Amorphous Ornament CNC Fabrication in Contemporary Architecture.

Slides:



Advertisements
Similar presentations
URBAN DESIGN Members Michelle Salas Jorge Ricaute Melanie García.
Advertisements

Chapter 9 User-centered approaches to interaction design By: Sarah Obenhaus Ray Evans Nate Lynch.
COMPUTER GRAPHICS CS 482 – FALL 2014 NOVEMBER 10, 2014 GRAPHICS HARDWARE GRAPHICS PROCESSING UNITS PARALLELISM.
The mouth is the second most expressive feature of the face. Great care should be taken in drawing its shape as it is a key element in achieving a likeness.
Chpter#5 -part#1 Project Scope and Human Resource Planning
Teknologi Dan Rekayasa TECHNOLOGY AND ENGINERRING PROGRAM STUDI KEAHLIAN (SKILL DEPARTEMEN PROGRAME) : TEKNIK BANGUNAN (BUILDING TECHNOLOGY) KOMPETENSI.
Defining the Project CHAPTER FOUR Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Defining the Project Chapter 4.
AMORPHOUSORNAMENT. Russell Loveridge - Marcus Braach - HA - If Ebnoether.
9/6/2001Database Management – Fall 2000 – R. Larson Information Systems Planning and the Database Design Process University of California, Berkeley School.
Southern Literature A distinct type of American Literature. Written by authors who were born in or spent most of their lives in the South. Tells us what.
Modern Navigation Thomas Herring
Islamic Art Gallery Assignment Steven George December 5, 2013.
Roman Pantheon By Grace 6C.
Assessment Activities
Enterprise Architecture
Dr. Howard Eisner Professor Emeritus, GWU SEDC CONFERENCE, April 2014 SYSTEM ARCHITECTING – VIEWS vs. FUNCTIONS vs. ALTERNATIVES.
Persian Tiles  Students will learn to make tiles using under-glaze and majolica techniques.  The lesson incorporates art history, multi-culture, aesthetics,
Kitchen & Bath Lighting. A good lighting design should: Look good – both people and design space Provide the proper amount of light in every room Be.
Chapter 7 THE MICROSCOPE.
Defining the Project CHAPTER FOUR PowerPoint Presentation by Charlie Cook Copyright © 2014 McGraw-Hill Education. All Rights Reserved.
Unit 5:Elements of A Viable COOP Capability (cont.)  Define and explain the terms tests, training, and exercises (TT&E)  Explain the importance of a.
Testing Challenges in an Agile Environment Biraj Nakarja Sogeti UK 28 th October 2009.
TOPIC-9- PROJECT ORGANIZATION
Architectural Style of the Chernivtsi Gymnasium #5 (project)
10 Software Architecture CSCU 411 Software Engineering.
Chapter 1 Introduction to Statistics. Statistical Methods Were developed to serve a purpose Were developed to serve a purpose The purpose for each statistical.
IT Strategic Planning.
Service Oriented Architecture (SOA) Dennis Schwarz November 21, 2008.
1 What is OO Design? OO Design is a process of invention, where developers create the abstractions necessary to meet the system’s requirements OO Design.
EEL 5937 Managing mutability in agents EEL 5937 Multi Agent Systems Lecture 26, April 10, 2003 Lotzi Bölöni.
Added Notes August 31, 2005.
Doc.: IEEE /0431r0 Submission April 2009 Alexander Maltsev, Intel CorporationSlide 1 Polarization Model for 60 GHz Date: Authors:
Why Standardize Metadata?. Why Have a Standard? Think for a moment how hard it would be to… … bake a cake without standard units of measurement. … put.
Introduction to Plan of a building Instructor Engr Kamran Khan Department of civil engineering City University Peshawar.
Texture & pattern elements of design. Texture is the properties held and sensations caused by the external surface of objects received through the sense.
Video Composition Media Concepts The Spill Resource Page.
Perspectives of Neighborhood and Community: A Review of the Literature
Organisation Development(OD)
SCOPE DEFINITION,VERIFICATION AND CONTROL Ashima Wadhwa.
Conductor, insulator and ground. Force between two point charges:
The collection of phases that are performed in completing a project. Each project phase is marked by completion of one or more deliverables. The conclusion.
Planning and Organizing Chapter 13. The Planning Function Planning for a business should stem from the company’s Business Plan – The business plan sets.
PERCROScuola Superiore S. Anna1 Tampere, February 16 th – 17 th th HAPTEX Meeting PERCRO Discussion: Specifications of the main Software Modules.
1 Copyright © 2009, 2006, 2003, 2000, 1997, 1994 by Saunders, an imprint of Elsevier Inc. Chapter 15 The Health Care Organization and Patterns of Nursing.
Distributed Java Programming Distributed Java Programming Class #1 August 20, 2002.
An actual or implied mark, path, mass, or edge, where length is dominant. It could be straight, curved, zig-zag, or angular.
OGC Copyright 2008, Open Geospatial Consortium Making Location Count Building Performance and Energy Analysis (BPEA) Thread 1.Definition of Early Design.
{ Pattern Landscape Building a work with line, repetition, and pattern.
ARC 102 FINAL PROJECT PRESENTATION VACATION HOUSE ARC 102 FINAL PROJECT PRESENTATION.
BUS 308 Entire Course (Ash Course) For more course tutorials visit BUS 308 Week 1 Assignment Problems 1.2, 1.17, 3.3 & 3.22 BUS 308.
Creating a Work Breakdown Structure with Microsoft Project.
1 INTRODUCTION TO COMPUTER GRAPHICS. Computer Graphics The computer is an information processing machine. It is a tool for storing, manipulating and correlating.
Management Practices Lecture 10.
Process and customizations
Architectural Symbols
Civil Engineering and Architecture. The Beginings
Understanding NMC allegations data, and developing a coding frame to categorise future allegations data Rob Francis Matt Reynolds March 2017 Restricted.
Just What Are Processes, Anyway?
Unit 6.05 and 6.06-Learning about blueprints
An Overview of Southern Literature
The Manager as a Planner and Strategist
Creative Sketchbooking
GTB Proposals to amend Regulations Nos. 7 and 48
At Keene Middle School Jan. 10, 2013
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Responsive Architecture
Principles and Elements of design
One-Point Perspective Drawing and Space
Chapter 5: Shape, Form, Space
Presentation transcript:

