PALM-3000 P3K Team Meeting #9 Stephen Guiwits Team Meeting #9 and 023 Robinson October 22, 2008.

Slides:



Advertisements
Similar presentations
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Advertisements

Operating System.
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
System Implementation Dr. Dania Bilal IS 551 Fall 2005.
Team 7 / May 24, 2006 Web Based Automation & Security Client Capstone Design Advisor Prof. David Bourner Team Members Lloyd Emokpae (team Lead) Vikash.
ITE PC v4.0 Chapter 1 1 Operating Systems Computer Networks– 2.
PALM-3000 Electronics PDR Stephen Guiwits Dean Palmer Ernest Croner 023 Robinson Room January 21, 2009.
PALM-3000 PALM-3000 Management Update Antonin Bouchez, Jenny Roberts Team Meeting #7 27 February, 2008.
PALM PALM-3000 project status 31 Jan COO All-Hands Mtg. Recent Milestones Requirements review on 12 Nov AO system offline for maintenance.
PALM-3000 P3K Team Meeting #16 Stephen Guiwits Dean Palmer, Ernest Croner, Antonin Bouchez Team Meeting # Cahill March 05, 2010.
PALM-3000 P3K Integration and Test Review Stephen Guiwits P3K System Computers and Electronics 273 Cahill September 22, 2010.
Compressor ReVamp and Fabrication PO9452. Update Revised Concept Generation Selected some concepts Scheduled Conference call with Dresser Rand Schedules.
PALM-3000 Integration and Testing Status A. Bouchez Team Meeting #15 10/29/2009.
PALM-3000 PALM-3000 Instrument Architecture Antonin Bouchez PALM-3000 Requirements Review November 12, 2007.
PALM-3000 PALM-3000 Status A.H. Bouchez, J.E. Roberts Project 1640 Las Vegas Summit 1/28/2010.
LGS Project Meeting February 1, 2006 Agenda 1.IPT status updates: Laser facility, AO optomechanics, AO software (Bouchez, Roberts, Trinh; 30 min) 2.Sum-Frequency.
Status of Electronics & Control System P J Smith University of Sheffield 16/12/2009.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
1 Network Packet Generator Characterization presentation Supervisor: Mony Orbach Presenting: Eugeney Ryzhyk, Igor Brevdo.
PALM-3000 Optical Bench Update Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss Team Meeting #15 10/29/2009.
PALM-3000 P3K Team Meeting #15 Stephen Guiwits Dean Palmer Ernest Croner Team Meeting # Cahill October 29, 2009.
PALM-3000 PALM-3000 Software Requirements Review Thang Trinh PALM-3000 Requirements Review, Caltech Campus November 12, 2007.
PALM-3000 ATST/BBSO Visit Stephen Guiwits P3K System Hardware 126 Cahill February 11, 2010.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
PALM-3000 Budget and Schedule Update A. Bouchez, J. Roberts Team Meeting #10 1/8/2009.
P3K RTC Status Tuan Truong & Mitchell Troy P3K Team Meeting #4 7/19/2007.
© Folens 2008 Transfer of data in ICT systems Using ICT networks.
What is a Computer Network? Two or more computers which are connected together.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Fundamentals of Networking Discovery 1, Chapter 2 Operating Systems.
Operating Systems Networking for Home and Small Businesses – Chapter 2 – Introduction To Networking.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
IT Essentials 1 v4.0 Chapters 4 & 5 JEOPARDY RouterModesWANEncapsulationWANServicesRouterBasicsRouterCommands RouterModesWANEncapsulationWANServicesRouterBasicsRouterCommands.
T ASK 4 - P6 - P RODUCE UPDATED DOCUMENTATION FOR THE MODIFICATION By Victor Remes.
1 AQA ICT AS Level © Nelson Thornes 2008 Operating Systems What are they and why do we need them?
GBT Interface Card for a Linux Computer Carson Teale 1.
EGEE is a project funded by the European Union under contract IST Testing processes Leanne Guy Testing activity manager JRA1 All hands meeting,
17-April-2007 High Performance Computing Basics April 17, 2007 Dr. David J. Haglin.
1 Palomar Tomograph V. Velur 1, B. Platt 2, M. Britton 1, R. Dekany 1 1 Caltech Optical Observatories, California Institute of Technology 2 Interferometry.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 NRL-SLAC Networking LAT Environmental.
System Implementation Dr. Dania Bilal IS 582 Spring 2009.
System Implementation Dr. Dania Bilal IS 592 Spring 2005.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Commodity Node Procurement Process Task Force: Status Stephen Wolbers Run 2 Computing Review September 13, 2005.
30 Nov 2005User Committee1 Instruments: NAC. 30 Nov 2005User Committee2 Instruments: NAC.
The Internet The History and Future of the Internet.
Brent Tufts Alex Ferreira Drew Durham Arnie Anderson Vinitha Liyanage.
3.3 Data Networks. Overview Identify the main differences between LAN and WAN. Identify the advantages of using a network over stand-alone computers.
Networks. What is a computer network? A network is two or more computers that are linked together so that they are able to share resources.
Using ICT systems The computer. Using ICT systems Computers in an ICT System Multiple computers, usually with username and password entry Looking after.
DBSP-R Upgrade Progress Review The DBSP-R Team DBSP-R Progress Review.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
13-1 MAVEN PFP ICDR, May 23 – 25, 2011 Particles and Fields Package Critical Design Review May , 2011 GSE Timothy Quinn.
2: Operating Systems Networking for Home & Small Business.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
Oct. 6, 1999PHENIX Comp. Mtg.1 CC-J: Progress, Prospects and PBS Shin’ya Sawada (KEK) For CCJ-WG.
Columbia University IN THE CITY OF NEW YORK VTX Electronics Integration E.J. Mannel Columbia University DOE Review June 2-3, 2009.
Learning Outcomes 1. Know software installation processes 2. Be able to prepare for software installation 3. Be able to install and configure software.
Revised Problems 1)Banana Plugs unable to withstand stress of CIP module and cord under 2)Physical connection problems between CIP and lock 3)Time consumption.
ESS (vacuum) control system Daniel Piso Controls Division February 20, 2013.
ITMT 1371 – Windows 7 configuration Chapter 2: Installing Windows 7 ITMT 1371 – Windows 7 Configuration.
Systems Software / The Operating System CSC October 14, 2010.
Chapter Objectives In this chapter, you will learn:
Transfer of data in ICT systems
May 7 About the Datacenter (hardware show and tell)
IS3440 Linux Security Unit 7 Securing the Linux Kernel
Rack and Interconnect Design in E-plan
Presentation transcript:

PALM-3000 P3K Team Meeting #9 Stephen Guiwits Team Meeting #9 and 023 Robinson October 22, 2008

PALM-3000 P3K Electronics Documents Electronics Requirements Document Interfaces.xls –Requires more detail Electronics Project Schedule Design Document –In the works

PALM RTC Hardware Software Installation and Test Suse Kickstart DVD Install –Complete –Custom RPMS completed and tested –Custom scripts to install Nvidia development libs Quadrics drivers EDT drivers –2 disks Disk 1 = Base + patches Disk 2 = custom scripts Quadrics Installation –Quadrics switch installed and configured –Linux driver installed –Initial communication tests completed

PALM RTC Hardware Software Installation and Test Development Rack –Will be installed next week and set up in JPL AO Lab Production Rack –Will have the initial Suse kickstart release installed next week –Will be shipped to Caltech within the following weeks

PALM-3000 RTC Rack Layout 5

PALM-3000 DM Driver Hardware –Xinetics Gen III Mirror Electronics Software –Initial test software written –Reads in command line arguments or files –Communicates over the RS 232 interface –Needs to be cleaned up and put into a linkable library Results –Able to set the driver state to active and send commands successfully

PALM-3000 DM Driver Results –Several commands are still not working ‘B’ – set the bias voltage ‘C’ – set the frame size (currently have to send full frames) ‘D’ – read the driver type Rest of the command set still needs to be tested –To complete this week Working with Xinetics –Need to actively work with Xinetics to make sure we have all the commands working required for P3K operation

PALM-3000 P3K Cassegrain Cage Racks Space Required –Require 4 rack spaces on the cassegrain cage –Two 30U for the DM electronics –Two 24 U for the general AO electronics –These spaces do not include the instrument cage

PALM-3000 P3K Cassegrain Cage Racks Locations –DM Drivers in 2 and 3 –General racks in 4 and 5 –Instrument rack in 6 This has not been confirmed by Palomar but should be possible I’ve been told

PALM-3000 DM Rack Designs Rack One

PALM-3000 DM Rack Designs Rack Two

PALM-3000 P3K General Rack Rack One

PALM-3000 P3K General Rack Rack Two

PALM-3000 DM Electronic Cooling Early stages of design: Cooling lines –Facility class or AO only –Must work in AO lab Alcohol and Water vs. Glycol All racks vs. just DM Flow rate / Vibration / Noise

PALM-3000 P3K Power P3K Power Requirements Given to Palomar Staff Major power and infrastructure upgrades needed for 200” No shared UPS for RTC Racks UPS for DM electronics?

PALM-3000 P3K Cabling Cabling design –Overall design and documentation to begin soon –DM cabling already in the works Dean working on DM cabling and has made some significant progress –Cabling from FPGA to “magic box” –“Magic box” to DM drivers –Currently working on a quick connect from the DM drivers to the mirror to speed up instrument installation and eliminate errors

PALM-3000 P3K Cabling

PALM-3000 Procurements Cassegrain Cage Computer –Spec’d and quoted SciMeasure Optical Splitter –Gave Charlie B. until December 1, 2008 to produce a quote FPGA Cards –Spec’d and quoted DVI KVM Switch –For Production RTC Racks –Quoted and Ordered