MICE Tracker workshop, 06Nov. 20061 Waveguides for Station5 H. Sakamoto / M. Yoshida.

Slides:



Advertisements
Similar presentations
Takashi Matsushita Imperial College T. Matsushita 1 Station 5 status.
Advertisements

G.Barber: Mice Tracker Meeting New York1 Plans for Sci-Fi Prototyping. Contents:- Mechanical Layout of Sci-Fi Design of the Fibre Optic Connectors.
Waveguides M. Yoshida (Osaka Univ.) MICE meeting at LBNL 09.Feb.2005.
Takashi Matsushita Imperial College T. Matsushita 1 Station five – assembly/QA.
KEK Test Beam Phase II Plan Makoto Yoshida (Osaka Univ.) MICE FT Daresbury 2005/8/30.
Takashi Matsushita Imperial College T. Matsushita 1 Station 5.
Scintillating Fiber and Ribbon Production Update Alan Bross MICE Tracker Phone Meeting September 8, 2006.
Waveguide for full tracker M. Yoshida 2006/11/8 MICE Tracker workshop.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
Clear Fiber and Wave Guide Fab. Makoto YOSHIDA (Osaka Univ.) July MICE FT
1 Losses in the Cooling Channel Malcolm Ellis PID Meeting 1 st March 2005.
Prototype Performance in D0 test stand & fiber intrinsic performance with KEK test beam M.Yoshida (Osaka Univ.) Osaka.
Diamonds & R&D on Pigtails Howard Budd Sep
1 Status of the MICE SciFi Tracker Malcolm Ellis Imperial College London Tuesday 9 th March 2004.
6 th April 2005 Malcolm Ellis, Imperial College London 1 Sci Fi Status & KEK Test.
Scintillating Fiber and Ribbon Production Update Alan Bross MICE CM 16 October 8, 2006.
Tracker QA P. Kyberd, M. Takahashi 1 Quality Assurance for SciFi Tracker (Brunel, FNAL, IC, Osaka) A status report: A procedure for ensuring the quality.
Final Tracker Connection Map Version 1 1 Connection Mapping for the Final Mice Trackers Geoff Barber November 2005 TM – 03 Jul 06 TM – 21 Jul 06.
Takashi Matsushita Imperial College T. Matsushita 1 Full tracker station assembly/QA, schedule.
Takashi Matsushita Imperial College T. Matsushita 1 Station5 in UK.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
G.Barber Mice Tracker Mechanical Progress Imperial Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment.
Fiber, Ribbon Production and Cryo Update Alan Bross Tracker Phone October 26, 2006.
MICE Tracker Update Alan Bross NFMCC Friday Meeting November 10, 2006.
G.Barber - Imperial College London - EE Workshop March EE Dee Assembly Contents:- Area Manipulator Future Plans.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
Waveguide for Station 5 M. Yoshida (Osaka Univ.).
1 SciFi Results and Comparison Malcolm Ellis, for the MICE Scintillating Fibre Group Abingdon, 31 st October 2003.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
Tracker Summary Alan Bross MICE CM October 10, 2007.
MINERvA Mini-Review Debbie Harris Jeff Nelson Kevin McFarland Jeff’s slides version 1.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
Takashi Matsushita On behalf of IC/Brunel team Imperial College T. Matsushita 1 Preparation for station five Construction/bundling/connectorisation.
Status of cosmic-ray test of the SciFi prototype and SciFi software in G4MICE M. Yoshida (Osaka Univ.)
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
DAQ Status for cosmic-ray test in RAL Hideyuki Sakamoto MICE Phone meeting 12 th July 2007 Contents Status Setup for cosmic-ray test bench Schedule.
1M. Ellis - 17th May 2007 SciFi Decoding (Everything you never wanted to know but couldn’t avoid going over and over)  VLSB Data (unpacking to AFE, MCM,
Takashi Matsushita Imperial College T. Matsushita 1 Quality Control of Station Assembly.
T. Matsushita 1 Waveguide length with 3D model Internal waveguides The shortest = 1.5 m The longest = 2.6 m Others depending on the spacing Front face.
Tracker Summary Alan Bross MICE CM17 CERN February 25, 2007.
G.Barber: Sci-Fi Mechanical Design - Tracker Meeting Cern 29 March Latest thoughts on Mechanical Design Contents:- Revised Fibre Pitch Fibre Optic.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
Final Tracker Connection Map Version 1 1 Connection Mapping for the Final Mice Trackers Geoff Barber November 2005 TM – 03 Jul 06 TM – 21 Jul 06.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Installation requirements & Procedure.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
ECE 4006B Fall, 2002, Group 1, Mei Chan Progress Report Period (November 22-December 5, 2002) Receive and complete assemble 2 nd PCB board Complete the.
T. Matsushita 1 Scintillating fibre tracker The scintillating fibre tracker reconstructs muon tracks before and after the MICE cooling section in 4 T magnetic.
Analysis for QA (temporary) Hideyuki Sakamoto 1 st October 2007 MICE Tracker Phone Meeting.
1 Light Yield results from the KEK tracker test using G4MICE M. Ellis Tracker Phone Meeting 25 th January 2006.
Transmission test for waveguide Hideyuki Sakamoto Tracker Phone Meeting, 25 th May,2006 Contents Method Measured luminosity Results and next step.
MICE Phone Meeting 26 October Status report of Waveguides for Station5 Hideyuki Sakamoto Contents Review of production process Present status Plans.
G.Barber Mice Tracker Mechanical Ral June Tracker Mechanical Update Contents:- Station Space Frame Station Layout Connectors Patch Panel Still to.
G.Barber Mice Tracker Mechanical Progress Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment of Tracker.
G.Barber: Summary of Mice Fibre Tracker Meeting FermiLab 8-12 March Developments during Tracker workshop Contents:- Revised Fibre Pitch Fibre Optic.
Status of Prototype Preparation (I) Wander Baldini On behalf of the Ferrara SuperB group SuperB Workshop, LNF Dic. 2-nd 2009.
G.Barber: Mice Collaboration Meeting 29 March Plans for Sci-Fi Prototyping. Contents:- Mechanical Layout of Sci-Fi Design of the Single Stage Design.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
20 April 2007MICE Tracker Phone Meeting1 Analysis of cosmic/self-triggerd data of station 5 Hideyuki Sakamoto MICE Tracker Phone Meeting 20 th April 2007.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
Requirements for the Software Group (and agreed actions)
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Aron Fish Imperial College Mice Video Conference 01/02/06
SCHEDULE Nov 1st - Assembly Table Complete
Decoding….
Scintillating Fiber/Clear Fiber QA and Ribbon Production
Grade one First term Second term Learning unit Learning unit
After service guide for changing PCB
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #10
Presentation transcript:

