NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max, Sean Adkins for NGAO Team SSC Meeting February 20, 2008.

Slides:



Advertisements
Similar presentations
Page 1 Lecture 12 Part 1: Laser Guide Stars, continued Part 2: Control Systems Intro Claire Max Astro 289, UC Santa Cruz February 14, 2013.
Advertisements

NGAO Construction Project Cost Estimation: Initial Thoughts Richard Dekany NGAO Team Meeting #12 December 13, 2007.
Science Group: Status, Plans, and Issues Claire Max Liz McGrath August 19, 2008.
W. M. Keck Observatory Keck Next Generation AO Next Generation Adaptive Optics Irvine Meeting September 14, 2006 P. Wizinowich for NGAO Executive Committee.
W. M. Keck Observatory’s Next Generation Adaptive Optics Preliminary Design & Path Forward Peter Wizinowich, Sean Adkins, Rich Dekany, Don Gavel, Claire.
NGAO System Design Review Response Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team SSC Meeting June 18, 2008.
PALM-3000 Management Update A. Bouchez, J. Roberts Team Meeting #15 10/29/09.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
Science Team Management Claire Max Sept 14, 2006 NGAO Team Meeting.
Build to Cost Meeting: Goals, Agenda & New Directions Peter Wizinowich NGAO Team Meeting September 11-12, 2008.
1 NGAO Instrumentation Studies Overview By Sean Adkins November 14, 2006.
WMKO Next Generation Adaptive Optics: Build to Cost Concept Review Peter Wizinowich et al. ~ March 20, 2009 February 5, 2009 DRAFT.
Observing Operations Concept Document Elizabeth McGrath NGAO PD Team Meeting #6 March 19, 2009.
1 Laser Guide Star Wavefront Sensor Mini-Review 6/15/2015Richard Dekany 12/07/2009.
NGAO Science Instrument Reuse Part 2: Update and required feedback NGAO IWG Anna Moore, Sean Adkins NGAO Team Meeting January 22, 2007.
Keck NGAO Science Case Requirements Claire Max and Liz McGrath NGAO Team Meeting 13 January 25, 2008.
NGAO Report February 18, 2009 Waimea NGAO Report February 18, 2009 Waimea P. Wizinowich for the NGAO Team.
1 Keck NGAO Proposal: Management Overview Presenter: P. Wizinowich SSC Meeting June 21, 2006.
NGAO System Design: AO System (WBS 3.2) & Laser Facility (WBS 3.3) Design Inputs & Outputs Peter Wizinowich NGAO Team Meeting #9 August 24, 2007.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team SSC Meeting April 3, 2007.
Science Operations Update NGAO - Meeting 11 D. Le Mignant, E. McGrath & C. Max W. M. Keck Observatory 11/05/2007.
California Association for Research in Astronomy W. M. Keck Observatory KPAO Keck Precision Adaptive Optics Keck Precision AO (KPAO) SSC Presentation January.
Build to Cost Directions & Guidelines Peter Wizinowich SSC Meeting November 3, 2008.
The Path to NGAO Core Science Requirements Claire Max and Liz McGrath NGAO Team Meeting September 11-12, 2008.
NGAO Meeting #3 Introduction NGAO Meeting #3 Peter Wizinowich December 13, 2006.
WFS Preliminary design phase report I V. Velur, J. Bell, A. Moore, C. Neyman Design Meeting (Team meeting #10) Sept 17 th, 2007.
Planning “Science Operations” tasks for the PD phase NGAO PD Phase D. Le Mignant W. M. Keck Observatory 08/19/2008.
NGAO Science Instruments Build to Cost Status February 5, 2009 Sean Adkins.
Demonstration of Science Observing Modes AOWG meeting Dec. 5, 2003 D. Le Mignant, A. Bouchez for the Keck AO team.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
NGAO Management Update Peter Wizinowich NGAO Meeting #11 November 5, 2007.
LGS-AO Performance Characterization Plan AOWG meeting Dec. 5, 2003 A. Bouchez, D. Le Mignant, M. van Dam for the Keck AO team.
NGAO System Design Phase Management Report - Replan NGAO Meeting #6 Peter Wizinowich April 25, 2007.
NGAO Status R. Dekany January 31, Next Generation AO at Keck Nearing completion of 18 months System Design phase –Science requirements and initial.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team (with input from Sean Adkins, Matthew Britton, Ralf.
