04/02/2004 az Outer Tracker Distribution Boxes 1 EFNI H K Outer Tracker Distribution Boxes Ad Berkien Tom Sluijk Albert Zwart.

Slides:



Advertisements
Similar presentations
Twisted Pair Cable Dense assembly (OD 5-7 mm) with –Twisted pairs : total 21; 44-pin mm dual row Omnetics connector differential signals single-ended.
Advertisements

Bagby L0 Workshop L0 Infrastructure  Mapping  Installations u Horseshoe Area s Adapter Card u Cathedral s Low Voltage Fuse Panel u Platform s.
TDC in ACTEL FPGA Tom Sluijk Wilco Vink Albert Zwart Fabian Jansen.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France 24 February 2003 News about SPECS system  SPECS system  SPECS-SLAVE chip  SPECS-SLAVE.
CMS/CERN. Nov, 2001HCAL TriDAS1 HCAL Fiber Link Issues Use of CMS Tracker Fiber Links Drew Baden University of Maryland John Elias Fermilab.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
Standard Rung 30mm 385mm 350mm 10mm 111mm 2mm47mm77mm107mm 147mm177mm207mm 236mm272mm302mm332mm355mm 378mm.
E. Hazen, Boston University BU Meeting, Apr. 6, 2001 Front-end Readout of the CMS Hadronic Forward Calorimeter (HF) Conceptual Design (Summary) by Eric.
Chamber PCB s, FEB s, Cooling, HV/LV Distribution 1)PCB designs-track widths, track to track distances … 2) Double sided and Multi layer, modular approach.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
Readout of DC coupled double sided sensors with CBMXYTER: Some first thoughts Peter Fischer, Heidelberg University.
PPIB and ODMB Status Report Rice University April 19, 2013.
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
Calorimeter upgrade meeting - Wednesday, 11 December 2013 LHCb Calorimeter Upgrade : CROC board architecture overview ECAL-HCAL font-end crate  Short.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
Design & test of SciFi FEB
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
1 Outer Tracker Front-End Layout Distribution of Signals and Bias NIKHEF/HeidelbergOctober 2002.
Detector Cabling and Patching Rainer Schwemmer
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
Saverio MINUTOLITOTEM Trigger Meeting 12 January ~6k wires VFAT2 CSC T1 ARM 1 8 x ~6k wires VFAT2 CSC T1 ARM 1 8 x2 1 x2x15 30 T1 TRG_TOTFED.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
Oct 29, 2001 Ron Sidwell 1 Purple Card. Oct 29, 2001 Ron Sidwell 2 Purple Card Spec Two channels per printed circuit board Size ~20 sq. in. or best effort,
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
T1 hardware Detector Control System, OK several automates have been added, LV and HV sequences. FSM manages transition between Busy, ON and OFF states.
Service box / Patch panel Cabling detector counting room Power supplies LV and HV LHCb Outer Tracker Services and Infrastructure.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
L0 Workshop 17/10/2007 Wilco Vink / Martin van Beuzekom Leo Wiggers / Sander Mos 1 Commissioning/Status Pile-Up System.
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
1 VELO integration INTEGRATION, december 05 OUTLOOK : - PARTS - 3D MODEL - LV & HV CABINETS INTEGRATION - LV CABLING - RPT CABLING.
CMX Collection file for current diagrams 30-Apr-2014.
Rev Server blade enclosure overview Power backplane Signal backplane Management module Reset Bottom.
NA62 straw tracker DCS Straw tracker overview Bulk power supply Power supply distribution and monitoring LV + monitoring HV Temperature monitoring Gas.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
12/10/01 - Cecilia Gerber UIC Slide 1 Testing Card specifications l Will be used in the Run2b SASEQ-based test stands  needed. Build 75, two.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
Distributed Low Voltage Power Supply System for Front End Electronics of the TRT Detector in ATLAS Experiment E.Banaś a, P.Farthouat b, Z.Hajduk a, B.Kisielewski.
CERN – 7 Oct 04 1 LHCb Muon Grounding Anatoli Katchouk CERN Alessandro Balla, Paolo Ciambrone, Maurizio Carletti, Giovanni Corradi, Giulietto Felici, Rosario.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
CLAS12 Central Detector Meeting, Saclay, 3 Dec MVT Read-Out Architecture & MVT / SVT Integration Issues Irakli MANDJAVIDZE.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
1 DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Preliminary DCS technical specifications (v1.0) for the Gigatracker.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
1 Roger Rusack The University of Minnesota. Projects  Past Projects  11,000 channels of 0.8 Gbs for the CMS crystal calorimeter readout.  1,500 channels.
The Data Handling Hybrid Igor Konorov TUM Physics Department E18.
2 March 2012Mauro Citterio - SVT Phone meeting1 Peripheral Electronics Some updates Mauro Citterio INFN Milano.
High Voltage Power Supply for RPC Suvendu Nath Bose, Satyajit Saha, Sudeb Bhattacharya, Saha Institute of Nuclear Physics, Kolkata,, Description Presently.
Martin van Beuzekom, Jan Buytaert, Lars Eklund Opto & Power Board (OPB) Summary of the functionality of the opto & power board.
LHCb Outer Tracker Upgrade Actel FPGA based Architecture 117 januari 2013 Outline ◦ Front end box Architecture ◦ Actel TDC ◦ Data GBT interface ◦ Data.
27/01/2004 az Proto Outer Tracker Front-End Tests 1 EFNI H K Test results of the Prototype Outer Tracker Front-End Box Ad Berkien Tom Sluijk Albert Zwart.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
LHCb Outer Tracker Electronics 40MHz Upgrade
Calorimeter Mu2e Development electronics Front-end Review
Readout System of the CMS Pixel Detector
UT Optical Connections
Integration – preliminary ideas on routing and tests
Electronics for RPC Upscope
LHCb Outer Tracker Upgrade Developments
VeLo Analog Line Status
Pierluigi Paolucci - I.N.F.N. Naples
Overview of T1 detector T1 is composed by 2 arms
HCAL HV splice box.
EVLA MONITOR & CONTROL CDR
Presentation transcript:

