R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 LCLS RF Stability Requirements LCLS Requirements The SLAC Linac.

Slides:



Advertisements
Similar presentations
Patrick Krejcik May 3-6, 2004 Patrick Krejcik R. Akre, P. Emma, M. Hogan, (SLAC), H. Schlarb, R. Ischebeck (DESY), P. Muggli.
Advertisements

1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
ILC RF phase stability requirements and how can we demonstrate them Sergei Nagaitsev Oct 24, 2007.
1 Enhancements to the Linac Coherent Light Source.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
Patrick Krejcik LCLS April 29, 2004 Breakout Session: Controls Physics Requirements Overview P. Krejcik.
Juhao Wu Feedback & Oct. 12 – 13, 2004 Juhao Wu Stanford Linear Accelerator Center LCLS Longitudinal Feedback with CSR as Diagnostic.
Bunch Length Measurements at the Swiss Light Source (SLS) Linac at the PSI using Electro-Optical Sampling A.Winter, Aachen University and DESY Miniworkshop.
R. Akre XFEL Short Bunch Measurement and July 26, 2004 LCLS Drive Laser Timing Stability Measurements XFEL Short Bunch Measurement.
Ron Akre, Dayle Kotturi LCLS April 20, 2006 Linac Coherent.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
RF Synchronisation Issues
RF Systems and Stability Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Ron Akre, Dayle Kotturi LCLS LLRF April 16, 2007 Linac.
SLAC XFEL Short Bunch Measurement and Timing Workshop 1 Current status of the FERMI project (slides provided by Rene Bakker) Photoinjector laser system.
P. Emma, SLACICFA XFEL July 29, 2004 Electron Bunch Measurements with a Transverse RF Deflector P. Emma ICFA XFEL 2004 Workshop July 29, 2004 ICFA.
Patrick Krejcik LCLS April 7-8, 2005 Breakout Session: Controls Physics Requirements and Technology Choices for LCLS Instrumentation.
Ron Akre, Dayle Kotturi LCLS February 8, 2006 Linac Coherent.
DESY MHF-p 1 Layout of the Synchronisation System for the VUV-FEL Dipl. Ing. Henning Christof Weddig DESY Hamburg.
Stefan Simrock 3 rd LC School, Oak Brook, IL, USA, 2008, Radio Frequency Systems 1 Timing and Synchronization S. Simrock and Axel Winter DESY, Hamburg,
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
RF Synchronization Activity at SPARC A.Gallo and D. Alesini, M. Bellaveglia, R. Boni, G. Di Pirro, A. Drago, A.Ghigo P. Baldini, L. Cacciotti, M. Scampati,
Ron Akre, Dayle Kotturi LCLS LLRF September 19, 2006.
LCLS-II Linac LLRF Control System – L2, L3 Zheqiao Geng Preliminary Design Review May 7, 2012.
S2E in LCLS Linac M. Borland, Lyncean Technologies, P. Emma, C. Limborg, SLAC.
R. Akre RF / Timing August 11, 2004 LCLS Drive Laser Timing Stability Measurements Department of Energy Review of the Linac.
SPPS, Beam stability and pulse-to-pulse jitter Patrick Krejcik For the SPPS collaboration Zeuthen Workshop on Start-to-End Simulations of X-ray FEL’s August.
LLRF ILC GDE Meeting Feb.6,2007 Shin Michizono LLRF - Stability requirements and proposed llrf system - Typical rf perturbations - Achieved stability at.
UED at ASTA: LLRF and triggers Need < 100 fs jitter Currently we measure > 500 fs RMS phase noise in 10 Hz to 10 MHz bandwidth at 476 MHz Excessive phase.
UED at ASTA: LLRF and triggers Need < 100 fs jitter Currently we measure > 500 fs RMS phase noise in 10 Hz to 10 MHz bandwidth at 476 MHz Excessive phase.
Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 LLRF Outline System Concept Review Requirements.
LCLS_II High Rep Rate Operation and Femtosecond Timing J. Frisch 7/22/15.
1 Franz-Josef Decker 1 Multi-Bunch Operation for LCLS Franz-Josef Decker March 17, Definitions and goals multi-bunch within.
LCLS LLRF System October 10-13, 2005 LLRF05 B. Hong, R. Akre, A. Hill, D. Kotturi, H. Schwarz SLAC, Stanford, Menlo Park, CA 94025, USA Work supported.
J. Wu J. Wu working with T.O. Raubenheimer, J. Qiang (LBL), LCLS-II Accelerator Physics meeting April 11, 2012 Study on the BC1 Energy Set Point LCLS-II.
P. Krejcik LINAC 2004 – Lübeck, August 16-20, 2004 LCLS - Accelerator System Overview Patrick Krejcik on behalf of the LCLS.
‘S2E’ Study of Linac for TESLA XFEL P. Emma SLAC  Tracking  Comparison to LCLS  Re-optimization  Tolerances  Jitter  CSR Effects.
Sept 16-17, 2003 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Controls.
Ron Akre, Dayle Kotturi Lehman October 24-26, 2006 Linac.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
RF low level control & synchronization A. Gallo, M. Bellaveglia, L. Cacciotti SPARC review committee – ENEA Frascati – 16/11/2005.
Heung-Sik Kang Pohang Accelerator Laboratory
SABER Longitudinal Tracking Studies P. Emma, K. Bane Mar. 1, 2006
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
RF Synchronization Activity
ILC Phase Reference Distribution R&D
Timing and synchronization at SPARC
RF Synchronisation Issues
LLRF Controls Outline Requirements External Interfaces Schedule Design
Low Level RF Status Outline LLRF controls system overview
LCLS Longitudinal Feedback and Stability Requirements
FPGA Based Trigger System for the Klystron Department
LCLS Commissioning Parameters
RF Pulse Shaping.
LCLS Drive Laser Timing Stability Measurements
Low Level RF Status Outline LLRF controls system overview
LCLS RF Stability Requirements
Linac Coherent Light Source (LCLS) LLRF Preliminary Design Review LLRF Monitor and Control System September 26, 2005 Ron Akre.
Linac Coherent Light Source (LCLS) Low Level RF Status
Linac (WBS 1.2.2) Vinod Bharadwaj April 23, 2002
Linac Diagnostics Patrick Krejcik, SLAC April 24, 2002
Linac LLP Outline LINAC Long Lead Procurements
Breakout Session SC5 – Control Systems
Linac Coherent Light Source (LCLS) Low Level RF Status
Low Level RF Status Outline Overview showing hardware instances
Proposal for Smith-Purcell radiation experiment at SPARC_LAB
Linac Coherent Light Source (LCLS) Low Level RF System Injector Turn-on December 2006 February 8, 2006.
LCLS Longitudinal Feedback System and Bunch Length Monitor Juhao Wu Stanford Linear Accelerator Center LCLS DOE Review, February 08, 2006 LCLS longitudinal.
Analysis of the Phase Drift in the Main Drive Line and L2 Reference Lines along the LCLS Using MATLAB By: Guy Grubbs II.
Presentation transcript:

