Bill Atwood, SCIPP/UCSC, May 8, 2006 GLAST 1 Partial validation of v9r3 - Bkg. Rej. Comparison 2000 sec. of backgrounds were run using v9r3 (heros: Tom.

Slides:



Advertisements
Similar presentations
Bill Atwood, SCIPP/UCSC, Jan., 2006 GLAST 1 A Time Differencing Technique for doing Blind Pulsar Searches Bill Atwood, Brian Baughman, Marcus Ziegler,
Advertisements

Status report on Light Simulator Claudia Cecchi Francesca Marcucci Monica Pepe Software meeting Udine January
Bill Atwood, SCIPP/UCSC, June, 2004 GLAST 1 Tracker SAS Analysis Objective: To expose the tools and an approach to understanding the GLAST Tracker Initially.
Bill Atwood, August, 2003 GLAST 1 Covariance & GLAST Agenda Review of Covariance Application to GLAST Kalman Covariance Present Status.
GLAST LAT ProjectIA Workshop 6 – Feb28,2006 Preliminary Studies on the dependence of Arrival Time distributions in the LAT using CAL Low Energy Trigger.
Bill Atwood, SCIPP/UCSC, Apr. 3, 2006 GLAST 1 Pass 4 and Preparing for the LAT Handoff to NASA Why we can't go with the DC2 Analysis (Pass 3) 1) Background.
S. Ritz1 Checking Out What is Checked In  Need to optimize balance of checking between users and developers. –infuse more of a culture of detailed checking.
Bill Atwood, SCIPP/UCSC, Jan. 30, 2006 GLAST 1 Closer to Reality From Last Talk ( 7-Jan-06) – things seemed Great! However... 1) In estimating the SRD.
Bill Atwood, SCIPP/UCSC, Oct, 2005 GLAST 1 DC2 Discussion – What Next? 1)Alternatives - Bill's IM analysis - ???? 2)Backing the IM Analysis into Gleam.
GLAST LAT ProjectCU Beam Test 11/8/2005 L. Latronico1 Glast LAT Calibration Unit Beam Test at CERN Overview of Tasks 11/8/2005.
Series: Guide to Investigating Convergence. Understanding the Convergence of a Series.
Bill Atwood, SCIPP/UCSC, Oct, 2005 GLAST 1 Background Files Available Processed 500M v7r2 Bkg. events run at SLAC Processed 2M v7r2 All Gammas Processed.
PositronBG_ ppt 1 Positron BG on GLAST/EGRET GLAST Calibration/Analysis VRVS meeting April 17, 2006 Tsunefumi Mizuno Hiroshima University.
GLAST LAT Project 1S. Ritz Discussion: To Where From Here? DC1 Closeout Meeting February 13, 2004 S. Ritz Gamma-ray Large Area Space Telescope.
Bill Atwood, SCIPP/UCSC, Dec., 2003 GLAST 1 DC1 Instrument Response Agenda Where are we? V3R3P7 Classification Trees Covariance Scaled PSF Pair Energies.
Series: Guide to Investigating Convergence. Understanding the Convergence of a Series.
Bill Atwood, SCIPP/UCSC, Nov, 2003 GLAST 1 Update on Rome Results Agenda A eff Fall-off past 10 GeV V3R3P7 Classification Trees Covariance Scaled PSFs.
Bill Atwood, SCIPP/UCSC, August, 2005 GLAST 1 Energy Method Selections Data Set: All Gamma (GR-HEAD1.615) Parametric Tracker Last Layer Profile 4 Methods.
Bill Atwood, SCIPP/UCSC, Dec., 2003 GLAST ALL GAMMAs using the New Recons First runs of ALL GAMMA – from glast-ts and SLAC Unix farm glast-ts sample: no.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
The CU Beam Test at CERN Status Report and highlights from workshop II Luca Latronico LAT C&A Meeting May
Residual Background events after Rejection Cuts M total background events (GlastReleasev3r3p7) 344 residual events after Bill's rejection cuts. 342.
Analysis Meeting 17 Oct 05T. Burnett1 UW classification: background rejection Update with new all gamma and background samples.
Bill Atwood, SCIPP/UCSC, Jan. 30, 2006 GLAST 1 Post Processing & Pass4 The time for DC2 is drawing to a close. However we're still only part ways up the.
Bill Atwood, SCIPP/UCSC, DC2 Closeout, May 31, 2006 GLAST 1 Bill Atwood & Friends.
T. Burnett: IRF status 5-feb-061 DC2 IRF Status Meeting agenda, references at:
GLAST LAT ProjectIA Workshop 6 – Feb27,2006 S. Ritz Backgrounds and Trigger Rates 1 Backgrounds and Trigger Rates on Orbit S. Ritz with many contributions.
Analysis Meeting 14Nov 05T. Burnett1 Classification, etc. status at UW New application to apply trees to existing tuple Background rejection for the v7r2.
Background runs at the UW “farm” A little background: we have installed the GRID-standard condor from the other UW in Madison. –Currently 6 CPUs available,
GLAST LAT Project Test Beam Meeting, June 6, 2006 S. Funk 1/6 PS Positron Simulations Stefan Funk June 6, 2006.
New Ntuple Variable: CalEdgeEnergy Leon R. C&A Meeting 12 December 2005.
GLAST LAT Project 1S. Ritz Purposes of the Data Challenges “End-to-end” testing of analysis software. –define the ends –define the tests (what is success?)
GLAST LAT Project Analysis Meeting April 22, 2004 E. do Couto e Silva 1/5 SVAC Status SVAC Status Eduardo do Couto e Silva April 22, 2004.
Bill Atwood, SCIPP/UCSC, Oct, 2005 GLAST 1 Back Ground Rejection Status for DC2 a la Ins. Miner Analysis.
Bill Atwood, SCIPP/UCSC, Jan., 2006 GLAST 1 The 3 rd Pass Back Rejection Analysis using V7R3P4 (repo) 1)Training sample: Bkg: Runs (SLAC) v7r3p4.
Analysis meeting 11July05 - T. Burnett 1 Status of the Background Review DC2 prep meeting: Switch to CRflux package by Mizuno for charged particles, Earth.
GLAST LAT Project SLAC Jan. 12, 2004 Hammer-Aitoff map.
R.Dubois Sim/Recon Overview 1/10 GLAST LAT ProjectSoftware Workshop July, SLAC Sim/Recon Overview Elements of Simulation/Reconstruction Development,
Pass 6: GR V13R9 Muons, All Gammas, & Backgrounds Muons, All Gammas, & Backgrounds Data Sets: Muons: allMuon-GR-v13r9 (14- Jan-2008) AG: allGamma-GR-v13r9.
Feb. 7, 2007First GLAST symposium1 Measuring the PSF and the energy resolution with the GLAST-LAT Calibration Unit Ph. Bruel on behalf of the beam test.
GLAST LAT Project 1S. Ritz Data Challenge Planning Overview Purpose Boundary conditions Plan: –scope and progression of data challenges –schedule summary.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
X. Chen 1 GLAST LAT Project EM data analyses meeting X. Chen 1 Software infrastructure used in EM data analyses Xin Chen November 19, 2003.
Bill Atwood, 6-Feb-2008 Pass 6: GR V13R9 Muons, All Gammas, & Backgrounds Muons, All Gammas, & Backgrounds Overview Overview Data Sets: Muons: allMuon-GR-v13r9.
1 Study of Data from the GLAST Balloon Prototype Based on a Geant4 Simulator Tsunefumi Mizuno February 22, Geant4 Work Shop The GLAST Satellite.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/ Particle Test 1 GLAST Large Area Telescope: Particle Test “Roadmap to Integration”
Report of GLAST Balloon Flight October Annual meeting of Astronomical Society of Japan T. Mizuno and other GLAST Balloon Team
LAT Performance Updates Plans and Procedures
Background Rejection Activities in Italy
Simulation Tools for Test Beam
Background Rejection Prep Work
Comparison of GAMMA-400 and Fermi-LAT telescopes
Gamma-ray Large Area Space Telescope
GLAST Large Area Telescope:
IS IT EFFECTIVE TO RUN ONLINE DATING BACKGROUND CHECKS YOURSELF?
Prospects for Observations of Microquasars with GLAST LAT
Proposal for LAT Year 1 Data Release Plan
Finding the Slope of a Line Unit 7.02
Event Classification & Background Rejection
LAT Software Quality Assurance
Overview Goal Study GEM variables in SVAC ntuple
LAT performance for DC2 and the “4-panel plot”
Sabra Djomehri SULI 2007 Stanford Linear Accelerator 8/15/2007
Tower A: A First Look Finding the Data: Login: THIS ONE! user: glast
Searching for photons in the LAT
And plan for SICBDST retirement
Status Report and highlights from workshop II
GLAST Large Area Telescope
GLAST Large Area Telescope:
Presentation transcript:

