MICE Tracker workshop, 06Nov Waveguides for Station5 H. Sakamoto / M. Yoshida
MICE Tracker workshop, 06Nov G.Barber 1400 mm
MICE Tracker workshop, 06Nov External waveguide 2900 29 mm 2100mm … … … … 121
MICE Tracker workshop, 06Nov External waveguide Polished face Mirrored Numbering
MICE Tracker workshop, 06Nov Production process 1.Cut 2.Assembly with testing cookie 1.All connectors are set in fiber bundle ( including internal&external ) 2.Mapping is completed at this step. 3.Polish 4.1 st transmission test 5.Cutting testing cookie away 6.Glueing and making internal.& external. separately. 7.Polish 8.2 nd transmission test 9.Shipping to FNAL toward final polishing. -> Imperial College.
MICE Tracker workshop, 06Nov Assembling scheme D0 connector Testing cookie Elastic bands Station connector External region Internal region Table
MICE Tracker workshop, 06Nov Plans Bulkhead connectors will arrive at G-Tech at beginning of November? Assembly with test cookie (previous slide) ~1 week Transmission G-Tech factory ~1 day –Now, Takatomi is tuning the testing method at Osaka Univ. First module will complete at End of November ~1 week Production assessment test ~1 day –Check stress on fibers –Final transmission test. Complete the remaining modules ( 4 modules ) ~2 week