R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 LCLS RF Stability Requirements LCLS Requirements The SLAC Linac SLAC Linac Stability Data SPPS Measurements LCLS RF System

R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 LCLS INJECTOR / LINAC

R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 LCLS Machine Stability Tolerance Budget X-band X-X-X-X- RMS tolerance budget for <12% rms peak-current jitter or <0.1% rms final e− energy jitter. All tolerances are rms levels and the voltage and phase tolerances per klystron for L2 and L3 are  Nk larger, assuming uncorrelated errors, where Nk is the number of klystrons per linac.

R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 LINAC RF and Timing System PEP PHASE SHIFT ON MAIN DRIVE LINEMDL RF with TIMING Pulse – Sync to DR Master Oscillator is located 1.3 miles from LCLS Injector 1.3 Miles to LCLS Injector

R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 Linac Phase Reference System Main Drive Line - 3 1/8 Rigid Coax Anchored to Concrete Floor Every Sector Phase Reference Line - Each Sector Independent 1/2 “ Heliax

R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 Linac Phase Reference System Main Drive Line 3 1/8 inch Rigid Coax with 30watts Length = 31 Sectors, 15.5 furlongs 2miles, 3km : Velocity = 0.98c Anchored at each sector next to coupler and expansion joint Purged with dry nitrogen Phase Length Range 100  S/Year Phase Length Range 40  S/Day Accuracy Based on SLC Fudge Factor 0.5  S/Sector Total Variation 0.2  S rms / Sector Phase Reference Line ½ inch Heliax Cable with 1.2 Watts Phase Reference for 8 PADs (Klystrons) in the sector Length = 1 Sector, 0.5 furlongs, 332ft, 400k  S in ½” Heliax Temperature Coefficient 4ppm/  C Waveguide Water  T = 0.1  C rms 85% of the cable is regulated to 0.1  C rms 15% may see variations of 2  C rms Average Temperature Variation = 0.4  C rms  = 0.64  S rms

R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 SLAC Linac RF The PAD measures phase noise between the reference RF and the high power system. The beam sees 3.5uS of RF from SLED.

