Review of FAA Guidelines for Fabric Prepreg Material Specification

Slides:



Advertisements
Similar presentations
1 FAA/NASA/Industry Review of Key Characteristics for Composite Material Control Mark Chris, Principal Engineer Bell Helicopter Textron Composite M&P /
Advertisements

Agenda Introduction Advisory Circular Changes Consultant Selection Procedures Contract Format and Provisions Methods of Contracting and Allowable Costs.
AS9102 First Article Inspection Report
Transition from Q1- 8th to Q1- 9th edition
API - WI 2348 Methodology to provide Mechanical Assurance in DCB test
First Article Inspection Report
Variation Management of Key Characteristics
Supplier SQM Participation. 2 | MDT Confidential What is SQM? Stands for Supplier Quality Managment –Formally referred to as SPACE and SPICE Is a system.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Process Specification Guidelines FAA/NASA Workshop 6 August 2002.
September 12 th 2003 Chris Ridgard Material Specifications For Fabric Prepregs Comments on Unofficial Draft Recommendations – August 22 nd Presented.
FAA/NASA Workshop on Key Characteristics for Composite Material Control - Chicago, IL M17 M&P NWG DRR August 6 - 8, 20021/12 Carbon Tape Material Specification.
8/6/ Material and Process Spec Review Cindy Cole Certification and Materials Engineer The Lancair Company.
Guidelines for Carbon Fiber Fabric/Epoxy Prepreg Specifications
0 FAA Workshop on Key Characteristics for Composite Material Control September 16 th – 18 th, 2003 Alan J. Norwid Principal Engineer M&P Ext.
9/17/2003 1LRM Spec Review LRM Material and Process Spec Review Cindy Cole Certification Manager The Lancair Company.
Mary PacherFAA Workshop – Chicago September 16-18, 2003 Comments: Liquid Resin Molding Specifications Guidelines clearly indicate the critical importance.
Sikorsky A United Technologies Company FAA / NASA Workshop, Chicago, IL – August 6-8, 2002 Review of FAA Material Specification Guidelines Document John.
FAA Workshop on Key Characteristics for Advanced Material Control
Guidelines and Recommendations for the Development of a Material Specification for Carbon Fiber Reinforced Liquid Resin Molded Materials Gregg Bogucki.
FAA Workshop on Key Characteristics for Composite Material Control
FAA Regulatory Policy for Composite Material Control Presented at 8/8/02 FAA/NASA Workshop (Chicago, IL) Introduction – Importance of stabilizing composite.
FAA FAA Advisory Circular Presented at 9/16/03 Workshop (Chicago, IL) Background – Purpose of the advisory circular – Related regulations & guidance materials.
FAA Specification Meeting Steven Peake FiberCote Industries Waterbury, CT.
FAA/NASA Workshop on Key Characteristic's for Composite Material Control Chicago, IL Cytec Engineered Materials August 6th 2002.
FAA Workshop, September 2003 Key Characteristics For Advanced Material Control Fabric Prepreg Material Control Industry Review.
Review of Liquid Resin Molding Specifications FAA Workshop September 2003 Scott Reeve National Composite Center.
FAA/NASA Meeting on Industry Composite Specifications August 2002 FAA Report on Proposed Industry Prepreg Specifications Ric Abbott Abbott Aerospace Composites.
Quality control of raw materials In-process control
TS16949 requirements Subjects –Audit planning –Recertification audit requirements –Auditing Remote supporting functions.
 User Manuals come in all types, designs and formats.  This presentation is designed to show a few basic elements that will serve any user manual. 
Radiopharmaceutical Production
Guidelines for Carbon Fiber Tape Prepreg Specifictions W.T.McCarvill S.Ward August 6, 2002.
Composite reinforcements come in many styles
World Health Organization
VALIDATION METHODOLOGY
DOT/FAA/AR- 02/109 Guidelines and Recommended Criteria for the Development of a Material Specification For Carbon Fiber/Epoxy Unidirectional Prepregs Overview.
CRICOS Provider Code: 01505M RTO Number: 3045 DHS V Implement Food Safety Procedures SITXFSA001A.
Some Thoughts on Shared Databases Stephen Ward SW Composites Taos, NM.
1 Presentation Template: Instructor Comments u The following template presents a guideline for preparing a Six Sigma presentation. An effective presentation.
Time series Model assessment. Tourist arrivals to NZ Period is quarterly.
Process System Capability An introduction to 9103 ‘VARIATION MANAGEMENT OF KEY CHARACTERISTICS’ Bernard LAURAS AIRBUS.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
Final Rule for Preventive Controls for Animal Food 1 THE FUTURE IS NOW.
FAA Composite Safety & Certification Initiatives Presented at 9/16/02 FAA Workshop (Chicago, IL) Overview – Background – Technical thrust areas – Major.
Software Requirements Specification Document (SRS)
Comments on Fabric Material Procurement Document (9/17/2003): statement of purpose - guidelines not requirements … see J. Tomblin notes what type of parts.
19-Feb-16 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this.
United States Department of Agriculture Food Safety and Inspection Service Overview of Trim Sampling Compliance Guidelines and Discussion Daniel Engeljohn,
Prof. David Bourne TEAM F : ADD_IN Astha Prasad Dan Berman Ihsane Debbache Nikhil Baheti 4DOF.
Internal Audit Quality Assessment Guide
External Provider Control
Royal Lovingfoss John Tomblin Rachael Andrulonis Jeff Gilchrist
WHO Technical Report Series, No. 953, 2009
Presentation Title Goes Here
Conducting the performance appraisal
Building Configurable Forms
Conducting the performance appraisal
Standards and Certification Training
Global Supplier Quality Early Production Containment Training
IPPC second consultation 1 July to 30 September 2018
  Aptiv Global Supplier Quality Early Production Containment Training.
RISK REDUCTION PROCESS
First Article Inspection
MODULE B - PROCESS SUBMODULES B1. Organizational Structure
TRTR Briefing September 2013
Global Supplier Quality Early Production Containment Training
PREREQUISITE PROGRAMS
GL 51 – Statistical evaluation of stability data
Fiber Reinforced Polymer Systems
Presentation transcript:

Review of FAA Guidelines for Fabric Prepreg Material Specification Laura Fournier Toray Composites (America), Inc September 16, 2003 Chicago, IL Introduction Background Most people may know Toray as a fiber supplier Toray Composites – prepreg manufacturer located in Tacoma, WA Involvement with AGATE program for the last 5 yrs. Including a T700-12K PW flat-weave that is qualified Will review guideline from the point of view as a material supplier and with these set of backgrounds

Major Concerns Loss of affordability Too specific for a guideline Guideline will become strictly enforced Timeframe to establish an industry spec Shift to supplier responsibility (and thus liability) from end-user Affordability The guideline builds on top of the foundation built by AGATE, and do not want to lose focus of affordable materials. Too specific Overspecifies and gets into details for a guideline. Consider to allow each specification to fill in the details, and only state what needs to be included in the spec Guideline not Policy Reminder that should be a guideline, and it will not become enforced policy Timeframe for Industry Spec How long will it take to establish a usable industry standard specification? The guideline does a good job in looking how the “before picture” (end-user spec) and the “after picture” (industry spec), but what do we do in the meantime? It shows a clear path of where we’re starting, and where we want to be, but does not clearly address what should happen in the short term. Shift to supplier from end-user More initial testing (and therefore cost and responsibility) is being shifted from end-user to the supplier. Supplier should be responsible in developing the lowest tier of the building block, but some levels above that is design specific should be tested by the TC applicant.

List of Acronyms 1.3 Related Documents Page # Questions & Comments viii DER & DMIR is repeated twice 1.3 Related Documents 3 Is DOT/FAA/AR-03/19 currently available?

1.4 Certification Process Page # Questions & Comments 4 3rd para., last sentence: “It is critical that the test specimens fabricated through the various levels of building block approach use the same process, which is representative of the one that will be used in the fabrication of production aircraft and rotorcraft” What if there are multiple process cycles used for various parts? What is meant by representative?

