GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 71 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Instrument Science.

Slides:



Advertisements
Similar presentations
Software Quality Assurance Plan
Advertisements

Roadmap for Sourcing Decision Review Board (DRB)
GLAST LAT Project ISOC 5/17/2004 – Seth Digel1 ISOC Lessons Learned RFA09 Issue –No writeup on lessons learned from visits to other instrument/mission.
GLAST LAT ProjectManager’s Face to Face - ISOC, 17 March GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Manager’s Face.
GLAST LAT ProjectISOC Peer Review March 2, 2004 Document: LAT-PR Section 5 LAT Operations Facility 1 GLAST Large Area Telescope: Section 5: LAT.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 6.1 Ground Operations Software 1 Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.1 Requirements 1 Gamma-ray Large Area Space Telescope GLAST Large.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
GLAST LAT Project Engineering Meeting – ISOC Peer Review 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review ISOC Detail.
RFA 18 – Automation of Operations Software Specific Request –Specify plans and requirements for automation of operations software, and describe the software.
Fundamentals of Information Systems, Second Edition
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
SE 555 Software Requirements & Specification Requirements Validation.
System-of-Systems Cost Modeling: COSOSIMO July 2005 Workshop Results Jo Ann Lane University of Southern California Center for Software Engineering.
Section 15-1GLAST Ground System Design Review August 18&19, 2004 ISOC Organization ISOC Manager R Cameron Commanding, H&S Timeline Planning Command Generation.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 3 LOF Operations Concept 1 Gamma-ray Large Area Space Telescope GLAST.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Section Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review 7.2.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
Secure System Administration & Certification DITSCAP Manual (Chapter 6) Phase 4 Post Accreditation Stephen I. Khan Ted Chapman University of Tulsa Department.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 21 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
GLAST LAT Project ISOC Subsystem1 Response to Peer Review RFA 6  Request: –Need to provide more information on the planned and actual staffing profiles.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Release & Deployment ITIL Version 3
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Project Management Process Overview
S/W Project Management
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Introduction to ISO New and modified requirements.
Chapter 2 The process Process, Methods, and Tools
PROJECT RISK MANAGEMENT Presentation by: Jennifer Freeman & Carlee Rosenblatt
GLAST LAT ProjectMonthly Status Review - ISOC, 1 September GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status.
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
BSBPMG505A Manage Project Quality Manage Project Quality Project Quality Processes Diploma of Project Management Qualification Code BSB51507 Unit.
Fundamentals of Information Systems, Second Edition 1 Systems Development.
GLAST Science Support CenterAugust 9, 2004 Users’ Committee Meeting GSSC USER SUPPORT David Band – GSSC.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
GLAST LAT ProjectMonthly Status Review - ISOC, 3 Nov GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status Review.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
GLAST Mission - LAT ProjectDOE/NASA Review March 31, 2004 Section ISOC 1 GLAST Large Area Telescope: ISOC Subsystems WBS: 4.1.B David Lung Stanford Linear.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Systems Engineering Mike DeKlotz GSFC Stanford Linear Accelerator Center Gamma-ray Large.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
LAT ISOCISOC Review, 15 February GLAST Large Area Telescope Instrument Science Operations Center Commanding, Health and Safety Rob Cameron Stanford.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.21 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST Science Support Center GLAT Users’ Committee Meeting Scheduling GLAST Observations Robin Corbet
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
GLAST Large Area Telescope – ISOC Overview and StatusDOE Annual Review, 13 June GLAST Large Area Telescope Instrument Science Operations Center.
GLAST LAT Project ISOC 1 ISOC Status Review June 3, 2004.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
1 DEPLOYMENT AND OPERATIONS MODULE 23 ECM SPECIALIST COURSE 1 Copyright AIIM.
Software Project Configuration Management
Systems Analysis and Design in a Changing World, 4th Edition
I&T&C Organization Chart
Fundamentals of Information Systems, Sixth Edition
CINEMA System Engineering
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope
GLAST Large Area Telescope
LAT Operations Scenario Subsystem Meetings
Introduction and Overview
PSS verification and validation
Integration & Test Instrument Operations Coordination
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 71 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Instrument Science Operations Center CDR Section 7 RFA Status Lori Bator ONE-SLAC

