GLAST LAT ProjectLAT Face to Face, July 17-18, 2003 1 GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.
Advertisements

DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science OECM Limited-External Independent.
GLAST LAT ProjectMonthly Status Meeting Jan 26, Project Status January 26, 2006 Gamma-ray Large Area Space Telescope Lowell A. Klaisner Project.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectLAT F2F Mgrs Meeting November 17, Tanya Boysen LAT Project Controls Manager WBS Instrument Management.
GLAST LAT ProjectMonthly Status Meeting, June 30, Cost/Schedule Reports for 4.1 LAT Presentation Presentation May 2005 Month End Gamma-ray Large.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE Rebaseline Review, February 13, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Chief Engineer.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby1 Martin Nordby Stanford Linear Accelerator Center Stanford University.
GLAST LAT ProjectEngineering Meeting, April 1, GLAST Large Area Telescope Engineering Meeting Quality Assurance And Manufacturing Preparations April.
GLAST LAT ProjectEngineering Meeting, December 3, GLAST Large Area Telescope: Engineering Meeting December 10, 2002 Lowell A. Klaisner Stanford.
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
111/3/2004 GLAST LAT ProjectLAT Engineering Meeting LAT Face to Face Manager’ Meeting Nov. 3, 2004 LAT Level Design Status LAT Face to Face Manager’ Meeting.
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT Project18 July GLAST Large Area Telescope: NCR 529 Systems Engineering R. Bright Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectNovember 17, 2004 AntiCoincidnce Detector 1 GLAST Large Area Telescope: Face to Face Meeting November 17, 2004 AntiCoincidence Detector.
GLAST Large Area Telescope:
GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 1 GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 1 Introduction & Science Overview 1 GLAST Large Area Telescope: Introduction.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
National Aeronautics and Space Administration November 23, Gamma-ray Large Area Space Telescope (GLAST) Kevin Grady, Project Manager Steven Ritz,
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
GLAST LAT ProjectApril 2005 Project Status Overview May 24, April, 2005 Lowell Klaisner LAT Project Manager Rev. - LAT Project Status Overview Gamma-ray.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
GLAST LAT ProjectI&T&C Pre PDR Presentation – Oct 2, 2001 B. Grist1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT Project IA Workshop 4 July 14, 2005 E. do Couto e Silva 1/7 Introduction to the Instrument Analysis Workshop 4 Eduardo do Couto e Silva July.
GLAST LAT Project CAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 PREP For CDR - April Schedule Wall Walk GSFC Chart Flip (Select) Post.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
Reported by Ron Prwivo for Ian Robson. Overview Response to Recommendations from the RLSR of November 2014 – very good, RF staffing remains an issue Very.
GLAST Large Area Telescope:
I&T&C Organization Chart
Mechanical Integration
0.0 Instrument Suite Name Presenter’s name
GLAST Large Area Telescope:
Integration, Test, and Calibration
GLAST Large Area Telescope:
GLAST Large Area Telescope Instrument Science Operations Center
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
Large Area Telescope Project
Lessons Learned and Earned Value Management System Assessment
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Integration and Test Organization Chart
March ’05 Face to Face Meeting Introduction
Introduction and Overview
GLAST Large Area Telescope:
Overview Cost to Complete
Integration & Test Instrument Operations Coordination
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectLAT Face to Face, July 17-18, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope LAT Face to Face July 17-18, 2003

GLAST LAT ProjectLAT Face to Face, July 17-18, Outline for this meeting Report on the JOG meeting and the rebaselining process Get input on how we can be more effective in executing the project Review the Strawman schedule –Identify conflicts –Identify plan to closure (by DOE review 7/31) Initial discussions of how to meet the funding profile Subsystem milestones for the next 3 months Interdependencies –TEM & TEMPS integration with CAL modules –DAQ EGSE for subsystem testing Subsystem reports Business –Combining monthly meetings –Improving communications Capture Action Items

GLAST LAT ProjectLAT Face to Face, July 17-18, Overview Motivation for reviewing cost and schedule –CNES in France deciding to not fund LAT work –Completion of CDR/CD-3 Design has reached a level of maturity Construction of flight hardware beginning Outcome –LAT program needs an additional $17.2 M –Fabrication Phase needs an additional $11.8 M –Operating and commissioning needs an additional $5.5 M Primary open issue is the time phasing of the available funds –Additional needs for the fabrication phase in FY04 = $7.6 M –Additional funding for the fabrication phase in FY04 NASA $3.0 million DOE $0.0 million

