Project Management.

Slides:



Advertisements
Similar presentations
WBS: Lowest level OBS: Lowest level
Advertisements

OPSM 301 Operations Management Class 8: Project Management: Introduction and CPM Koç University Zeynep Aksin
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
WEEK 4 Introduction to Project Management 1. Communication Plan Objectives Objective is to determine: ◦ Who needs to know what? ◦ How will they be told?
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
Project Management Project  A series of related jobs usually directed toward some major output and requiring a significant time to perform Project management.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
1 Project Planning BA Project Planning and Control Definition of Project Management Work Breakdown Structure Critical Path Scheduling Ideal Completion.
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
1 Chapter 3 part 1 Project Management. 2 Why is Project Management Important?  Why do I need to know this stuff? –Relevant across functional areas 
Project Management Operations -- Prof. Juran. 2 Outline Definition of Project Management –Work Breakdown Structure –Project Control Charts –Structuring.
Chapter 17 Project Management 1Saba Bahouth – UCO.
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Project Management Operations.
Chapter 16 – Project Management
Project Management. Maintenance and Reliability 14 Aug 2001.
J0444 OPERATION MANAGEMENT Project Management Pert 5 Universitas Bina Nusantara.
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
Roberta Russell & Bernard W. Taylor, III
To accompany Quantitative Analysis for Management, 8e by Render/Stair/Hanna 13-1 © 2003 by Prentice Hall, Inc. Upper Saddle River, NJ Chapter 13.
4–14–1. 4–24–2 Chapter Four Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
© The McGraw-Hill Companies, Inc., Chapter 3 Project Management.
Irwin/McGraw-Hill Project Management  Project series of related jobs usually directed toward some major output and requiring a significant period of time.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Operations Management Project Management
Chapter 3 Project Management.
WEEK 4 Introduction to Project Management 1. Communication Plan Objectives Objective is to determine: ◦ Who needs to know what? ◦ How will they be told?
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Project Management Project 01 – OFF CLASS. 3 Project Management Project – series of related jobs usually directed toward some major output and requiring.
1-1 1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved.
Operations Management For Competitive Advantage 1 Project Management Operations Management For Competitive Advantage Chapter 3.
PROJECT MANAGEMENT Chapter Four Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Lean Project Management
3 - 1© 2011 Pearson Education 3 3 Managing Projects PowerPoint presentation to accompany Heizer and Render Operations Management, 10e, Global Edition Principles.
1 Slides used in class may be different from slides in student pack Chapter 3 Project Management  Definition of Project Management  Structuring Projects.
Intro : Project Management. 1.Project : series of related jobs usually directed toward some major output and requiring a significant period of time to.
1 Chapter 3 Project Management  Definition of Project Management  Work Breakdown Structure  Project Control Charts  Structuring Projects  Critical.
1 Project Management Seminar Project Scheduling. 2 Importance of Project Management Three Components of Project Management Project Evaluation and Review.
WEEK 4 Introduction to Project Management. Agenda Phase 2: Planning ◦ Communication Plan ◦ Scheduling Preparation  Build an AON Diagram  Determine Critical.
Chapter 10. Activity-on-Node Network Fundamentals X Y Z Y and Z are preceded by X Y and Z can begin at the same time, if you wish (B) ABC A is preceded.
To accompany Quantitative Analysis for Management, 7e by Render/Stair 13-1 © 2000 by Prentice Hall, Inc., Upper Saddle River, N.J Quantitative Analysis.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
MBA 8452 Systems and Operations Management
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
1 OMGT 3123 Project Management  Project Controlling  Project Management Techniques: PERT And CPM  The Framework Of PERT And CPM  Network Diagrams And.
© The McGraw-Hill Companies, Inc., Project Management CPM and PERT.
Tata McGraw CHAPTER 3 Project Management. Chapter 3 Project Management.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
Operations Fall 2015 Bruce Duggan Providence University College.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
© The McGraw-Hill Companies, Inc., Chapter 3 Project Management.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 10 Projects.
OPSM 301 Operations Management Class 18: Project Management: Introduction and CPM Koç University Zeynep Aksin
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
1 Slides used in class may be different from slides in student pack Chapter 3 Project Management  Definition of Project Management  Work Breakdown Structure.
Operations Management Project Management Chapter 3.
Prepared by Raida Al-Awamleh 1 Project Management Training Program June 24 th -28 th,2006.
2010© Wiley Chapter 16 – Project Management Operations Management by R. Dan Reid & Nada R. Sanders 4 th Edition © Wiley PowerPoint Presentation by R.B.
Chapter 3 Project Management. Chapter 3 Project Management.
Project Management Project Controlling
PROJECT MANAGEMENT.
Project Management Operations -- Prof. Juran.
Learning Objectives When you complete this chapter, you should be able to : Identify or Define: Work breakdown structure Critical path AOA and AON Networks.
Time Planning and Control Activity on Node Network (AON)
Critical Path Method (CPM). Background & History Developed in the 1950s by the US Navy & Du Pont. Originally, the critical path method considered only.
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Chapter 3 Project Management.
Project Management Operations -- Prof. Juran.
Time Planning and Control Activity on Node Network (AON)
Presentation transcript:

