By Dr. Sadi A. Assaf, Dr. Abdul Mohsin Al-Hammad, Dr. M. Osama Jannadi, Mr. Sami Abu Saad By Dr. Sadi A. Assaf, Dr. Abdul Mohsin Al-Hammad, Dr. M. Osama.

Slides:



Advertisements
Similar presentations
FACTORS AFFECTING CONSTRUCTION COSTS IN SAUDI ARABIA By Yaser Abdulla Al-Juwairah Presented by Shaikh Imran Abdul Qayyum Gani.
Advertisements

LCC YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT.
Capital Budgeting.
PRESENTATION FINANCIAL LITERACY PROGRAMS and MINORITY INVOLVEMENT BY: TORELL T. PERNELL CHICAGO STATE UNIVERSITY.
KING FAHD UNIVERSITY OF PETROLEUM & MINERALS COLLEGE OF ENVIROMENTAL DESGIN CONSTRUCTION ENGINEERING & MANAGEMENT DEPARTMENT Summarized by: SALMAN AL-ZAHRANI.
26-1 C APITAL B UDGETING LONG-RANGE PLANNING CHAPTER 26.
Capital Investment Analysis
1.Explain the nature and importance of capital investment analysis. 2.Evaluate capital investment proposals, using the following methods: average rate.
ICS 442 Software Project Management
INVESTMENT APPRAISAL NON DISCOUNTING By Lucky Yona.
PRIME MINISTRY REPUBLIC OF TURKEY TURKISH STATISTICAL INSTITUTE TurkStat NATIONAL ACCOUNTS IN TURKEY 1 TurkStat.
© 2009 Pearson Prentice Hall. All rights reserved. Capital Budgeting and Cost Analysis.
EE535: Renewable Energy: Systems, Technology & Economics
CHAPTER 21 Capital Budgeting and Cost Analysis To accompany Cost Accounting 12e, by Horngren/Datar/Foster. Copyright © 2006 by Pearson Education.
Chap 1-1 Chapter 1 Why Study Statistics? EF 507 QUANTITATIVE METHODS FOR ECONOMICS AND FINANCE FALL 2008.
Life Cycle Cost Analysis
1 FACTORS AFFECTING FACILITY MAINTENANCE MANAGEMENT AUDTING IN SAUDI ARABIA BY Al-Hammad,A. and AL-Zahrani A., College of Environmental Design, King Fahd.
KING FAHD UNIVERSITY OF PETROLEUM & MINERALS DHAHRAN SAUDI ARABIA DEPARTMENT OF ARCHITECTURAL ENGINEERING ARE 520: Advanced Construction and Maintenance.
VI-Economic Evaluation of Facility Investments 1. Project Life Cycle and Economic Feasibility 2.Basic Concepts of Economic Evaluation 3.Costs and Benefits.
Highway Robbery? A financial analysis of Design Build Finance and Operate in roads in the UK Jean Shaoul, Anne Stafford and Pam Stapleton University of.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Cost Implications of Architectural Design Variables Ahmed S. Al Zahrani December 2005 King Fahd University of Petroleum & Minerals Department of Construction.
KING FAHD UNIVERSITY OF PETROLEUM & MINERALS COLLEDGE OF GRADUATE STUDIES CONSTRUCTION ENGINEERING AND MANAGEMENT For Dr. Sadi A. Assaf A Conceptual Model.
Factors affecting contractors’ risk attitudes in construction projects: Case study from China 박병권.
AEC 422 Fall 2014 Unit 2 Financial Decision Making.
Portfolio Management Grenoble Ecole de Management.
4 C H A P T E R Capital Investment Decisions.
FOOD ENGINEERING DESIGN AND ECONOMICS
Naval Postgraduate School Time Value of Money Discounted Cash Flow Techniques Source: Raymond P. Lutz, “Discounted Cash Flow Techniques,” Handbook of Industrial.
Introduction ► This slide deck provides a suggested framework for the financial evaluation of an investment project. When evaluating any such project,
Summer Time Value of Money Session 2 07/02/2015.
Copyright ©2004 Pearson Education, Inc. All rights reserved. Chapter 3 Applying Time Value Concepts.
Engineering Economy Practice Problems for Exam 5 By Douglas Rittmann, Ph.D., P.E.
University of Sunderland CIFM02 Unit 3 COMM02 Project Evaluation Unit 3.
4/21/2017 Evaluation Of Performance Measures For Materials Management Process In Industrial Construction Projects Term Project for CEM 520 Instructor:
Long-Term (Capital Investment) Decisions
KING FAHD UNIVERSITY OF PETROLEUM & MINERALS DHAHRAN, SAUDI ARABIA ARE-512 Life Cycle Costing – Cost Data Bank For By G. C. SOFAT S.K. TYAGI Presented.
1 ECGD3110 Systems Engineering & Economy. 2 Lecture 1 Introduction to Engineering Economics.
1 MAINTENANCE EFFICIENCY THROUGH DIRECT LABOR OR MAINTENANCE CONTRACTS BY Al-Hammad, A., and Al-Otaibi, G. College of Environmental Design King Fahd University.