GLAST LAT ProjectLAT Face to Face, July 17-18, Additional Costs to GLAST Mission All values in millions of dollars

GLAST LAT ProjectLAT Face to Face, July 17-18, Costs that are not fabrication costs Note: These reductions represent an equivalent increase commission/operating costs

GLAST LAT ProjectLAT Face to Face, July 17-18, Definition of CD-4

GLAST LAT ProjectLAT Face to Face, July 17-18, Definition of the IOC

GLAST LAT ProjectLAT Face to Face, July 17-18, Net Change to the Fabrication Phase

GLAST LAT ProjectLAT Face to Face, July 17-18, Funding Guidance

GLAST LAT ProjectLAT Face to Face, July 17-18, Total Fabrication Phase Cost and Funding Note: with the $4.6M shortfall in FY04 the available contingency is $2.5M or 8%

GLAST LAT ProjectLAT Face to Face, July 17-18, Stanford University Loan Stanford University is willing to loan the project $700K to bridge from FY 04 into FY 03 –The need for additional funds in FY 03 has decreased The mission office at Goddard has helped with ’03 The proposed change to IOC funding reduces FY 03 fabrication phase costs by $200K This loan would only make the FY 04 cash flow problem worse The project proposes to not exercise this loan in FY 03 –It may be possible to negotiate as similar loan for ~$1 million to bridge from FY 05 into FY 04

GLAST LAT ProjectLAT Face to Face, July 17-18, Descope Options to Preserve Schedule  Previously moved beam test from before I&T to Comm. Phase o Tier 1  Reprogram I&T prep and assembly of first towers  Reprogram calibration modules for beam testing to be last modules fabricated – add 2 weeks float  Move environmental testing to Spectrum Astro o Tier 2  Build 16 modules, Fly 14 (Baseline -- Build 18 modules, Fly 16)  Science impact: degradation of A eff and FOV o Tier 3  Build 14 modules, Fly 12  Science impact: Significant degradation of A eff and FOV (below level-1 requirements) LAT and Mission designs are highly optimized. All identified descopes that are effective are also painful. Most options address potential schedule slips.

GLAST LAT ProjectLAT Face to Face, July 17-18, Summary Project is starting fabrication of flight hardware –Completed the CD-3/CDR The instrument design is mature A review of cost and schedule indicates that the project needs $17.2M increase in funding to have adequate cost contingency Also the project needs an additional 3 months of schedule to have adequate schedule contingency Define CD-4 as the successful completion of the pre-test review –The Fabrication Phase needs a $11.7M increase –CD-4 date is unchanged Some reorganization of the LAT to better address this next phase Increased participation by the NASA, DOE and Laboratory management to assure resources are available The open issue is the time phasing of the funding –Funding needs to be moved from FY05 to FY04 OR –The work needs to be reprogrammed to move activities from FY04 to FY05 With a $1 M loan from SU, $3.6 M of work needs to move DOE Rebaseline review on July 31, 2003

GLAST LAT ProjectLAT Face to Face, July 17-18, Feedback Get input on how we can be more effective in executing the project

GLAST LAT ProjectLAT Face to Face, July 17-18, LAT Working Schedule LAT RFI 12/1/05 Environmental Testing 15 wk System Test 16 wk 4 wk FLOAT Install Tower A 8 wk Install Towers 13/14 2 wk Install Global items 6wk Install Towers B, wk LAT ASSEMBLY Available: TKR A/B 4/15 /04 CAL A/B 5/20/04 Available: TKR 13/14 10/28/04 CAL 13/14 10/21/04 Available: ACD 9/21/04 Elex 9/10/04 X-LAT 8/2/04 Critical Path 8 wk FLOAT 12 wk FLOAT Ship LAT 1 wk Prep GRID 3 wk Available: GRID 4/29 /04 12/23/0411/11/0410/28/045/20/0411/3/057/21/054/21/05 Complete CAL wk 7/1/04 4 wk float 714/05 CD-4 CommissionFabrication

GLAST LAT ProjectLAT Face to Face, July 17-18, Remainder of the meeting Initial discussions of how to meet the funding profile Subsystem milestones for the next 3 months Interdependencies –TEM & TEMPS integration with CAL modules –DAQ EGSE for subsystem testing Subsystem reports Business –Combining monthly meetings –Improving communications Capture Action Items