10.7.2007TRD ROC Status Clemens Adler TRD Status Meeting 10.7.07 TRD ROC Status.

Slides:



Advertisements
Similar presentations
Module production at Heidelberg Responsibilities: assembly and test of 60 F- modules (5 m) September 28: Series module # 12 finished  20% reached Full.
Advertisements

TRD Production at GSI Joerg Hehner TRD Collaboration Meeting Bucharest
TRD Collaboration Meeting GSI Clemens Adler TRD Chamber production issues General Issues, Planning and Hd Status.
TRD Status meeting Münster Clemens Adler TRD ROC Status The long and winding road to production start.
TRD August 2007 A. Marín (GSI) 6/11/2015 STATUS TRD COOLING TRD STATUS MEETING August 2007 STATUS TRD COOLING TRD STATUS MEETING August 2007.
1. Common Optics Assembly (COA) Main optics housing riveted on channel housing (with rod) QM delivered
TRD status meeting GSI Clemens Adler TRD (Pre-)Production Status New Results/Experiences Problematic issues Production Plans Timescale.
Hd Status and Planning TRD Chamber Construction Meeting Clemens Adler.
/06/2015 Christian J. Schmidt GSI Production of ALICE TRDs Progress and Quality Development Alice TRD Chamber Production Meeting Darmstadt Feb.
TRD Status Meeting Münster Clemens Adler TRD ROC Status Status Meeting Münster
TRD Collaboration meeting GSIClemens Adler First TRD Production Chambers Production Tests Results Documentation.
Chamber production status 75% of production (of 1st half of detector) reached in May Currently ~80% is produced 100% (1st half) expected in October. End.
TRD Collaboration meeting GSIClemens Adler TRD Production in Heidelberg Manpower/Resources/ Timescales.
TRD Status meetingClemens Adler TRD Production Status -Material -Tooling -Timescale.
TRD Status meeting GSI Clemens Adler TRD ROC Status.
TRD Status meeting IKFClemens Adler TRD ROC Status -Dubna -Bukarest -GSI -Frankfurt -Heidelberg.
8.7.04TRD Status meeting HdClemens Adler TRD ROC Status.
TRD Collaboration meeting GSIClemens Adler First Production Chambers Production/tests/results.
Technical Forum Alice week Clemens Adler Transition Radiation Detector Status Participating Institutions: Athens University, NIPNE Bukarest, JINR.
TRD Status meeting HeidelbergClemens Adler Chamber production Production status/ Material status.
TRD Status meeting GSIClemens Adler Chamber production Production status/ Material status.
TRD Status meeting Alice week HdClemens Adler TRD Chamber Status News: New leak rate measurements Production is imminent Some material arrived Soldering.
Production NIPNE Completely finished and tested: L1C sent to GSI L2C sent to GSI L2C sent to GSI L3C Total: 36 =
Engineering Design Review for TRD-Readout Chamber
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
Mary-Cruz Fouz CIEMAT-Madrid Muon Week Bologna Apr03 Madrid Status Report.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
WA104 Aluminum Cold Vessels A possible scenario. CAVEAT Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions.
1 A.Andronic 1, H.Appelshäuser 1, V.Babkin 2, P.Braun-Munzinger 1, S.Chernenko 2, D.Emschernmann 3, C.Garabatos 1, V.Golovatyuk 2, J.Hehner 1, M.Hoppe.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Status of GEM T2 assembly Outline Status of the GEM components Summary Tests TOTEM Collaboration meeting CERN / Risto Orava for Kari Kurvinen.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 23 May 2012 Notes on A8 transport 2 ShockLog malfunction: fresh batteries consumed.
G. PassalevaRoma - July 28, 2004 Status of MWPC production site in Florence G. Passaleva.
JINR-BMBF Workshop, Dubna Clemens Adler PI Heidelberg ALICE TRD Transition Radiation Detector Overview and Status Clemens Adler Physikalisches.
15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania1 EMCAL CATANIA A. Palmeri - F. Noto.
M. Bonesini - MICE Inst Meeting M. Bonesini INFN Milano TOF installation plans.
Status of the Crystal Ball A.Starostin UCLA. Tasks in preparation for the polarized target experiments CB and the “cube” will be movable on rails – all.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 12 Jul 2011 LAV construction status: a snapshot 2 A1 Arrived at CERN 29 Jun.
Update on FMS Repair STAR Management Meeting: Oct Stephen Trentalange.
Last collaboration meeting B. Plaster nEDM February 2008 Collaboration Meeting Attention now focused on construction of a 1/2-scale prototype modified.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
TRD Workshop RomaniaClemens Adler Heidelberg ROC Status Material procurement, Chamber Status TRD workshop Cheile Grandistei, Romania,
CMS Upgrade Workshop, FNAL, Nov 19-21, O.Prokofiev CMS Upgrade Workshop Updated ME4/2 chamber construction costs and prototype Status and plans.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
ALICE SSD 20 May Yalta G-J Nooren ALICE SSD status.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
Status of production at LNF E.Dane’ and C. Forti – Meeting with LHCb referees Firenze 14-mar-05 Christmas 3 ch/week Ch. 43.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
EMCal Meeting Nantes – July J-F Muraz  Grenoble Status  Assembly and test Hall.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.
Masahiro Konno for the Aerogel groupDC Meeting, Apr/14/04 1 Status of Aerogel Reconstruction –Track association implemented in CGL. –Raw data (ADC, TDC)
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
Gluing jigs for Demonstrator
G. Carboni for the Muon Group
TripleSpec 4 Status and Coming Steps
Preparations for test of
Heidelberg Module Production
Presentation transcript:

TRD ROC Status Clemens Adler TRD Status Meeting TRD ROC Status

TRD ROC Status Clemens Adler Panels ROB Positioning holes at wrong position –Delivered Panels: redrill with provided template –Other panels: rework at FACC Signal cable cutouts too small on some panels –Rework at FACC (if possible)

TRD ROC Status Clemens Adler Padplane problem in Dubna 3 L1C0 Padplanes (type 1) were cut badly by Optiprint. Not noticed at delivery David in Contact with Optiprint

TRD ROC Status Clemens Adler Material delivery status Panels: –FACC delayed: Delivery of last panels shifted by 4-5 weeks (August) -> no issue. Glue+Wires: –Christian+Jörg assembling needs for the rest of production.

TRD ROC Status Clemens Adler Profile production Front profiles: –One workshop out of the game (machine broken, until ~November) –Production will barely satisfy chamber construction needs. –~250 pc to be done (until ~Feb. 2008) L-profiles: – still ~160 pc. to do (~4 month)

TRD ROC Status Clemens Adler Production Status Status BucharestDubnaFrankfurtGSIHeidelbergSum wired frames Taped tested taped314 glued (tests not completed)1135 tested glued to be repaired 4 4 Sum 357 Rates (wiring) over last ~2 month: Frankfurt: ~0,7 ch/week Heidelberg ~0,7 ch/week (1/week over last 4 weeks, due to additional manpower ) GSI: ~2 ch./week Bucharest/Dubna: Material transport limited

TRD ROC Status Clemens Adler Production planning Distribution of 44 ‘homeless’ chambers: –Dubna will most likely take over 22 chambers (L2C1). (Technical details to be discussed). –Bucharest will most likely take over 22 chambers (L3C1). (Technical details to be discussed).

TRD ROC Status Clemens Adler ROC Production planning (March, 30th 2007) Status (3/2007) Finished chambers to be done Total: Bucharest: Dubna: Frankfurt: GSI: Heidelberg: Production rates (historical average): Bucharest: 1 ch/week Dubna:1 ch/week Frankfurt:0.7 ch/week GSI:1.2 ch./week Heidelberg0.5 ch/week Further Production ): Type: # to be done Lab # prod at Lab LxC0: 14 Dubnaall L0C1: 44 Frankfurtall L1C1:46Heidelbergall L2C1:42Bucharest20 L3C142Bucharest20 L4C139GSIall L5C139GSIall Timescale estimate: (assuming 4 weeks Summer vacation, 2 weeks Christmas vacation) LabDuration (weeks)End of prod Bucharest:413/ 2008 Frankfurt:637-8/ 2008 GSI:657-8/ 2008 Heidelberg922/ chambers which are not included, leading to additional ~44 production weeks.