04/02/2004 az Outer Tracker Distribution Boxes 1 EFNI H K Outer Tracker Distribution Boxes Ad Berkien Tom Sluijk Albert Zwart

04/02/2004 az Outer Tracker Distribution Boxes 2 EFNI H K High Voltage High voltage Power Supplies and HV patch panel in the Counting Room. Cables with 48 HV channels and interlock signals to the on-detector HV Distribution Boxes. Front End Modules are subdivided in 4 parts of 32 straws with separate connections to the HV Distribution Boxes. HV Distribution Box branches off three 48 channel cables into 144 SHV connectors.

04/02/2004 az Outer Tracker Distribution Boxes 3 EFNI H K High Voltage System

04/02/2004 az Outer Tracker Distribution Boxes 4 EFNI H K Low Voltage One complete Front End Box draws 2.6 A from the positive (+5,3V) supply and 0.9 A from the negative (-5,3V) supply (typical). LV Distribution Box has 40 fused taps to to accommodate 36 Front End Boxes and 3 service boxes (1 spare). The number of incoming cables are dependant on the selected power supplies, no power supplies in parallel. Total power for one LV Distribution Box: – +5,3V – -5,3V

04/02/2004 az Outer Tracker Distribution Boxes 5 EFNI H K Optical Fiber Connections The Optical Receiver Card of the L1 Board accepts 12-fiber ribbon cables and connectors. A patch panel in the Counting Room and an off-detector patch panel in the cavern, in between the patch panels a bulk fiber cable with 54 ribbon cables; 39 used and 15 spares. The TTC and SPECS signals also use this fiber cable. The on-detector Fiber Distribution Box combines 12 ST connectors into three 12-fiber ribbon connectors Four ribbon cables between the on-detector Fiber Distribution Box and the off detector Fiber Patch Panel; 3 used and 1 spare. The off detector Fiber Patch Panel branches off 12 TTC ST type connectors and 12 SPECS LC type connectors.

04/02/2004 az Outer Tracker Distribution Boxes 6 EFNI H K Optical Fiber Connections

04/02/2004 az Outer Tracker Distribution Boxes 7 EFNI H K Service Boxes The Service Box function is subdivided into one Master Service Box at the middle of the detector curtain and two Slave Service Boxes at the top and bottom of the detector curtain. The Master Service Box contains the TTCrx and the SPECS Slave, it supplies; –The TFC signals and JTAG ports for the Slave Service Boxes. –The I2C ports, directly connected to the Front end Boxes. The Slave Service Box contains; –LVDS drivers for the TFC signals. –ADC’s for the monitor signals. The TFC/monitor connections from Master to Slave Service box is done by 3 CAT5 cables The TFC/monitor connections from Slave Service Box to the Front End Boxes is proposed to be made with 30 pin Metral connectors and 14 twisted pair shielded cable.

04/02/2004 az Outer Tracker Distribution Boxes 8 EFNI H K TFC and Monitor signals The TFC signals; –Bx Clock –L0 –L0 reset –BID reset –EID reset –PU reset –Testpulse odd –Testpulse even The Monitor signals; –+3V –-3V –+2,5V –Temperature More signals needed ???

04/02/2004 az Outer Tracker Distribution Boxes 9 EFNI H K Master Service Box

04/02/2004 az Outer Tracker Distribution Boxes 10 EFNI H K Slave Service Box

04/02/2004 az Outer Tracker Distribution Boxes 11 EFNI H K Overview