R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 LINAC RF MEETS ALL LCLS SPECIFICATIONS for 2 Seconds when running well Amplitude fast time plots show pulse to pulse variation at 30Hz. Standard deviation in percent of average amplitude over 2 seconds are 0.026% for 22-6 and 0.036% for Phase fast time plots show pulse to pulse variation at 30Hz. Standard deviation in degrees of 2856MHz over 2 seconds for the three stations are  for 22-6 and  for 22-7.

R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 LINAC RF is Out of LCLS Specs in 1 Minute 14 minutes data taken using the SCP correlation plot Note that 22-6 and 22-7 are correlated in phase and amplitude Amplitude %pp Amplitude %pp Phase Deg pp Phase Deg pp

R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 Phase as Seen by Electron is Difficult to Measure Accelerator Water Temperature Effects on the Phase Through the Accelerator -8.6  S /  F SLAC Linac Accelerator Water Temperatures  T<.08  Frms Phase Variations Input to Output of Accelerator > 0.5ºS-Band rms Single Measurement Can’t Determine the Phase the Beam Sees Passing Through the Structure to LCLS Specifications Feedback on Input Phase, Output Phase, Temperature, Beam Based Parameters (Energy and Bunch Length) is Required to Meet LCLS Specifications Accelerator Water Temperature Effects on the Phase Through the Accelerator -8.6  S /  F SLAC Linac Accelerator Water Temperatures  T<.08  Frms Phase Variations Input to Output of Accelerator > 0.5ºS-Band rms Single Measurement Can’t Determine the Phase the Beam Sees Passing Through the Structure to LCLS Specifications Feedback on Input Phase, Output Phase, Temperature, Beam Based Parameters (Energy and Bunch Length) is Required to Meet LCLS Specifications

R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 Linac Phase Stability Estimate Based on Energy Jitter in the Chicane SLAC Linac 1 GeV 30 GeV 30 GeV 9 GeV e  Energy (MeV) BPM  2  1/2  < 0.1 deg (100 fs)  E /E 0  0.06%

R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 LCLS Phase Noise Associated Time Referenced to Beam Time LCLS LaserNeed to Measure 10uS to 1mS LCLS Gun1.1uS SLED / Accelerator 3.5uS Phase Detector (Existing)30nS Distribution System200nS c-97%c=100nS Far Hall Trigger2uS c-80%c=2uS TIME -3.5us SLED Starts to Fill -1.1uS Gun Starts to Fill -2uS Far Hall Trig RF Starts Trip Beam Time 0 Reference

R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 Phase Noise of SLAC Main Drive Line Noise Floor of About -120dBc/38Hz = -136dBc/Hz = 120fS rms Jitter in 5MHz BW New Oscillators Have a noise floor of 476MHz 11fS rms Jitter in 5MHz BW or 31fS rms Jitter in 40MHz BW

R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 SPPS Laser Phase Noise Measurements Phase Noise of Output of Oscillator with Respect to Input Measurement done at 2856MHz with External Diode

R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 Jitter determination from Electro Optic sampling ErEr Principal of temporal-spatial correlation Line image camera polarizer analyzer EO xtal  seconds, 300 pulses:  z = 530 fs ± 56 fs rms  t = 300 fs rms single pulse A. Cavalieri centroid width

R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 LINAC SECTOR 20 – LCLS INJECTOR RF Stability < 50fS rms : Timing/Trigger Stability 30pS rms

R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 LCLS RF System – Sector 20 Layout 100ft ½” Heliax = 0.3ºS/ºF

R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 Beam Trigger for User Facility Wide Bandwidth – Rising Edge of 8nS ? Low Phase Noise – 30fS Stability Design Needs Input

R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 LCLS RF System Injector RF – FY06 Upgrade of existing system / Lower Noise Timing requirements Injector/L1 Phase Reference System Phase and Amplitude measurement system Solid State Sub-Boosters Beam Phase Monitor System X-Band RF system – FY06 Linac Phase Reference System – FY07 Linac Feedback Control – FY07 Far Hall Trigger – FY08 Feedback Development – FY07

R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 Near Term (6 Month) Tasks Measure Phase Noise and Response of SPPS Laser Install New Oscillator, -157dBc/Hz floor, in Accelerator and Measure Phase Noise Determine Type of RF Phase and Amplitude Measurement System