GLAST LAT ProjectMonthly Review, September 1, 2005 4.1.4 Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S 4.1.4 August Status Meeting.

Slides:



Advertisements
Similar presentations
Tracker Subsystem1 GLAST LAT Project FM15 PSR, Oct. 14, 2005 GLAST LAT Tracker Tower15 Pre-Ship Review INFN-Pisa.
Advertisements

Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectMonthly Review, Aug-1, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectPeer Review, March 24-25, D 1 Gamma-ray Large Area Space Telescope 7D: Tray test plans GLAST Large Area Telescope: GLAST Large Area.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Tracker Test Plan Overview.
GLAST LAT ProjectF-to-F, March, TrackerR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face March Meeting Robert Johnson.
Tracker Subsystem1 GLAST LAT Project FM16 PSR, Nov. 4, 2005 GLAST LAT Tracker Tower16 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectMonthly Status Meeting, June 30, Cost/Schedule Reports for 4.1 LAT Presentation Presentation May 2005 Month End Gamma-ray Large.
GLAST LAT ProjectOctober 14, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Engineering Meeting Tracker Engineering-Model.
GLAST LAT Project TKR Tower 4 and 5 hand-off review – June 8,2005 Hiro Tajima, TKR Tower 4 and 5 hand-ff review 1 GLAST Large Area Telescope: TKR Hand-off.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
Tracker Subsystem1 GLAST LAT Project FM7/9 PSR, Sept. 9, 2005 GLAST LAT Tracker Tower7/9 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectMonthly Status Review – Sept. 1, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
Tracker Subsystem1 GLAST LAT Project FM4/5 PSR, May 31, 2005 GLAST LAT Tracker Tower-4/5 Pre-Ship Review INFN-Pisa.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
November 17, 2004Tracker1 Tracker November System Manager Meeting R.P. Johnson U.C. Santa Cruz.
GLAST LAT Silicon Tracker Marcus ZieglerIEEE The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus Ziegler.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
Tracker Subsystem1 GLAST LAT Project FM-B PSR, 10 Feb, 2005 GLAST LAT Tracker Tower-B Pre-Ship Review Luca Latronico INFN-Pisa
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT Project18 July GLAST Large Area Telescope: NCR 529 Systems Engineering R. Bright Gamma-ray Large Area Space Telescope.
Tracker Subsystem1 GLAST LAT Project FM6 PSR, July 21, 2005 GLAST LAT Tracker Tower6 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectLadder wirebonds break - MRB 03 Dec 2004 L. Latronico1 Ladder Wirebonds break MRB Meeting – 3 december 2004.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 GLAST Large Area Telescope: Tracker Subsystem MCM Production Readiness.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Robert P. Johnson 1 GLAST Large Area Telescope: Silicon-Strip Tracker/Converter.
1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.
GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS D: Composite Panel Fabrication.
Tracker Production Overview Readout Cables UCSC, SLAC (Parlex) SSD Procurement, Testing SLAC,Japan, Italy (HPK) Electronics Fabrication, burn-in, & Test.
SSD Status Report July SSD Status Report accessible from STAR group documents Pictures Updated documentation.
GLAST LAT ProjectMonthly Review, November 3, 2004 Tracker SubsystemP. S. Drell 1 GLAST Large Area Telescope: Tracker Subsystem WBS Persis S. Drell.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Ladder Fabrication A. Brez.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Schedule Summary; Critical.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
GLAST LAT ProjectMarch 24, G Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS G: Tower module assembly A.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectMarch 24, H Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS H: Tower Shipping and Storage.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: Tray assembly A. Brez I.N.F.N.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectMonthly Status Review – Nov 3, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Electronic Parts & Materials.
GLAST LAT ProjectQuarterly Review, November 12, 2002 LAT-PR GLAST Large Area Telescope: Tracker Subsystem Robert Johnson Santa Cruz Institute for.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
Cable MRB July 13, 2005 R.P. Johnson. July 13, 2005R.P. Johnson2 Cable Status Needed in Italy to support Tower 8,9 Environmental Testing July 19.
Gamma-ray Large Area Space Telescope Tower 1 TVAC tests Bad ladders issues.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Parts and Materials Procurement.
GLAST LAT ProjectMRB 09/14/2005 L. Latronico1 Tower 14 – Layer Y0 malfunction MRB Meeting – 14 September 2005.
Tracker Timing Margin MRB R.P. Johnson U.C. Santa Cruz October 15, 2004.
GLAST LAT ProjectMonthly Review, Sept 27, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST Large Area Telescope:
Tower 8 – X6 anomaly MRB Meeting – 24 August 2005.
Mini-Tower test results
GLAST Large Area Telescope:
We have no new trays for tower 4!!
Investigation on tray MID 063 Back
7E: Tower test plans GLAST Large Area Telescope: Tracker Subsystem
GLAST Large Area Telescope:
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
Presentation transcript:

GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting Robert Johnson Gamma-ray Large Area Space Telescope

GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 2 Flight-Tower Assembly Status Tray Panel status: –All flight tray panels are completed –About half of the tray panels for the 17 th tower were also delivered before Plyform went on holiday. The rest are close to completion. –All bottom trays for 18 towers have been delivered. Sidewall status –Completed for 17 towers MCM status: –Production is stopped. –Flight quality MCMs delivered for 17+ towers –The 18 th tower will have to include non-flight (NCR) MCMs but will be only slightly less efficient than the flight towers. Tray and tower assembly status: –All 16 flight towers have been assembled –However, some flight cables are still missing (next slide)

GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 3 Tracker Flight-Tower Status TowerAssemblyVibeT/VStatus A,B,1-6  Integrated into the Grid 7  Needs a C6 cable installed, then ship 8  11Replace 1 noisy tray, install 3 cables, and repeat both vibe and T/V testing 9  Replace 3 cables and ship 10  At Alenia ready for vibe; replace 3 cables 11  In T/V testing; needs 2 cables replaced 12  Add 1 flight cable after env. testing 13  In T/V testing; needs 2 cables added 14  Has all 8 flight cables; in vibration testing

GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 4 Tower 7 and 8 Rework Each of these two towers had one tray with high noise on one side when at elevated temperature. –Both trays were originally in “Tower-0”, so they were two of the first trays built. –They differ from following trays primarily in that the wire bonds from MCM to SSDs and bias circuit are encapsulated with silicone. The encapsulation was removed from the process because it was catastrophic for heavy trays (hundreds of wire bonds failed during thermal cycles). The problem with the thin-converter mid trays is subtle and was not realized until the towers went into T/V testing. The symptoms are consistent with intermittent connection of the bias current to the SSD ladders, but up to now direct measurements of the bias current have not confirmed this. Some more tests are in progress on the Tower-7 tray.

GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 5 Tower 7 and 8 Rework The bad tray in Tower 7 was replaced, and the tower has by now completed a second round of environmental testing. –It should be ready to ship next week after installing a C6 cable. The bad tray in Tower 8 will (probably) be replaced in the next week. If so, the tower will go back into environmental testing after installation of the remaining flight cables. –This will therefore be the last flight tower to be shipped. –We are hoping to test Tower-15 in parallel with it, in order to have a true flight spare tower. Note that two towers already installed in the Grid each have a single Tower-0 tray. –In those cases, however, they are a top tray and bottom tray, which differ greatly from mid trays in terms of mechanical/thermal response. –They showed no problems, even in T/V testing. –If they should develop the same problem in the future, the performance impact would be slight, and the trigger would be unaffected.

GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 6 Tracker Flex-Circuit Cable Status I expect to have all of the flight cables by the end of next week. The cables needed to complete Towers 8, 9, 10 should be carried to Italy this weekend. Parlex projects 9 additional cables (not shown here) by the end of next week, but they will almost certainly be a week later, at least. Still, they may provide the C3 and C5 cables for Tower 15.

GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 7 Tracker Environmental Testing Schedule

GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 8 Estimated Tower Ship Dates Tower 7September 9 Tower 8September 9 if we don’t replace a tray. End of September if we do. Tower 9September 9 Tower 10September 14 Tower 11September 23 Tower 12September 23 Tower 13September 23 Tower 14September 16

GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 9 Cost/Schedule Reports for Tracker Presentation July 2005 Month End Gamma-ray Large Area Space Telescope

GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 10 Level 3 Milestone Count

GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 11 Level 3 Milestone List

GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 12 Cost Report

GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 13 FTE Report (DOE/NASA-funded only)