Don Gavel: Keck NGAO meeting April 25, Keck NGAO Project Replan: AO and Laser Systems Donald Gavel NGAO Team Meeting 6 April 25, 2007.
Next Generation Adaptive Optics (NGAO) System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max Science Case Presenters: Brian Cameron,
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
The Future of AO at Keck Sept 2004 Mike Brown, for the AOWG and Keck AO team.
1 Keck NGAO Project Replan: Science Cases and Requirements Claire Max NGAO Team Meeting 6 April 25, 2007.
NGAO System Design Phase System & Functional Requirements Documents NGAO Meeting #6 Peter Wizinowich April 25, 2007.
NGAO: Cost Comparison with First Light TMT AO Peter Wizinowich, Richard Dekany, Don Gavel with input & review by Brent Ellerbroek SSC Meeting November.
NGAO Team Meeting Management Peter Wizinowich March 19, 2009.
System Architecture WBS 3.1 Mid-Year Replan Richard Dekany NGAO Team Meeting #6 April 25-26, 2007 UCSC.
NGAO Build to Cost Summary Peter Wizinowich, Sean Adkins, Rich Dekany, Don Gavel, Claire Max & the NGAO Team SSC Meeting April 14, 2009.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team SSC Meeting January 24, 2007.
NGAO Instrumentation WBS Replan By Sean Adkins April 25, 2007.
Major Management & Systems Engineering Ideas for Reducing Costs Peter Wizinowich NGAO Team Meeting September 11-12, 2008.
Science Requirements Impacting AO Architecture Claire Max Architecture Meeting July
High Redshift Galaxies: Encircled energy performance budget and IFU spectroscopy Claire Max Sept 14, 2006 NGAO Team Meeting.
NGAO Meeting #5 Introduction NGAO Meeting #5 Peter Wizinowich March 7, 2007.
WMKO Next Generation Adaptive Optics: Build to Cost Concept Review Peter Wizinowich et al. December 2, 2008 DRAFT.
W. M. Keck Observatory’s Next Generation Adaptive Optics (NGAO) Facility Peter Wizinowich, Sean Adkins, Rich Dekany, Don Gavel, Claire Max for NGAO Team:
PALM-3000 Budget and Schedule Update A. Bouchez, J. Roberts Team Meeting #10 1/8/2009.
NGAO Instrumentation Preliminary Design Phase Planning September 2008 Sean Adkins.
Functional Requirements for NGAO Christopher Neyman W. M. Keck Observatory NGAO Team Meeting #9 August 24, 2007.
WMKO Next Generation Adaptive Optics: AO System Design Impact of Cost Savings Ideas Don Gavel December 19, 2008.
Trade Study Report: NGAO versus Keck AO Upgrade NGAO Meeting #5 Peter Wizinowich March 7, 2007.
AO Opto-mechanical System Design Status, Issues, and Plans Don Gavel UCO/Lick Observatory (for the opto-mechanical design team) Keck NGAO Team Meeting.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max, Sean Adkins for NGAO Team SSC Meeting November 6, 2007.
NGAO Wavefront Error Performance Budgets R. Dekany 13 May 2010.
NGAO Controls Team Kickoff Meeting August 5, 2008 Erik Johansson.
1 The Thirty-Meter Telescope (TMT) Richard Ellis, Steele Professor and California Institute of Technology TMT Board member Michael Bolte, Director, University.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
W. M. Keck Observatory Subaru Users’ Meeting
Keck Next Generation AO Next Generation Adaptive Optics Meeting #2 Caltech November 14, 2006 P. Wizinowich for NGAO Executive Committee.
Keck Precision Adaptive Optics Authors: Christopher Neyman 1, Richard Dekany 2, Mitchell Troy 3 and Peter Wizinowich 1. 1 W.M. Keck Observatory, 2 California.
Science Priorities and Implications of Potential Cost Savings Ideas
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
NGAO System Design Project Plans and Schedule
Presentation transcript:

NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max, Sean Adkins for NGAO Team SSC Meeting February 20, 2008