Project Management

Why project management? Re: Any Marketing/Advertising PM's out there? Posted by: "kquain" kquain@wal-mart.com   kquain Wed Mar 7, 2007 10:29 am (PST) I had a number of direct responses to this post which I really appreciate (I just joined yesterday, and am already pleased with my decision to join). My inquiry was driven by the fact that we are having some difficulty finding PM's experienced in marketing/advertising and or large scale retail. I'm honestly getting alot of applicants who are designers or copy writers which, as you can imagine, makes me a bit hesitant. As the Director of Process & Production at Wal-Mart, my team manages all Marketing Creative projects for Wal-Mart. We work on everything from the instore signage, to billboards, to tv advertising, to our bi- weekly printed circular. I need PM's with print and broadcast experience that aren't just robotic PM's but also really understand customer service and account management. We have PM openings and Sr. PM openings. If you are seriously interested, I encourage folks to send their resumes to me. We're making some very big changes here at Wal-Mart; people who join us now have the chance to make a big impact on the way Wal-Mart works. I truly believe this is a chance/experience of a lifetime for passionate PM's. Thanks again for all the responses! Kelley Troia

Why project management? New Member Posted by: "kelly_boatright" kelly_boatright@dell.com   kelly_boatright Wed Mar 14, 2007 8:38 am (PST) Hello WiPM, I am a new member, and happy to see so many members in the PM world. I think PM is a perfect fit for women as we are natural multi- taskers, yes? I am a member of Dell Global Services, the consulting arm of our company. We are looking for talented women across all areas of Services, but especially to lead our larger accounts as a Sr. PM or Program Executive. There are also opportunities in TAM (Technical Account Manager) positions in many markets as well. We have current and potential accounts across the U.S., therefore our roles are located in major markets- NY/NJ, Seattle, Washington D.C., Southern CA. In addition to sourcing out talent for DGS, I do incorporate some PM into my role keeping one foot in the business. After a few years in NYC I've moved to Austin. Most of my time is spent with my two dogs (adopted mixed are the best), and my husband. We like taking long walks, hiking and, of course, going to the dog park. If interested in opportunities with Dell Global Services, you may send your resume to my email, or feel free to contact me in order to learn more. Kelly Boatright Talent Acquisition Dell | Global Services Cell: (512) 672-9893 Desk: (512) 723-4373 Email: kelly_boatright@dell.com Linked In: http://www.linkedin.com/in/kellyboatright Dell Careers: www.dell.com/careers

Overview What is project management Work breakdown structure Project scheduling Gantt charts CPM

Project Characteristics Single unit Many related activities Difficult production planning and inventory control General purpose equipment High labor skills It is helpful here to provide an expanded discussion of the activities.

Examples of projects Personal Company/Non-profit Build a house Plan Olympics Intro. new product Install a new software Plan a military operation Hoover dam Produce a movie Obtain a degree Obtain a job Plan a wedding Move Have a baby Thanksgiving dinner Rebuild a car

Project Management Questions What activities are required to complete a project and in what sequence? When should each activity be scheduled to begin and end? Which activities are critical to completing the project on time? What is the probability of meeting the project completion due date? How should resources be allocated to activities?

Management of Large Projects Planning - goal setting, project definition, team organization Scheduling - relating people, money, and supplies to specific activities and activities to one and other Controlling - monitoring resources, costs, quality, and budgets; revising plans and shifting resources to meet time and cost demands

Elements of Project Management Planning Set goals Define project Develop work breakdown schedule Identify team/resources

Elements of Project Management Schedule Sequence activities Assign people Schedule deliverables Schedule resources

Elements of Project Management Control Monitor resources, costs, quality Revise/change plans Shift resources

The Role of the Project Manager Project Plan and Schedule Revisions and Updates Project Manager Team Top Management Resources Performance Reports Information regarding times, costs, problems, delays Feedback Loop

Organizational structures for projects Pure project structure - a self-contained team works full-time on the project Functional project structure - housed within a functional division; team members remaining part of the functional units and typically are not dedicated to the project Matrix project – blends the function and pure project structures. The project uses people from different function areas. A dedicated project manager decides which determines and schedules tasks but the functional manager assigns people.