Amorphous Ornament CNC Fabrication in Contemporary Architecture

AmorphousOrnament - CNC Fabrication in Contemporary Architecture Final Assignment: AmorphousOrnament

AmorphousOrnament - CNC Fabrication in Contemporary Architecture Final Assignment: AmorphousOrnament

AmorphousOrnament - CNC Fabrication in Contemporary Architecture Final Assignment: The final project for the AmorphousOrnament course will be to develop an ornamented ceiling system. AmorphousOrnament

AmorphousOrnament - CNC Fabrication in Contemporary Architecture Final Assignment: There is a long history of ORNAMENT and ceilings. AmorphousOrnament

AmorphousOrnament - CNC Fabrication in Contemporary Architecture Final Assignment: There is a long history of ORNAMENT and ceilings. Ornament was chiefly used to distinguish an object or room, and provide a sense of opulence which could communicate the wealth of the owner. Ornament in the Eighteenth and nineteenth centuries were used in the decoration of churches, Nobel rooms, formal rooms of all kinds. AmorphousOrnament

AmorphousOrnament - CNC Fabrication in Contemporary Architecture Final Assignment: There is a long history of ORNAMENT and ceilings. Ornament was chiefly used to distinguish an object or room, and provide a sense of opulence which could communicate the wealth of the owner. Ornament in the Eighteenth and nineteenth centuries were used in the decoration of churches, Nobel rooms, formal rooms of all kinds. Ornamentation reached a pinnacle in its employ during the Rococo period where the competition for social stature was so great that the ornamentation of rooms and objects began to obscure their function and usefulness. During this time rooms were both painted and sculpted in ornamental fashions. AmorphousOrnament

AmorphousOrnament - CNC Fabrication in Contemporary Architecture Final Assignment: There is a long history of ORNAMENT and ceilings. Ornament was chiefly used to distinguish an object or room, and provide a sense of opulence which could communicate the wealth of the owner. Ornament in the Eighteenth and nineteenth centuries were used in the decoration of churches, Nobel rooms, formal rooms of all kinds. Ornamentation reached a pinnacle in its employ during the Rococo period where the competition for social stature was so great that the ornamentation of rooms and objects began to obscure their function and usefulness. During this time rooms were both painted and sculpted in ornamental fashions. The use of three dimensional ornament was usually limited to the upper walls and ceilings, as here it was less likely to be damaged, and could be appreciated in the limited light (no electricity) available during this time. AmorphousOrnament

AmorphousOrnament - CNC Fabrication in Contemporary Architecture Final Assignment: The use of ornamentation and the up direction has traditionally been associated with the religious beliefs that heaven, god, or goodness is above, and hell, Lucifer, or “baseness” is below. The “above” is also related to light, the sun, warmth, and life. AmorphousOrnament

