Downstream PID Review Alan Bross MICE CM 16 October 8, 2006.

Slides:



Advertisements
Similar presentations
G2p Hall Infrastructure Alan Gavalya May Overall g2p Target on Pivot in Hall A.
Advertisements

Preparing for the CD-2 Review Elton Smith Hall D Collaboration Meeting October 12-14, 2006.
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
Software Summary Database Data Flow G4MICE Status & Plans Detector Reconstruction 1M.Ellis - CM24 - 3rd June 2009.
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
Technical Coordinator’s Report (KL for PD) Solenoid problems & Schedule Actions on –KL/CN: plan for work to December shutdown –KL/CN: plan for work in.
MICE VC 15/3/07Chris Nelson MICE Hall. Issues Realistically, I would expect D2 drawings to go for tender by end next week 23/3 but I hope we can use same.
Workshop Goals MICE Controls and Monitoring Workshop September 25, 2006 A. Bross.
MICE CM16, RAL, 11 Oct 2006V. Palladino Plans for MICE PI detectors & Shielding MICE CM16, RAL Oct 11, 2006 V. Palladino, Univ & INFN Napoli for the small.
MICE Beam Monitors - STATUS MICO Meeting January 9, 2008 Alan Bross.
Upstream PID Review Alan Bross MICE CM 16 October 12, 2006.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
paul drumm; 3rd December 2004; AFC MM 1 Cost & Schedule Review I Terms of reference: –To review the Cost and schedule of the MICE Muon beam –To review.
MICE Project Report Paul Drumm ~ Sunday August 1 st 2004.
March 31, Status of the TOF, Ckov and Virtual Detector Packages in G4Mice Steve Kahn Brookhaven National Laboratory Mice Collaboration Meeting March.
Detector Systems Update MICO April 14, MICE Detector Systems  CKOV u Nothing new  TOF0/1 u H6533MOD PMT assembly reliability is the main concern.
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
Upstream PID Review at CM16 A.Bross VC September 13, 2006.
6 th April 2005 Malcolm Ellis, Imperial College London 1 Sci Fi Status & KEK Test.
MICE PID, 6 Dec 2007 V. Palladino Introduction to the meeting Introduction to the meeting 1 ) TOF I shielding (Vittorio introduces discussion) 2) Discussion.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
PHENIX Run-14 Status January 28, 2014 Klaus Dehmelt 1Klaus Dehmelt - Jan 28, 2014 RHIC Time meeting.
MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields MICE PID detectors & Shielding MICE CM17, CERN Feb 25, 2007 V. Palladino, Univ & INFN.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
Cryo Update and Power Distribution Alan Bross Tracker Parallel – MICE CM October 7, 2007.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Research & Technology Implementation TxDOT RTI OFFICE.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
AGS RSVP Weekly Meeting P. Pile 16 September 2004 AGS RSVP Weekly Meeting, 16 Sep 2004 AGS Project Office - status of funding, comments on RSVP
HFT face-2-face F.Videbaek Brookhaven National Lab.
Technical Board and Safety Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.
1 Collaboration Meeting JLAB January 2008 Project Status Update E.C. Aschenauer.
Paul drumm, mutac jan Precursor: - Resources since cm16. Beamline Review Response. Optics related work: the major threads: -Current (ε,p) status.
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
11 Nov 2008PC Analysis PC Schedule 2008 Tuesdays fortnightly 9 September  23 September  2 October  CM22  11 November  25 November 9 December.
M. Bonesini - MICE Inst Meeting M. Bonesini INFN Milano TOF installation plans.
Online Reconstruction 1M.Ellis - CM th October 2008.
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
1 MICE PID Group Meeting 11 May 2005 Update on Design & Safety Review Presented by Wing Lau.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
SPOKESMAN’S UPDATE K. Long Imperial College London/STFC.
PId (ToF, CKoVI, EMCAL) V. Palladino et al MICEVC Frascati & Fermilab test beams in July Analysis in progress: MICE PID PhConf 4, 31 Aug aiming.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
TPC Large Prototype panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Status of the Micromegas Large Prototype.
WBS ? Proposed by IPRP … –Preparation for a review –MICE Costs & Time Scales need to be more accurate & Justified –Technical Leaders arranged by technology.
MUON Project Overview Action Items from September meeting New Action Items Update to the List of Worries Update of plans for the next 6 months.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
1 AFE IIt/VLSB Update Terry Hart, MICE Tracker Phone Conference, August 20, 2007.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
UK Project Plan Roy Preece STFC RAL RLSR 26 th October 2015.
Consulting on future benefits for the northern bank pension scheme Why is the Bank making these proposals? What happens next?   WALKERS SOLICITORS W.
MICE CM31 Schedule summary
The SABRE Crystals Frank Calaprice.
MICE PM Report Progress with the Infrastructure A few problems
European Detector R&D: AIDA
Summary of MuCool/MTA RF workshop
S. Stepanyan (JLAB) HPS collaboration meeting May 3 – 5, 2017 JLAB
Presentation transcript:

Downstream PID Review Alan Bross MICE CM 16 October 8, 2006

Review Process  The review process for the downstream PID detectors will be the same as we are doing for the upstream at this meeting  Charge: u Have the simulation studies/analyses accurately and reliable defined the detector needs for the experiment? u Is the design specification sufficient to meet the needs of the experiment? u Is it likely that the proposed system(s) (detector, electronics, DAQ) can achieve this specification? u Are the risks fully understood and being appropriately managed? u Is the proposed schedule realistic in terms of the available resources: funding and people? u Is the schedule likely to lead to a timely installation in the MICE hall? u Are the infrastructure needs clearly defined and being addressed? u The review is also free to pick up on issues which may arise during the review and are not covered by the above.  The format will also be the same  We plan to hold the review at Frascati or possibly in conjunction with a future MICE CM

Downstream PID Review Status  Since there are still open questions regarding the design of the DS-PID: Magnetic shielding, detector size, calorimeter basic design, it is premature to schedule the DS-PID review at this time  We propose that we have a 1-2 day workshop in Frascati to help advance (finalize?) the design of the DS-PID systems in early December  We will try to pin down a date in the next 2 weeks.  Afterwards we should be in a better position to determine when to schedule the actual review