Pure Project Structure Advantages The project manager has full authority over the project Team members report to one boss Shortened communication lines Team pride, motivation, and commitment are high 8

Pure Project Structure Disadvantages Duplication of resources Organizational goals and policies are ignored Lack of technology transfer Team members have no functional area "home" 8

Functional Project President Research and Development Engineering Manufacturing Project A B C D E F G H I Example, Project “B” is in the functional area of Research and Development. 9

Functional Project Structure Advantages A team member can work on several projects Technical expertise is maintained within the functional area The functional area is a “home” after the project is completed Critical mass of specialized knowledge 10

Functional Project Structure Advantages Aspects of the project that are not directly related to the functional area get short-changed Motivation of team members is often weak Needs of the client are secondary and are responded to slowly 11

Matrix Project Structure President Research and Development Engineering Manufacturing Marketing Manager Project A Project B Project C 12

Matrix project structure Advantages Enhanced communications between functional areas Pinpointed responsibility Duplication of resources is minimized Functional “home” for team members Policies of the parent organization are followed 13

Matrix project structure disadvantages Too many bosses Depends on project manager’s negotiating skills Potential for sub-optimization 14

Work Breakdown Structure 1. Project 1.1 Major task 1 1.1.1 Subtask 1 of major task 1 1.1.1.1 Activity 1 of subtask 1 1.1.1.2 Activity 2 of subtask 1 1.1.2 Subtask 2 of major task 2 1.2 Major task 2 1.2.1 Subtask 1 of major task 2 1.2.2 Subtask 2 of major task 2 1.3 Major task 3

Work Breakdown Structure How is this project structured? List the 1st level of the work breakdown structure.

Project Scheduling Techniques Gantt chart Critical Path Method (CPM) Program Evaluation & Review Technique (PERT) (SKIP) As you discuss the various project scheduling techniques, you should include at least: - the basic assumptions of the technique - problems typically encountered in applying it - the nature of the effort required to keep the tool current - sources of problems - the nature of the decisions supported by the tool - the nature of the management effort and cost associated with using the tool. © 1984-1994 T/Maker Co.

PERT and CPM Network techniques Developed in 1950’s CPM by DuPont for chemical plants PERT by U.S. Navy for Polaris missile Consider precedence relationships and interdependencies Each uses a different estimate of activity times What circumstances lead the two organizations to develop different, yet similar tools for the management of complex projects? In your discussion of PERT/CPM, you should probably note that PERT helps us identify critical tasks/activities and look at the probability of completing the project by a given date; CPM helps us analyze the cost/time tradeoffs possible if we need to speed the project up.

Consumer Product Development A company has 16 weeks for the development of a consumer product from initiation through the market test phase. Every week after 16 that this project is not completed the company is losing $1000 in profit.

A -- 3 B 1 C 5 D E 6 F G B,D,F 2 H 8 Activity Symbol Preceding Activities Time estimate (weeks) Investigate demand A -- 3 Develop pricing strategy B 1 Design product C 5 Conduct promotional cost analysis D Manufacture prototype models E 6 Perform product cost analysis F Perform final pricing analysis G B,D,F 2 Conduct market test H 8

Network for Product Development

Gantt Chart for Product Development

Questions Which May Be Addressed by PERT & CPM Is the project on schedule, ahead of schedule, or behind schedule? Is the project over or under cost budget? Are there enough resources available to finish the project on time? If the project must be finished in less than the scheduled amount of time, what is the way to accomplish this at least cost?

