPRI004 A. Bogomyagkov, E. Levichev, P. Piminov, IPAC2014, THPRI008 Work in progress FCC-ee accelerator.
BINP tau charm plans and other projects in Turkey/China A. Bogomyagkov BINP SB RAS, Novosibirsk.
FCC-ee Interaction Region design
LHeC interaction region
Beam-beam effects in eRHIC and MeRHIC
Large Booster and Collider Ring
Lattice design of a 10 GeV electron ring for eRHIC
CEPC-SppC Accelerator CDR Copmpletion at the end of 2017
eRHIC with Self-Polarizing Electron Ring
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
Other issues and concepts under study Conclusions References
DA Study for the CEPC Partial Double Ring Scheme
Progress of SPPC lattice design
CEPC partial double ring scheme and crab-waist parameters
LHC (SSC) Byung Yunn CASA.
Collider Ring Optics & Related Issues
Negative Momentum Compaction lattice options for PS2
Overall Considerations, Main Challenges and Goals
CEPC Partial Double Ring Parameter Update
Sawtooth effect in CEPC PDR/APDR
Negative Momentum Compaction lattice options for PS2
MEIC New Baseline: Luminosity Performance and Upgrade Path
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
JLEIC Main Parameters with Strong Electron Cooling
MEIC New Baseline: Part 7
MEIC New Baseline: Performance and Accelerator R&D
MEIC Alternative Design Part V
More on MEIC Beam Synchronization
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
MEIC Alternative Design Part III
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Presentation transcript:

1 LHeC Considerations for a Lepton Hadron Collider Option for the LHC F. Willeke, BNL The 4th Electron Ion Collider Workshop Hampton University, May, 2008 Ring–Ring Option Linac Ring Option

2 LHeC a physics opportunity with a Threefold physical goal: New Physics - QCD and EW Physics – High Parton Density

3 Several Options under consideration : p-Ring-e-Ring: “conservative”, limited in c.m. energy, luminosity limited by RF power, beam-beam limited p-Ring-e-Linac: No energy limit (in principle), luminosity severely limited by RF power, beam-beam limit ERL Option: very exotic, energy limited, RF power limitation and beam-beam limit reduced

4

5

6 Recircularing Linac Scheme proposed by Hans Braun

7 Ring – Ring Option Design Study J.Dainton, M.Klein, P.Newman, E.Perez, F.Willeke A high luminosity approach based on matured accelerator technology and on experience in operating HERA. Design Goal: L = cm -2 sec -1 with 1.4 GeV centre of mass energy

8 Design Asumptions *) based on LHC Proton beam parameters Energy E p = 7 TeV Particles per Bunch N p = Emittance  Np = 3.75 rad  m Bunch spacing  b = 25 ns Bunch Length  p = 7.55 cm E e = 70 GeV Circumference = m *) There are more optimistic parameters under discussion for the LHC Upgrade

9 Luminosity Matched beam cross sections at IP  xp =  xe,  yp =  ye Lepton Beam-beam tune shift limit to be avoided With the proton beam brightness given by LHC, N p  p /  Np =3.2·10 20 m -1

10 Lepton Beam Current Assumptions: Limited by RF Power only depends on Bending radius  = 80% ∙ (C LHC -8∙L straigth ) / 2  = 2886 m eU loss = C g E e 4 / (e   MeV If 50 MW beam power considered as a limit 5000 h/y x 50MW x 5 = 1250 GWh/y  I e = 68mA ( with  t=25ns  N e = )

11 e-Ring Lattice Parameters bend radius & circumference fixed by LHC effective FODO structure chosen (no alternative) the only choice to be made id the FODO cell length or the number of cell length of the arc  This determines the lepton beam emittance and the dynamic aperture Constraints under the assumption of matched beam sizes at the IP: Small emittance  large  *  strong beam-beam effect  no stability large emittance  small  *  strong hourglass effect effect  less lumi Long cells  large emittance  reduced dynamic aperture  no stability Short cell  small emittance, high cost

12 Choosing Lepton Ring Lattice Parameters

13 Main Parameters of LeHC

14 e Lattice 8 Octants with 500m Straight section each 376 FODO cells, Cell length 60.3 m Dipole length 2 x m B= 810 Gauss Quadrupole length 1.5 m (G = 8 T/m) bend 54m 12.52m   xe = 8 nm  fodo = 72 degree

15

16 Tunnel Cross Section

17 Which IR?

18 Bypass around Atlas and CMS No additional radiation Little, easy to correct influence on Circ. But Existing Bypass Tunnels probably not available H. Burckhard

19

20 Additional Tunnels needed From H. Burckhard, DIS 08

21 IR Layout

22

23 IR Parameters  xp =  xe,  yp =  ye  xp = 0.5 nm  xe = 7.6 nm Need to match “flat” e beam with “round” p beam  xp /  yp ≈ 4   xp = 1.8 m  yp = 0.5 m  xe = 12.7 cm  ye = 7.1 cm IR optics with low-beta tripletts for both e and p beams

24 IR Layout IR free space: 1.25m x 2 Acceptance angle 10 degree Crossing angle 2mr IR free space: 1.25m x 2 Acceptance angle 10 degree Crossing angle 2mr

25 Beam Separation e-low-beta triplets Vertically focussing Quadrupole magnet for p Other P beam Crossing angle 2mr Magnetic separation 2mr  60 mm

26 Crab Crossing p e  c =(0.5-3)mr “Crabbed Trajectories IPTransverse RF resonators Crab Cavities  c /2    degree Crossing angle will enhance effective beam size  2 =  +  2  s 2 p e IP Crab cavity

27

28 Synchrotron Radiation  ir = m

29 SR Power Density on Absorber

30

31 Beam-Beam Effect Central crossing beam-beam parameters well within the HERA range

32 Parasitic Crossings

33 Luminosity vs Bunch Spacing L independent of bunch spacing as long as I e total can be maintained At very large bunch spacings limitations by - Proton beam-beam effect - Single bunch instabilities of e-beam (up to 75ns bunch spacing far from becoming a problem)

34 Quadrupole Magnets

35 From H. Burckhard, DIS08

36 LHeC Activities The first ECFA-CERN workshop on the LHeC is announced,: The workshop takes place at Divonne, not far from CERN, Monday-Wednesday The working group convenors are nominated and can be found on the web page. The LHeC work will focus on the work of these groups in the preparation for the workshop and beyond. Meeting on exchange of information on the LHeC project status and on the NuPECC long range planning. NuPECC expressed an interest in the LHeC. NuPECC has formed a study group on the future of lepton-hadron colliders, which will investigate the potential of the EIC (eRHIC/ELIC) and the LHeC as part of NuPECC's long range planning. At the DIS08 meeting new physics studies and updates on the two machine options were presented by Helmut Burkardt (Ring-Ring) and by Hans Braun(Linac-Ring).

37 Conclusions Comparison of different options ring-ring, ring linac and ERL show specific advantages of each of the options. The final physics case, and the cost/luminosity and energy trade off will decide which option is the most favorable one. A first look at a ring-ring based lepton proton collider in the LHC tunnel with a luminosity of cm -2 s -1 appears to be technical possible Simultaneous operation of pp and ep should be possible (however with reduced pp luminosity) More work is needed to determine the most optimum parameters, the optimum technical choices and the cost of such a facility, a workshop had been held, several working groups (CERN, CI, DESY) have started to work out scenarios in more detail Further activities on the layout of the accelerator should b coordinated with and integrated into the discussions on LHC upgrades