AmorphousOrnament - CNC Fabrication in Contemporary Architecture Final Assignment: When discussing the definition of the work AMORPHOUS the most understandable example is that of a cloud. Clouds have no predefined form, they are constantly in the process of change, and their consistency is a product of the forces that are acting upon them at a multitude of scales. In addition clouds interact with light either from the sky or man made, to reveal their outer form. AmorphousOrnament

AmorphousOrnament - CNC Fabrication in Contemporary Architecture Final Assignment: Ornament as a craft has traditionally been developed into 2 categories, Ornament with the intention of an immediate tactile relationship to the viewer, or ornament with only an optic relationship to the viewer. AmorphousOrnament The role of ornament in each case is the same, to beautify, individualize, and characterize the context, however the differences lie in issues of scale, distance to viewer, and as a result in the fineness, quality, and resolution of the ornament. For this project we will be dealing with the OPTICAL properties of ornament.

AmorphousOrnament - CNC Fabrication in Contemporary Architecture Final Assignment: DIPLOMWAHLFACH ARBEIT The task for this project is to create a ceiling that is ornamented, and has an amorphous quality somewhat like a cloud. AmorphousOrnament

AmorphousOrnament - CNC Fabrication in Contemporary Architecture Final Assignment: DIPLOMWAHLFACH ARBEIT The task for this project is to create a ceiling that is ornamented, and has an amorphous quality somewhat like a cloud. AmorphousOrnament The ceiling should be composed of smaller elements that are distributed over its surface that define a greater geometry at the large scale and individual “motif geometries” at the smaller scales. The overall project will be composed of individual “tiles”, and the subdivision of the area will be a product of the final geometry.

AmorphousOrnament - CNC Fabrication in Contemporary Architecture Final Assignment: DIPLOMWAHLFACH ARBEIT The task for this project is to create a ceiling that is ornamented, and has an amorphous quality somewhat like a cloud. AmorphousOrnament The ceiling should be composed of smaller elements that are distributed over its surface that define a greater geometry at the large scale and individual “motif geometries” at the smaller scales. The overall project will be composed of individual “tiles”, and the subdivision of the area will be a product of the final geometry. The overall geometry and the organization of these tiles will be coordinated as a group work, following a series of decisions and parameters as defined by the group.

AmorphousOrnament - CNC Fabrication in Contemporary Architecture Final Assignment: DIPLOMWAHLFACH ARBEIT The task for this project is to create a ceiling that is ornamented, and has an amorphous quality somewhat like a cloud. AmorphousOrnament The ceiling should be composed of smaller elements that are distributed over its surface that define a greater geometry at the large scale and individual “motif geometries” at the smaller scales. The overall project will be composed of individual “tiles”, and the subdivision of the area will be a product of the final geometry. The overall geometry and the organization of these tiles will be coordinated as a group work, following a series of decisions and parameters as defined by the group. Each individual tile will then be the work of a single student, however there should be care taken to the edge conditions, the integration of pattern, motif, and ornamentation from one tile to the next.

AmorphousOrnament - CNC Fabrication in Contemporary Architecture Final Assignment: DIPLOMWAHLFACH ARBEIT For the work, there exists already a set of fixed parameters for the design. - It must fit into the “conference area” ceiling of room F It must accommodate each of the participants LightShade pendant lights. - The design of the surface should take into account the characteristics of the LightShade, and its “Rules of Ornament”. - It will be made from Regisol Foam where each student has a 1mx1m square area at 80 mm thick. - The ornamentation should respond to the given geometry, and must be programmed. AmorphousOrnament

AmorphousOrnament - CNC Fabrication in Contemporary Architecture Final Assignment: DIPLOMWAHLFACH ARBEIT Other parameters and design details may be added within the scope of the design, at the discretion of the participants. Examples: - Ventilation, Audio equipment, video equipment,… ect. AmorphousOrnament Ply architects

AmorphousOrnament - CNC Fabrication in Contemporary Architecture Final Assignment: DIPLOMWAHLFACH ARBEIT The Deliverables for the project are: The LightShade pendant lamp. A programmed ceiling surface that fits within the overal matrix of the AMORPHOUSORNAMENT. A presentation of the working methodology and results for the final critique. Full documentation of the project, to be compiled in a CD sized booklet A WELL ORGANIZED Data CD of all data collected over the course of the project. The Review Date is FRIDAY Feb 25 – at 10:00 in the morning. AmorphousOrnament

AmorphousOrnament - CNC Fabrication in Contemporary Architecture