NCDA: Pickle Sorter Project Proposal Project 98.09 Sponsored by Ed Kee of Keeman Produce, Lincoln, DE.

Slides:



Advertisements
Similar presentations
Cleaning, sorting and grading of Potato
Advertisements

Automatic Dental Bur Loader NCDA Dental Products Development Group Preliminary Proposal Presentation Team 06 Project September 1998.
Northwest Natural 12” Pipeline Integrity Project Team Members Jon Ziring Zack Lemmon Long Nguyen Academic Advisor Faryar Etesami NWN Sponsor Advisors Ross.
Developing Your Business Plan
Teaching materials to accompany:
EGovernment National Science Foundation Advisory Committee for Business and Operations November 19, 2004.
Objectives Understand the importance of information to the company.
M ERCER E NGINEERING M ERCER E NGINEERING Different by Design Dr. Donald Ekong, PE
Mailer’s Technical Advisory Committee (MTAC) Task Team 2 General Session Presentation November 16, 2010.
SYSTEMS IN MANUFACTURING How does a system relate to manufacturing?
EDGE™ Concept Level Project Plan P08043 – Magnet Centering Device Aaaron Burger (Mechanical Engineer)
NCDA: Pickle Sorter Concept Review Project Sponsored by Ed Kee of Keeman Produce, Lincoln, DE.
Process Improvement for Drill Bit Blanks For MN Twist Drill The Three Orienteers Scott Anderson – Project Leader Andy Johnson – Mechanical Engineer Tony.
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
Senior Design: Tachometer Calibration Device Team 4: Jennifer Egolf, Matthew Hagon, Michael Lee, Christopher Pawson Sponsor: DuPont Advisor: Dr. Glancey.
NCDA: Pickle Sorter Final Design Review Project Sponsored by Ed Kee of Keeman Produce, Lincoln, DE.
Management Information Systems Background Definition of information systems Knowledge needed to succeed.
ME Project: Air Conditioner Lab Team: 10 Members: Sean M. Gallagher, Brian Davison, Prathana Vannarath, Pam McDowell Customer: University of Delaware Mechanical.
Senior Design: Validation of Design December 15, 2008.
NCDA: Pickle Sorter Project Proposal Project Sponsored by Ed Kee of Keeman Produce, Lincoln, DE.
Automatic Dental Bur Loader NCDA Dental Products Development Group Progress Review Team 99.06: Jason Dickey, Greg Frantz, Allison Martin, Nancy Meyer Sponsor:
Systems Engineering Management
Feasibility of Milling Gluten-Free Flours Jane DeMarchi North American Millers’ Association August 19, 2005.
Computerised Maintenance Management Systems
Sponsored by Wegmans P Automation/Improvement of Packaging on the Cookie Line Stephanie Rager Bruno Coelho.
Feasibility and Business Planning
Application of ISO/TR Integration of Environmental
Feasibility and Business Planning
Testing – A Methodology of Science and Art. Agenda To show, A global Test Process which work Like a solution Black Box for an Software Implementation.
Feasibility and Business Planning Glencoe Entrepreneurship: Building a Business Feasibility Analysis: Testing an Opportunity The Business Plan 5.1 Section.
Develop Effective Products and Services
Product Design for Manufacturability and Automation
Element 2 Promote the organization and the IT department.
ISAT 211 Mod 2-1  1997 M. Zarrugh ISAT 211 Module 2: Competitiveness and Operations Strategy  The learning objectives of this module are –To explain.
Team Assignment 15 Team 04 Class K15T2. Agenda 1. Introduction 2. Measurement process 3. GQM 4. Strength Weakness of metrics.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
BENCHMARKING For Best Practices. What is Benchmarking A method for identifying and importing best practices in order to improve performance A method for.
ISA–The Instrumentation, Systems, and Automation Society ISA SP-99 Introduction: Manufacturing and Control Systems Security -- Kickoff Meeting Call to.
McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 3 Identification and Selection of Development Projects.
Usability Tests and Reports Brian Gastle Western Carolina University.
Projects and Teamwork Set up project teams Planning a design project Project teamwork.
© Crown copyright 2006 Renewing the Frameworks Calculation - Subtraction.
Virtual Classroom Economics of Engineering Design Virginia Tech University of Massachusetts General Electric Company National Science Foundation.
Concept Selection Teaching materials to accompany: Product Design and Development Chapter 7 Karl T. Ulrich and Steven D. Eppinger 2nd Edition, Irwin McGraw-Hill,
Quality Management Managing the quality of the software process and products.
MH...CH LECT011 What is Material Handling? Materials handling is the science and art both involving the moving, packing and storing of substance.
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session #10.
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session #13.
Computerised Maintenance Management Systems
Laboratories Energy Efficiency Research Activities March, 2006.
© Prentice Hall, 2007 Excellence in Business Communication, 7eChapter Writing Reports and Proposals.
Magnetically Levitated Propeller Bernie Garcia (ME, Team Leader), Joe Bernardini (ME, Scribe), Elijah Sensenig (EE, System Integrator), Zachary Louison.
Customer Needs Increase Productivity Safety of Machine Minimize Physical Exertion Reduce Downtime Complete through cut of straws on first actuation with.
ENTREPRENEURSHIP SABIR MALIK LECTURE 07. The Marketing Plan.
AUTOMATED ROD SINGULATION SYSTEM Student: James Welch Concentration: Mechanical Class: ET-494 Spring 2015 Instructor: Dr. Cris Koutsougeras Advisors: Dr.
Open minds. Open doors. TM MIME Capstone Design Process Projects: Current State Analysis and Background Research / Benchmarking.
Mechanical & Manufacturing Engineering Program
Quality Management chapter 27.
AS/RS (Automated Storage/Retrieval System)
Chapter 1 Cost control & cost reduction
Honeywell Powder Amplifier ME476C
Product Specifications
Robotic Needle End Arm Effector for Integration With CT Scan
Term # Term.
Software Requirements Specification (SRS) Template.
Fertilizer Industry Safety Information Analysis and Sharing Program
Introduction to Project Management
ESI 4554 ISE Systems Design Fall 2003
Presentation transcript:

NCDA: Pickle Sorter Project Proposal Project Sponsored by Ed Kee of Keeman Produce, Lincoln, DE

2 Project Background Title: Pickle Sorter Sponsor: Ed Kee of Keeman Produce Problem: The pickling cucumber industry currently separates undesirable cucumbers from desirable ones in an inefficient manner (manually). Mr. Kee would like a device to efficiently and reliably separate the usable cucumbers from the unusable ones.

Schematic

4 Size Catagories 1A: inch diameter 1B: inch diameter 2A: inch diameter 2B: inch diameter 3A: inch diameter 3B: inch diameter Oversize: > 2.0 inch diameter

5 Undesirable Cucumbers 3 Catagories: –Oversized (Diameter > 2 in.) –Relish (Broken) –Cul (Crooks and Nubs) Constitutes 18.4% (average) of Total Crop –Oversized: 3.8% –Relish: 7.8 % –Cul 6.8 %

6 Definition of Cul USDA specification (1936): “...materially curved, materially tapered more than normal at one or both ends, or otherwise materially misshapen for pickling purposes.”

7 Mission Statement To provide an integrated, automated system to sort out undesirable pickles on the processing line.

8 Customers

9 SSD ©

10 Metrics Harvest Season: 80 days (Endurance / Reliability Metric) Approximate cost of Sorting Labor per plant each season: $185,000 (Our total cost of operation must improve on this cost) % of Harvest needing removal: 16-25% –Between 5% and 9% of Total is Cul

11 Metrics (continued) Operating speeds of conveyor system: –100 ft/min at primary intake area –50 ft/min at secondary sorting area –~2000 Bushels/hr = ~400,000 Pickles/hr Effectiveness Goal: –80% accurate removal of crooks and nubs –No more than 5% usable cucumbers removed

12 Approach Method Location of sorting mechanism: –In cannery as opposed to a Harvester-mounted system Speculation as to approach: –Imaging-software driven –Desirable to integrate with current conveyor system

13 Benchmarking State of the Art: No economical, efficient System currently exists for removing Cul from a Cucumber harvest. Strategy: Research methods of conveyance, shape identification, imaging, and other related concepts that could be used in an efficient, economical system. Also: Judge the feasibility of adapting an existing Potato sorter to our purposes.

15 Current Progress Meetings with the customer –Teleconferencing and in person Brainstorming Information Gathering –Specific to our customer wants/constraints/etc. Benchmarking Following SSD © procedures Preparing Project Proposal

16 What’s Next Planning a visit to Vlasic’s packaging site Gathering more information from manufacturers of similar systems for other types of produce Mathematical definition of ‘Good’ and ‘Bad’ cucumbers Continued regular Team meetings