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 72 RFA 1 – Management Plan, Documentation, Schedule  Specific Request – Part 1 –Need to provide more information on the overall ISOC Management Plan and Approach  Response – Part 1 –Completed ISOC Management and Development Plan  Specific Request – Part 2 –What is the complete ISOC Documentation Set and associate schedules  Response – Part 2 –List of all ISOC documentation is on ISOC website as well as included in section 8 –Schedule is provided in section 8  Status –Closed

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 73 RFA 2 – Functional Block Diagram (1/6)  Specific Request: –Need an overall functional block diagram illustrating the functional capabilities and a data flow diagram showing the various data flows, with the differences among the I&T (pre- launch w/GSE) phase, L&EO phase, and nominal on-orbit phase configurations specified –Diagrams for each phase might be needed  Response –See the following slides  Status –Closed

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 74 RFA 2 –Functional Block Diagram (2/6)  Obtain data during I&T EM2 testing  Goal is to read housekeeping data off flat file produced by Online  Database development and maintenance is shared between I&T and ISOC ISOC Dataflow During I&T Single Tower Testing

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 75 RFA 2 – Functional Block Diagram (3/6)  Obtain data during I&T testing  Increase ISOC functionality ISOC Dataflow During I&T Multi-Tower Testing

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 76 RFA 2 – Functional Block Diagram (4/6)  Direct interface with SIU for CCSDS command and telemetry packets  Obtain testbed simulated data via SIU  Demonstration of ISOC capability increases as functionality is developed ISOC Dataflow with TestBed - Direct to SIU

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 77 RFA 2 – Functional Block Diagram (5/6)  Interface with SIIS for telemetry packets and commanding  Obtain testbed simulated data via SIU and SIIS  Demonstration of ISOC capability increases as functionality is developed ISOC Dataflow with TestBed - With SIIS

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 78 RFA 2 – Functional Block Diagram (6/6)  Shows full ISOC capability for L&EO and On-orbit  GRTs will test capabilities as they are available ISOC Dataflow During GRTs, L&EO and On-orbit

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 79 RFA 3 – Risk Analysis  Specific Request –Recommend a Risk Analysis be performed for the ISOC (development/test oriented). –A Risk Analysis exercise would greatly assist all elements in understanding major issues, concerns, and problems  Response –Process Discussion with I&T personnel on risks Internal discussion performed in concert with RFA’s from peer review Review and approval by ISOC stakeholders –Follow up Entry into LAT risk management database by 06/01/04 Weekly tracking, updating by ISOC management  Status –Closed

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 710 RFA 4 – Date of ISOC CDR  Specific Request –The current CDR date of May 2004 is not realistic, particularly given the shortage of key personnel on the ISOC development/design team and the lack of a defined telemetry and command system. –Be sure to coordinate with the rest of the ground system team to work around other element design reviews that will be occurring prior to the GSDR.  Response –ISOC CDR scheduled for August 4, 2004, which is after the MOC and GSSC detailed design reviews and before the GSDR.  Status –Closed

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 711 RFA 5 – Level III Requirements  Specific Request –The detailed (Level III) requirements for the LOF and SOG are not yet completed. These are critical to getting the ISOC detailed design done. And it will not be possible to properly evaluate the design without these being mature. Need to get these done ASAP.  Response –ISOC Subsystem Specification (LAT-SS-00021) updated and reviewed by GSFC  Status –Closed

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 712 RFA 6 – Staffing Plan and Profile (1/3)  Specific Request –Need to provide more information on the planned and actual staffing profiles –Identify which areas that are needed now are not filled, what is being done to fill them, and their role in being able to prepare for the ISOC CDR The ground software engineer for example would seem to be a prerequisite for preparing for the CDR, let alone actually conducting it Would also seem to need a test engineer  Response –Staffing plan as shown in section 8  Status –Closed

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 713 RFA 7 – Report Generation and Usage (1/2)  Specific Request –Better define and document the types of reports that will be generated by the ISOC for both internal use and for use by external systems (like the MOC and GSSC) Include those needed to document instrument performance, status, & analysis (probably covered in an MOA), and those needed to report status, quality, etc. of data processing/transmission (covered in the Data Products ICDs) Also be sure to address reports you expect to get from the GSSC and MOC and if they are read by people or processed by software  Response –Reports defined in Section 5  Status –Closed

