From The Mainframe To The Sun To The World! Carmen Williams Rose Keeley Carol Drechsel University of North Dakota Presented at Midwest SAS Users Group.

Slides:



Advertisements
Similar presentations
ISeries Skip Upgrade External Sales Presentation September,2005.
Advertisements

Pamela Norris Project Manager Kraft Kennedy & Lesser, Inc.
Professional Services Developer Program Services
Enhanced XA Security CISTECH Security Solutions Belinda Daub, Senior Consultant Technical Services
OVERVIEW TEAM5 SOFTWARE The TEAM5 software manages personnel and test data for personal ESD grounding devices. Test and personnel data may be viewed/reported.
Crew Management, Operations Control & Commercial Planning System
Team 7 / May 24, 2006 Web Based Automation & Security Client Capstone Design Advisor Prof. David Bourner Team Members Lloyd Emokpae (team Lead) Vikash.
0-1 Team # Status Report (1 of 4) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team #: Team Name.
0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description.
Fundamentals of Information Systems, Second Edition
ImageNow User’s Group October 22, User’s Group Goals  Communicate & Share Ideas with Others Discuss What Works / Best Practices Discuss Common.
Semester 2, 2003 Week 7 CSE9020 / 1 Software Testing and Quality Assurance With thanks to Shonali Krishnaswamy and Sylvia Tucker.
So You Want to Switch Course Management Systems? We Have! Come Find Out What We’ve Learned. Copyright University of Okahoma This work is the intellectual.
Tripwire Enterprise Server – Getting Started Doreen Meyer and Vincent Fox UC Davis, Information and Education Technology June 6, 2006.
IIS vs. Apache. Five advantages of IIS 1. It is has a GUI interface, which makes the installation a bit easier. 2. It "plays" well with other Microsoft.
National Finance Center’s 2008 Customer Forum EmpowHR 9.0 Billy Dantagnan Teracore.
Request For Proposal Barbara Antuna Ronald Healy Chad Hodge Andrew James Mel Ocampo.
Release & Deployment ITIL Version 3
User Services. Services Desktop Support Technical Support Help Desk User Services Customer Relationship Management.
IBIS System: Requirements and Components Lois M. Haggard Office of Public Health Assessment.
VAP What is a Virtual Application ? A virtual application is an application that has been optimized to run on virtual infrastructure. The application software.
SmartLog X 3 TEAM Basic SmartLog X 3 TEAM Basic DescoEMIT.com USER STATUS USER EDIT TEST LOG ADMIN TEST MACHINE SCHEDULE INSTALL System Requirements:
Welcome to the Learning Community 2015 Roll out webinar Hosted by the Family Institute for Education, Practice & Research The webinar will begin shortly.
University of North Dakota Office of Institutional Research November 8, 2013 Drivers get ready - new dashboards are coming your way! Presented at the.
1 Building and Maintaining Information Systems. 2 Opening Case: Yahoo! Store Allows small businesses to create their own online store – No programming.
This presentation is the property of Paradigm Information Systems It is confidential to the intended recipient for the purpose of evaluating FMS Any other.
Cap 333 Network Administration. Solution Rules  Your solution must be typed by computer. Otherwise, it will not be accepted.  If the question is a project.
Pass SOX security audits and Improve XA security CISTECH Security Solutions Belinda Daub, Senior Consultant Technical Services
1 © Quality House QUALITY HOUSE The best testing partner in Bulgaria.
Lucity GIS and IT Services. Lucity IT Services.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Choosing Delivery Software for a Digital Library Jody DeRidder Digital Library Center University of Tennessee.
Data Company Customer Interview. 2. Purpose and Quick Check The purpose of this interview is to determine whether 8020 can provide a useful service.
Chapter 8: Operating Systems and Utility Programs Catherine Gifford Dan Falgares.
Plan Design Analyze Develop Test Implement Maintain Systems Development Life Cycle MAT Dirtbikes.
CakePHP is an open source web development framework. It follows Model-View- Controller and is developed using PHP. IT is the basic for user to create.
Submitting IT Purchasing Statements of Work to DIR SB 20 COMPLIANCE FOR TEXAS STATE AGENCIES TECHNOLOGY SOLUTIONS FOR GOVERNMENT AND EDUCATION.
Computer Emergency Notification System (CENS)
Copyright © 2006, SAS Institute Inc. All rights reserved. SAS Enterprise Guide Old Proc – New Tricks? Tim Trussell Academic Program, SAS Canada world diabetes.
Comprehensive e-Campuses: Academics and Commerce Trina Spaeth, e-Learning Specialist Nancy Lilleberg, Manager of Instructional Services.
Using Virtual Servers for the CERN Windows infrastructure Emmanuel Ormancey, Alberto Pace CERN, Information Technology Department.
Macintosh Print Controller Team SDMay03-08Advisor Dr. James Davis Abstract The Macintosh Print Controller project attempts to solve a process productivity.
Implementing a Content Management System A Practical Guide.
Imaging Project Digital Imaging Team Process, Recommendations and Status.
Digital Imaging Project Digital Imaging Team Process, Recommendations & Status Patrick Thomas, Director Of Administrative Technology John Duff, Director.
VENDORS, CONSULTANTS AND USERS. WHY CAN’T COMPANIES DEVELOP THEIR OWN ERP PACKAGES? To develop an ERP package is a complex & time consuming activity which.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
1 Microsoft Project Solution Offerings and the next chapter of EPM September 17th, 2003 Brendan Giles, PMP Systemgroup Management Services.
Company small business cloud solution Client UNIVERSITY OF BEDFORDSHIRE.
TiBS Fermilab – HEPiX-HEPNT Ray Pasetes October 22, 2003.
Innovation Software Corporation's Cultural Awareness Training Program Presentation by:
Chapter 8 Final Construction Final construction in the SDLC Construct and test programs Construct and test the database Obtain additional hardware Prepare.
G046 Lecture 04 Task C Briefing Notes Mr C Johnston ICT Teacher
1 Chapter 1: Getting Started 1.1 Introducing SAS Enterprise Guide 1.2 Course Scenarios.
The Digital Portfolio Add samples of student work directly from the Gradebook into the Digital Portfolio Keep track of several different formats: Written.
2.0 Final release: Coming soon! things on my list!
ECpE Student Database Team 21 Adviser: Tien Nguyen ECpE and Tony Moore.
6/14/20161 System Administration 1-Introduction to System Administration.
CyberPatriots 2016 Student Handbook.
The Marshall University Experience with Implementing Project Server 2003 August 9, 2005 Presented by: Chuck Elliott, M.S. Associate Director, Customer.
Annual Maintenance Contracts. Computers are very important to run work efficiently in software companies. To maintain computers well Annual Maintenance.
Website: Toll-Free: Website:
POS 355 Competitive Success/snaptutorial.com
Relate to Clients on a business level
Systems Analysis and Design
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Preparing for Campus Testing
Case Study 1 By : Shweta Agarwal Nikhil Walecha Amit Goyal
Joint Application Development (JAD)
Presentation transcript:

From The Mainframe To The Sun To The World! Carmen Williams Rose Keeley Carol Drechsel University of North Dakota Presented at Midwest SAS Users Group September 2003

The Goal Automate the way we generate and report our daily student registration activity to the web.

SAS/IntrNet Project SAS/IntrNet implemented through the Higher Education Computer Network Principle users located at the University of North Dakota (UND) and North Dakota State University (NDSU) Steps involved the coordination of mainframe programs to the Sun (server) to the web

Project Overview Developed out of the need to “automate” SAS output to the web Worked with our ITSS SAS user consultant along with another institution Once approved to “move forward” in the proposal, received a more specific list of product needs and costs from SAS (educational prices) Upon final approval, timelines (aggressive) were set up for implementation

Project Overview con’t Total Team Effort Install ourselves? Technology framework Training and learning the new system Life after the consultants leave

Implementation Timelines Installs to do prior to SAS consultants arriving Example programs sent to SAS Hardware needs assessed Software needs assessed – We were only at version 6.09 at this time End users needed to learn PC-SAS & version 8.2

Total Team Effort All assessments, installs, other preparation took a total team effort – Mainframe support teams, security, UNIX support teams, client support consultants, and the end users all had to commit their time and knowledge – Very intense (but for short time)

Installation We chose to have the SAS products installed (under the Risk Mitigation – Pilot Implementation solution offered by SAS -for government & academic customers) – One expert mainframe consultant – One expert UNIX consultant Daily schedule – Conference first thing in the morning Make sure everyone was on “same page” Went through examples to understand process and final product – Ended each day with a brief overview/demo of what was accomplished that day

Technology framework IBM Mainframe MP H50 with RAMAC 9393 Disk running OS390 V2.10 loaded with Base SAS, SAS/GRAPH, SAS/STAT, and the new module SAS/CONNECT Sun Enterprise Station - Model 220R, dual SPARC Ultra-60 processors 450 MHZ running Solaris 5.8 (64 bit) OS – This one machine (server) maintains the Web Server running Apache 1.3 and the Application Broker, as well as the SAS Server running SAS 8.02 and the Application Server. The SAS/IntrNet Application Dispatcher provides the Application Broker on the Web Server and the Application Server on the SAS Server

Training and learning the new system Following the installation, the products were working…. – Gave us a little time to re-group and take some of the new features in – We had some problems with earlier versions (formats, password protection) which needed extra time to fix Consultants came back after one month – Worked on the applications more – Provided some hands-on training Six days of public training was also purchased Practice, practice, practice

Demonstration

Report Selections

Drop Down Box Selections

Static Report #1

Static Report #2

MDDB Report Viewer Fictitious Data

Fictitious Data

Life after the consultants The three of us met regularly – Went through all of the jobs – Documented the steps Took advantage of the public (web) training Discussed at our regional meeting (Red River Valley SAS Users Group) (re)formed a UND SAS Users Group

SAS/IntrNet Project Wrap-up (con’t) Pros – Two very capable and qualified SAS consultants writing the SAS code – SAS consultants worked with the technical personnel to install necessary products – With the consultants on campus it required the attention of the “team” to act when called upon and drop everything and come to the table (note – pro & con!) – Now that we have “the code” and everything is working well, it will be much easier to write other programs – Have had excellent assistance from the SAS consultants for follow-up questions

SAS/IntrNet Project Wrap-up Cons – Everyone involved needed to be “on call” for the two weeks that the consultants were on- campus – We did receive a lot of documentation… but it’s never enough – The training was very intense.. not enough handouts, and at times difficult to follow and document

Thank you for attending!

University of North Dakota For questions, please contact: – Carmen Williams, Institutional Research – Rose Keeley, Info Tech Systems & Services – Carol Drechsel, Institutional Research