MICE Tracker workshop, 06Nov Waveguides for Station5 H. Sakamoto / M. Yoshida

MICE Tracker workshop, 06Nov G.Barber 1400 mm

MICE Tracker workshop, 06Nov External waveguide 2900  29 mm 2100mm … … … … 121

MICE Tracker workshop, 06Nov External waveguide Polished face Mirrored Numbering

MICE Tracker workshop, 06Nov Production process 1.Cut 2.Assembly with testing cookie 1.All connectors are set in fiber bundle ( including internal&external ) 2.Mapping is completed at this step. 3.Polish 4.1 st transmission test 5.Cutting testing cookie away 6.Glueing and making internal.& external. separately. 7.Polish 8.2 nd transmission test 9.Shipping to FNAL toward final polishing. -> Imperial College.

MICE Tracker workshop, 06Nov Assembling scheme D0 connector Testing cookie Elastic bands Station connector External region Internal region Table

MICE Tracker workshop, 06Nov Plans Bulkhead connectors will arrive at G-Tech at beginning of November? Assembly with test cookie (previous slide) ~1 week Transmission G-Tech factory ~1 day –Now, Takatomi is tuning the testing method at Osaka Univ. First module will complete at End of November ~1 week Production assessment test ~1 day –Check stress on fibers –Final transmission test. Complete the remaining modules ( 4 modules ) ~2 week