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 714 RFA 8 – Command & Control System Definition  RFA 8 Specific Request: –ISOC does not yet know what system it is using to process Observatory Housekeeping Data or perform the commanding  Response –ISOC command and control system will be a hybrid of ITOS and software developed at SLAC –Covered in section 3.1 of this CDR presentation  Status –Closed

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 715 RFA 9 – Lessons Learned  Specific Request –Need to describe results of Lessons Learned efforts at the ISOC CDR. Recommend focus be on using these efforts to analyze comparative ISOC complexity and staffing approach/profile  Response –Members of the ad hoc planning group for the definition of the LAT IOC (now ISOC) made visits to the operations centers for GP- B, RHESSI, and Chandra LAT ISOC can learn from others but there are no direct models Co-location important to maximize science Testbed important for flight software updates Co-location important to keep all science members in the loop  Status –Closed

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 716 RFA 10 – ISOC Validation with LAT  Specific Request –Not clear that the ISOC plans to interact with the instrument during Instrument I&T –ISOC should have verification milestones with LAT instrument, at least, during environmental tests. –ISOC should have significant participation in S/C integration activities at Spectrum Astro  Response –We will be working with I&T during instrument integration and expect to do testing with the instrument during instrument level environmental testing at NRL in advance of our operational readiness at observatory level I&T. –As the I&T schedule is necessarily constrained, most of the developmental testing will be done with the LAT testbed which provides an accurate, and available, surrogate. –Development schedule in section 8 shows Verification milestones Test activity at NRL Participation in integration activities at Spectrum  Status –Closed

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 717 RFA 11- LAT Modes (1/2)  Specific Request –The LAT Operations Team and Spectrum Astro should work together to verify if any interactions between LAT modes and spacecraft modes need to occur. For example, if a LAT mode change requires the spacecraft to change spacecraft mode and/or configuration.  Response –Identified and confirmed LAT modes with FSW –Except for autonomous repoint requests, LAT mode changes do not drive spacecraft changes  Status –Submitted

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 718 RFA 11 – LAT Modes (2/2) Mission ModesSC ModeLAT Mode Launch  S-Band rcvr/xmit  On battery power Off Early Orbit  Inertial capture  S-Band rcvr/xmit  Sun point with solar arrays tracking Survival Engineering  Inertial point, zenith point, or maneuver  Ku-Band xmit, S-Band rcvr/xmit  Solar arrays tracking Science Calibration Diagnostic SAA LAT Safe Sky Survey  Zenith point  Ku-Band xmit, S-Band rcvr/xmit  Solar arrays tracking Pointed and Repointed  Inertial point, maneuver  Ku-Band xmit, S-Band rcvr/xmit  Solar arrays tracking Safe mode  Inertial capture, sun point  S-Band rcvr/xmit  Solar arrays fixed Survival Re-Entry  Cruise, delta-V  S-Band rcvr/xmit  Solar arrays tracking Off

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 719 RFA 12 – EEPROM Write Cycles  Specific Request –EEPROMs have a limited number of write cycles before they become unreliable. It is not clear that the operations concept/plan factors in this limitation. Understand the number of writes to EEPROM on LAT from all sources  Response –The number of EEPROM writes is not an issue using the TrueFlash File System (TFFS) overlay TFFS counts the writes to each sector of the file system underneath and will move files around to even the wear across all sectors At 100 kByte a day, 5Gbyte would last 50,000 days or approximately 150 years –If TFFS is not used, ISOC will work with FSW to develop an operations plan to manage EEPROM writes  Status –Closed

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 720 RFA 13 – Detailed Development Schedule  Specific Request –No development schedules were provided (at Peer Review) to enable the Review Board to determine overall “maturity” of LIOC design and whether it can meet its scheduled CDR date (late May 2004) –Provide detailed ISOC development/test schedules and solicit Review Board feedback  Response –Prepared development schedule –Covered in section 8 of this review  Status –Closed

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 721 RFA 14 – Data Storage Agreements  Specific Request –LAT should enter a more formal agreement with SLAC management on required data storage and processing requirements LAT should clearly identify its average and peak needs SLAC management should commit a base capability  Response –Estimate of processing and data storage requirements performed for SAS by R. DuBois Cost determined and built into ISOC out-year funding plan and accepted by SLAC Director of Research –Database costs still being evaluated by database working group but now expected to be minimal or covered completely by SLAC central computing services due to small size (~ 1Tb) of database  Status –Closed