Steps in the CPM 2. Activity Sequencing and Network Construction 1. Activity Identification 2. Activity Sequencing and Network Construction 3. Determine the critical path From the critical path all of the project and activity timing information can be obtained 15

Network closeup The next series of slides presents Example 4.1. The series builds in steps to the conclusion of the Example showing the development of key equations along the way. This slide advances automatically. 9

Arrow: Activity A precedes Activity B Node: Activity B – Construct collection stack Arrow: Activity A precedes Activity B B A The next series of slides presents Example 4.1. The series builds in steps to the conclusion of the Example showing the development of key equations along the way. This slide advances automatically. Node: Activity A – Build internal components 9

Activity Relationships Start A B

Critical path for House Building Example Immediate Activity Description Predecessor(s) S Pour foundation and frame — T Buy shrubs, etc. — U Roof S V Do interior work S W Landscape T, U

Network for House Building Example Start

Network for House Building Example (6) Start

Network for House Building Example (6) Start T (3)

Network for House Building Example (6) U Start (2) T (3)

Network for House Building Example V (6) (3) U Start (2) T (3)

Network for House Building Example V (6) (3) U Start (2) T W (3) (4)

Network for House Building Example

Critical path for House Building Example

Critical path for House Building Example V (6) (3) U Start End (2) T W (3) (4)

Gantt Chart Earliest Start and Finish S Fdn & frame T Buy shrubs U Roof V Interior work W Landscape 4 5 6 7 8 9 1 2 3 Activity Build House Project This and the following slide illustrate the translation of Early and Late Start and Finish time to Gantt charts.

Gantt Chart Latest Start and Finish 1-2 Fdn & frame 1-3 Buy shrubs 2-3 Roof 2-4 Interior work 3-4 Landscape 4 5 6 7 8 9 1 2 3 Activity Build House Project

Example CPM Consider the following consulting project: Activity Designation Immed. Pred. Time (Weeks) Assess customer's needs A None 2 Write and submit proposal B 1 Obtain approval C Develop service vision and goals D Train employees E 5 Quality improvement pilot groups F D, E Write assessment report G Develop a critical path diagram and determine the duration of the critical path and slack times for all activities.

Example: First draw the network Act. Imed. Pred. Time A None 2 B A 1 C B 1 D C 2 D(2) E(5) E C 5 F D,E 5 G F 1 F(5) A(2) B(1) C(1) G(1) 18

Example: Determine the critical path Act. Imed. Pred. Time A None 2 B A 1 C B 1 D C 2 D(2) E(5) E C 5 F D,E 5 G F 1 A(2) B(1) C(1) G(1) F(5) 18

Critical Path Analysis Provides activity information Earliest (ES) & latest (LS) start Earliest (EF) & latest (LF) finish Slack (S): Allowable delay Identifies critical path Longest path in network Shortest time project can be completed Any delay on critical path activities delays project Critical path activities have 0 slack Go to Excel OM This and the next several slides illustrate the definitions of terms appropriate to critical path analysis. There are many opportunities for good managers to truly manage a project once they have a PERT network established. For instance, sub-contractors know early start and late start times and the managers know the activities on the critical path upon which to focus effort.

Project management software Microsoft Project

Benefits of CPM Useful at many stages of project management Mathematically simple Uses graphical displays Gives critical path & slack time Provides project documentation Useful in monitoring costs There are those that argue that the Polaris could not have been built without the use of project management techniques (PERT).

Limitations of CPM Assumes clearly defined, independent, & stable activities Specified precedence relationships Subjective time estimates Over-emphasis on critical path Another issue with respect to the use of PERT/CPM is the cost and amount of management time require to keep the system up to date.

Milwaukee General Hospital (MGH) The EPA has given MGH 16 weeks to install air pollution control equipment in its laundry/cleaning operation facility. MGH has been warned that if the equipment is not installed within the 16 week time period, it may be forced to temporarily close its facilities.

Milwaukee General Hospital’s Activities and Predecessors Activity Description Immediate Predecessors A Build internal components - B Modify roof and floor C Construct collection stack D Pour concrete and install frame A, B E Build high-temperature burner F Install pollution control system G Install air pollution device D, E H Inspect and test F, G

AON Network for Milwaukee General Hospital Start A B C D F G H Arrows show precedence relationships

Critical Path for Milwaukee General Hospital Start H B D G Red Arrows show critical path

Gantt Chart Earliest Start and Finish Milwaukee General Hospital A Build internal components B Modify roof and floor C Construct collection stack D Pour concrete and install frame E Build high-temperature burner F Install pollution control system G Install air pollution device H Inspect and test 1 2 3 4 5 6 7 8 9 10 1112 13 1415 16 This and the following slide illustrate the translation of Early and Late Start and Finish time to Gantt charts.

Gantt Chart Latest Start and Finish Milwaukee General Hospital A Build internal components B Modify roof and floor C Construct collection stack D Pour concrete and install frame E Build high-temperature burner F Install pollution control system G Install air pollution device H Inspect and test 1 2 3 4 5 6 7 8 9 10 1112 13 1415 16 This and the following slide illustrate the translation of Early and Late Start and Finish time to Gantt charts.