1.5 Recommended Specification Format Page # Questions & Comments 5-6 Suggest to include QPL or slash sheets (for industry specifications) at the end of the outline

2. Development of Material Controls Page # Questions & Comments 6 1st para., 1st sentence: “Before the initiation of a qualification program, the sensitivities of the material to variations in the tolerances set on the material chemical and physical properties and processing should be investigated.” Once the limits are established during a pre-qualification, is it intended that the qualification batches are produced to nominal process conditions? or with the extreme limits incorporated into the qualification batches?

2.1 Industry Material Specification Page # Questions & Comments 7 This section assumes there is already an established industry specification prior to material qualification. How is a qualification handled if there is no established industry specification, and there are multiple customers? What do we do in the meantime before an industry specification is released? How long will organizations such as AMS take to release such a industry spec? Need some guidance in the short term.

2.1 Industry Material Specification Page # Questions & Comments 7-8 2nd para., last sentence: “...a material specification may contain target values in place of requirements; in this case, following qualification, the target values are updated to requirements based on the evaluation results.” 4th para., first sentence: “With this industry specification approach, the traditional process of qualifying a material to an existing material specification (containing either target requirements or requirements from a previously qualified material) is no longer applicable.” Is initial specification prior to qualification needed or not? Conflicting statements.

2.1 Industry Material Specification Page # Questions & Comments 8 5th para.: “It will be the responsibility of the material supplier to continually test and evaluate the material to populate the database on an ongoing basis to ensure that the material has not changed.” This is accomplished through the supplier’s batch acceptance tests and not full testing.

2.5 Material Qualification Process When Using an End-User Material Specification Page # Questions & Comments 11 2nd para.: “In this process, it is anticipated that the material supplier will: 4th bullet: submit the material and accompanying data, material specification, and allowables to potential end-user” For an end-user specification, material specification and allowables is not provided by the supplier. Suggest to delete.

2.5 Material Qualification Process When Using an End-User Material Specification Page # Questions & Comments 11 3rd para.: “At this point the end-user will: last bullet: upon completion of the testing, calculate proposed material batch acceptance limits and B-basis allowables values. Specification limits and allowables will be calculated using procedures documented in DOT/FAA/AR-03/19 and MIL-HDBK-17.” Is the end-user limited to only the approaches described in DOT/FAA/AR-03/19 and MIL-HDBK-17?

3. The Scope Section of the Material Specification Page # Questions & Comments 12 2nd para: “It is recommended that for end-user material specifications: 1st bullet: Form – defines the basic form Suggest to give example 2nd and 4th bullet: Style - ...fiber tow count... Class - ... tow count... Tow count appears in both style and class

4. The Applicable Documents Section of the Material Specification Page # Questions & Comments 13-16 Document number listed with and without revision levels. Recommend consistency.

5.1.1 Batch Definitions Page # Questions & Comments 17-18 Suggest that the guideline only state that batch should be defined in each specification. Each specification would be required to define the batch, but may choose how a batch is defined for each process (resin, filming, prepreg). Suggest also that a roll should be defined in each specification.

5.3.2 Fabric Requirements Page # Questions & Comments 22 Table 2A: Recommended Set of Fabric Properties Recommend to add: Selvage Edge Thickness (optional) Length (optional)

5.3.3 The Fiber Requirements Section Page # Questions & Comments 23 Table 2B: Recommended Set of Carbon Fiber Properties Recommend to add: Yield (mass/unit length) Elongation

5.5.3 Cured Laminate Mechanical Properties Page # Questions & Comments 29 2nd para., 1st sentence: “...it is recommended that a second set of tests be run on an ongoing basis to further populate the database” Loss of affordability with more testing. Propose to increase database with the batch acceptance tests. 3rd para., last sentence: “An additional set of open-hole laminate tests is recommended for inclusion in the specifications for materials intended for more general applications.” Again, possible loss of affordable materials.