Bill Atwood, SCIPP/UCSC, May 8, 2006 GLAST 1 Partial validation of v9r3 - Bkg. Rej. Comparison 2000 sec. of backgrounds were run using v9r3 (heros: Tom G. & Richard D. &Tracy U. & … many more) Test: Does this the new GR (new G4, new Gaudi, new root,…) yield the (statistically) same back rej. in DC2?

Bill Atwood, SCIPP/UCSC, May 8, 2006 GLAST 2 DC2

Bill Atwood, SCIPP/UCSC, May 8, 2006 GLAST 3 v9r3

Bill Atwood, SCIPP/UCSC, May 8, 2006 GLAST 4 Pass 4 and Preparing for the LAT Handoff to NASA 1) Change event axis in CalValsCorrTool to Tkr1 definition 2) New ACD Variable: AcdTkrRibbonDoca (2 flavors) 3) New Tkr. Vars. : TkrLATEdge 4) New Trk-Cal Variables: CalTkrXtalDispersion (4 flavors) The new Glast Release seems to check out - All Gammas – Performed new energy analysis - Background – Can repeat DC2 analysis Now ready to check out new: - New Flux Model - New Blanket Model Suggest here ~ 200M Bkg. - Can do both together?

Bill Atwood, SCIPP/UCSC, May 8, 2006 GLAST 5 Data Reprocessing Requirements All Gamma Run: need 2M Background: 2B run (1B to train with and 1B to investigate residual) (this is minimal – 4-5B would be better) Diffuse: 1 day (as before)