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 722 RFA 15 – ISOC Org. and Comm. (1/2)  Specific Request –What problem are you solving by separating the ISOC into two organizations, LOF & SOG? Recommendation: merge these two organizations into a single group with an experienced manager. –Also need to ensure that the ISOC ground/operations team and the Flight Software Team are coordinating and communicating where needed. It is critical that these two teams work together to ensure that the FSW design is consistent with the ISOC design and operations concepts. Describe how this coordination is occurring, or if it’s not occurring adequately, describe and implement a plan ASAP for making it happen. Also, ensure that the relationship between the SOG and SAS is clear, understood, and documented.

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 723 RFA 15 – ISOC Org. and Comm. (2/2)  Response –The current ISOC organization eliminates the LOF/SOG/SAS distinction All requirements for monitoring housekeeping and on monitoring science data are on the ISOC as a group, not on individual functional units The ISOC manager is ultimately responsible for all ISOC functions; he may choose to designate a manager to oversee some subset of these functions The team leads of each of the functional units within the ISOC meet daily and are jointly responsible for successful operation of the instrument and the production of science data –The coordination between the ISOC and FSW has been improved significantly by scheduling weekly meetings between the ISOC and the FSW team to ensure that requirements are consistent and that assumptions about scenarios, modes and anomaly resolution are shared between the two teams  Status –Closed

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 724 RFA 16 – Requirements on I&T and SAS (1/2)  Specific Request –The mechanism for ISOC requirements being placed on I&T and SAS is not obvious. How do ISOC requirements get levied on I&T and SAS? Does ISOC sign off on I&T and SAS specs and functional designs?  Response –Potential requirements are discussed at the regular working meetings now held between the staff of these two subsystems. If requirements are found that are not currently covered within the existing documents, a change is jointly proposed and the relevant documents are modified.

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 725 RFA 16 – Requirements on I&T and SAS (2/2)  Response, continued –Where joint requirements were found, we have agreed to share personnel to execute them. Specific examples include: We required I&T to fully document their calibration procedures for use during operations and we are now sharing a technical writer who is working with I&T and ISOC to ensure that the resultant documents meet requirements for both subsystems. The ISOC also required that I&T data be consistent with ISOC needs. The ISOC is providing the database programmer needed by I&T and will thus ensure that the resultant database meets of the ISOC. –ISOC is involved in the development of all LAT Specs and functional designs. The ISOC manager is a signatory on all plans from the I&T and SAS subsystems.  Status –Closed

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 726 RFA 17 – ISOC Tools  Specific Request –The tools needed to run the LOF/SOG need to be specified. Which HK and science parameters will be monitored and in what way? What actions would be taken based on the results seen with these tools? How does the ISOC team know from a design perspective that the collection of the described I&T tools will function in the operations environment as an integrated system? –Need lists of which software tools are required to achieve the ISOC’s requirements are needed.  Response –ISOC tools have been identified – covered in section 5  Status –Closed

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 727 RFA 18 – Automation of Operations Software  Specific Request –Specify plans and requirements for automation of operations software, and describe the software design for how the automation needs will be met  Response –Level 3 requirements for autonomous operation have been specified (LAT-SS ) and these have been mapped to software elements. –Primary software components and data flows for autonomous operation of the ISOC discussed in section 5  Status –Closed

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 728 RFA 19 – Robustness of Operations Software  Specific Request –Specify plans and requirements to ensure that software, particularly that “inherited” from I&T, will be of sufficient robustness for operations use.  Response –Using ITOS for LAT health and safety operations –Other software tools Using existing software where possible – identified in section 5 Complete verification and validation process –Automated notification software tools  Status –Closed

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 729 RFA 20 – Ground Element Involvement in LAT Operations  Specific Request –Specify what other ground system elements will be involved in LAT operations and what their roles and responsibilities will be  Response –Responsibilities of other ground elements in LAT operations are identified in the ISOC Operations Plan (LAT-SS-1378) and will also be documented in an Operations Agreement (to be written by the MOC) MOC will be responsible for monitoring real-time and playback LAT housekeeping data against limits supplied by the ISOC and will notify ISOC of out-of-limit conditions and perform contingency procedures at the direction of the ISOC MOC will notify ISOC when an Instrument Alert message is received that involves the LAT  Status –Closed