2 Presentation Sequence Management Science Case Requirements System Design Summary

Management System Design Started 10/1/06 System Design Review 4/21/08 now PDR

4 Project Update Report 6 submitted to Directors on 2/4/08. Emphasis during this report period has been on: –Subsystem design (Sept. – Feb.) Including updates to the functional requirements –Systems Engineering Management Plan (Jan. – Mar.) Other major completed activities: –Project replan & science case requirements NSF TSIP funding awarded for preliminary design phase –$2M of $2.7M preliminary design budget –MOU for telescope time complete. Contract being drafted. No news yet on ATI proposal

5 System Design Milestones #MILESTONEDATESTATUS 1SD SEMP Approved10/9/06Complete 2SD phase contracts in place10/27/06Complete 3Science Requirements Summary v1.0 Release 10/27/06Complete 4System Requirements Document (SRD) v1.0 Release 12/8/06Complete 5Performance Budgets Summary v1.0 Release 6/15/07Complete 6SRD v2.0 Release5/22/07Nearly complete 7Trade Studies Complete6/22/07Complete 8SRD v3.0 Release 9/7/07Not started 9System Design Manual (SDM) v1.0 Release 9/21/07Complete 10Technical Risk Analysis V1.0 Release 9/21/07Complete 11Cost Review Complete12/7/07In process 12SDM v2.0 Release 2/12/08In process 13System Design Review Package Distributed 3/4/08 New date: 3/18/08 14 System Design Review3/31/08 New date: 4/21/08 15SDR Report & Project Planning Presentation at SSC meeting 4/14/08 New date 4/30/08 Requirements  Performance Budgets + Trade Studies  System Architecture + Functional Requirements  Subsystem Design + Functional Requirements  Management Plan (post-SDR)

6 Schedule & Budget Schedule: 73 % of System Design Phase work complete through Jan. –48% of remaining work is system design. Wrapping up at conceptual level. Budget: 89% of SD Phase budget ($1170k) spent through Jan.

7 System Design Review Date: April 21, Reviewers: –Brent Ellerbroek (TMT) –Bob Fugate (formerly of SOR) –Andrea Ghez (UCLA) –Norbert Hubin (ESO, Chair) –Nick Scoville (Caltech) –Gary Sanders (TMT) Review will follow WMKO guidelines: –SDR package distributed with 2 weeks for reviewer comments –Reviewer response distributed prior to review & final agenda set –SDR will focus on issues identified by reviewers Charter & draft materials can be found at

Science Case Requirements

9 Progress on Defining Science Requirements Release 2 of the Science Case Requirements Document is complete Release 2 of System Requirements Document is almost complete –Observatory requirements further developed –Remaining tasks identified and assigned –David Le Mignant & Liz McGrath supporting this effort

10 Updated Science Requirements Summary

11 Each Science Driver has a “Requirements Table” Summarizes requirements discussed in text and figures Formatted for input into System Requirements Document and into the Contour Database of Functional Requirements Example: part of the Requirements Table for High- Redshift Galaxies

12 Progress on Science Cases Key Science Drivers: new analysis and content –Galaxy Assembly and Star Formation History: analysis of cooling requirements to decrease background –Nearby Active Galactic Nuclei: discussion of required spatial resolution –General Relativity Effects at the Galactic Center –Extrasolar Planets around Low-Mass Stars: definition of 3 target sets with distinct requirements –Multiplicity of Minor Planets: optimum wavelengths and sampling Science Drivers: new analysis and content –QSO Host Galaxies –Gravitational Lensing (by galaxies and clusters) –Characterization of Gas Giant and Ice Giant Planets & their Moons –Backup Science (be sure we can do good NGS science when laser can’t be used)

NGAO System Design

14 AO Opto-Mechanical Design Visible Imager NGS WFS Rotator NIR Imager to OSIRIS LGS WFS Deployable IFS DM1 DM2

15 AO Wavefront Sensor Design LGS pickoff & WFS Tip-Tilt Sensor

16 System Configurations Science Cases drive the AO system configurations (i.e., required hardware & control)

17 System Configurations

18 Summary Management –Replan for remainder of system design phase completed –Good progress on Systems Engineering Management Plan –On track for System Design Review –NSF TSIP funding for preliminary design! Technical: –Subsystem design phase completed –Functional requirements completed Team remains committed & excited about NGAO!