5.5.3 Cured Laminate Mechanical Properties Page # Questions & Comments 29 4th para., 1st & 2nd sentence: “Further sets of recommended tests for an expanded database are then presented. These tests are optional with regard to inclusion in the material specification, but may be required for the design and certification of an end-user’s product.” Shift from end-user to material supplier’s responsibility for possibly design specific testing.

5.5.4 Recommended Laminate Tests Page # Questions & Comments 32 33 Table 5A: Ply Lay-up Sequences for Recommended Laminate Tests – Prepreg Fabric Materials Recommended Thickness Range for Selecting ‘n’ (in) Thickness recommendation is different from AGATE. Where did these thickness recommendations come from? Table 5B: Recommended Minimum Set of Cured Laminate Mechanical Properties – Prepreg Fabric Materials ±45 Shear Test Type: In-plane Shear ASTM D3518 Recommend to also include ASTM D5379 V-Notch IPS.

5.5.4 Recommended Laminate Tests Page # Questions & Comments 35 1st para. on pg. 35: “It is recommended that fatigue testing of open-hole specimens be conducted to confirm that the parts will be durable over the expected service life. Post-impact residual strength evaluation for damage tolerance is recommended for primary structure applications. Fatigue testing of impact-damaged specimens may also be required for certification of certain primary structures; however, the detailed recommendations for these tests are beyond the scope of this document” Fatigue testing and damage tolerance, in our opinion, should also be beyond the scope of this document. Affordability and shift in responsibility issues.

5.6.1.1 Industry Material Specification Page # Questions & Comments 40 2nd para., 2nd sentence: “The organization that will conduct the tests shall submit a test plan, material specification, and process specification prior to the actual qualification.” What material specification is submitted? The industry specification or an intermediate specification written by the applicant for the qualification?

5.6.1.3 Minimum Level of Testing Page # Questions & Comments 41 3rd para.: “These requirements and acceptance limits are recommended to be established as: 1st bullet: maximum average, minimum average, and minimum individual values for all strength properties” What is used to calculate the maximum average? Should it be Wn = X + kn· s ?

5.6.2 Equivalency Baseline Enhancement Page # Questions & Comments 41 1st para., last sentence: “...it is strongly recommended that the material specification contain requirements to test all structural and other properties of interest on each batch, with the test frequency for these tests reduced once the properties are verified to be stable.” Very expensive, this would amount to a continuous qualification. Propose that batch acceptance tests to monitor stability of material.

6.1.4 Level 3 Changes Page # Questions & Comments 46 2nd para., 1st sentence: “Testing to validate level 3 changes should involve a minimum of three batches of prepreg containing a minimum of three batches of resin and two batches of fabric containing a minimum of 2 lots of fiber.” Level 3 change is an equivalency; therefore, it should be one batch of prepreg. 4th para., 1st sentence: “A new revision letter for the applicable material specification should be used when the change is incorporated.” Propose to add “and/or PCD” since some changes may be invisible in the material specification.

6.5.1 Supplier Certification Testing Page # Questions & Comments 49 3rd para., last sentence: “All end-users of a material batch for which retests were performed must be notified at the time of batch shipment.” Recommend to add a provision that only retests that do not have a clear root cause be notified to the end-user. If there is no clear reason why an original set failed, then all tests should be notified.

6.5.2 End-user (Purchaser) Testing Page # Questions & Comments 49 1st para., 2nd sentence: “The material specification should define the number of rolls of each prepreg batch that should be tested by the end-user.” What about if one batch is received in multiple shipments? Shouldn’t receiving inspection be conducted for each shipment?

7.1 Material Identification Page # Questions & Comments 52 1st para., 1st & 2nd sentence: “The batch and roll number should be on two labels, one on the inside of the core, the other on the outside of the shipping wrapper. The label should include the material designation, name of manufacturer, specification number, and date of manufacture.” Third label should be added to the outside of the box. Also, amount of material (either in length or area) should be added.

11 Glossary Page # Questions & Comments 55-56 59 cured ply thickness (CPT) formulas ? appears in place of ρ glass transition temperature (Tg), n – the approximate midpoint... Onset in addition to midpoint can be used to determine Tg