Chapter McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. The Capital Budgeting Decision 12.
Life Cycle Cost Analysis for Bridges In Search of Better Investment and Engineering Decisions.
Capital Budgeting The Capital Budgeting Decision Time Value of Money Methods of Capital Project Evaluation Cash Flows Capital Rationing The Value of a.
Setting Your Fees Project Cost and Setting Your Fees.
1 ECGD4214 Systems Engineering & Economy. 2 Lecture 1 Part 1 Introduction to Engineering Economics.
0 CHAPTER 10 Long-Term (Capital Investment) Decisions © 2009 Cengage Learning.
Input Demand: The Capital Market and the Investment Decision
Financial Management Back to Table of Contents. Financial Management 2 Chapter 21 Financial Management Analyzing Your Finances Managing Your Finances.
Chapter 8 Long-Term (Capital Investment) Decisions.
T HE DEBT OF THE LOCAL GOVERNMENT UNITS IN P OLAND T HE DEBT OF THE LOCAL GOVERNMENT UNITS IN P OLAND Iwona Zyman, Director of the Regional Branch in Opole.
1 Developed by U.S. Environmental Protection Agency (U.S. EPA) January 2014 Setting up a Sustainable National GHG Inventory Management System.
APPRAISAL ACTIVITIES 1. COLLECTION OF PERTINENT DATA. 2. INSPECTION OF THE SUBJECT PROPERTY, COMPARABLE SALES, THE AREA AND NEIGHBORHOOD. 3. ORGANIZATION.
Capital, Investment, and DepreciationCapitalInvestment and DepreciationThe Capital MarketCapital Income: Interest and ProfitsFinancial Markets in ActionCapital.
Goals-Based Investing: Integrating Traditional and Behavioral Finance Jakub Karnowski, CFA Portfolio Management for Financial Advisers.
Financial Management Glencoe Entrepreneurship: Building a Business Analyzing Your Finances Managing Your Finances 21.1 Section 21.2 Section 21.
©2006 Dr. Howard Godfrey – Extra File for Chapter 11 1 Chapter 11- B Extra PowerPoint Slides This file contains explanations of compound interest computations.
1 Overview of Economic Statistics in Africa UNECA Andry Andriantseheno Regional Workshop on Basic Economic Statistics Addis-Ababa October 2007.
Copyright © Houghton Mifflin Company. All rights reserved.1 Financial & Managerial Accounting 2002e Belverd E. Needles, Jr. Marian Powers Susan Crosson.
ALI SALMAN1 LECTURE - 05 ASST PROF. ENGR ALI SALMAN ceme.nust.edu.pk DEPARTMENT OF ENGINEERING MANAGEMENT COLLEGE OF E & ME, NUST DEPARTMENT.
Hypothesis Testing Involving One Population Chapter 11.4, 11.5, 11.2.
© John Wiley & Sons, 2011 Chapter 12: Strategic Investment Decisions Eldenburg & Wolcott’s Cost Management, 2eSlide # 1 Cost Management Measuring, Monitoring,
1 Engineering Economics Engineering Economy It deals with the concepts and techniques of analysis useful in evaluating the worth of systems,
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin BNFO 621: Business and Entrepreneurship : ACCOUNTING Roxanne M. Spindle Associate Professor.
Capital Budgeting and Cost Analysis
Capital Budgeting and Cost Analysis
Capital Budgeting and Cost Analysis
Long-Term (Capital Investment) Decisions
Other Long-Run Decisions
Managerial Accounting 2002e
The GEF Public Involvement Policy
Presentation transcript:

By Dr. Sadi A. Assaf, Dr. Abdul Mohsin Al-Hammad, Dr. M. Osama Jannadi, Mr. Sami Abu Saad By Dr. Sadi A. Assaf, Dr. Abdul Mohsin Al-Hammad, Dr. M. Osama Jannadi, Mr. Sami Abu Saad Assessment of the Problems of Application of Life Cycle Costing in Construction Projects in Saudi Arabia College of Environmental Design, King Fahd University of Petroleum & Minerals, Dhahran, Saudi Arabia College of Environmental Design, King Fahd University of Petroleum & Minerals, Dhahran, Saudi Arabia

IntroductionIntroduction Objectives of the StudyObjectives of the Study MethodologyMethodology Problems of ApplicationsProblems of Applications Results of the StudyResults of the Study Other ProblemsOther Problems ConclusionsConclusions IntroductionIntroduction Objectives of the StudyObjectives of the Study MethodologyMethodology Problems of ApplicationsProblems of Applications Results of the StudyResults of the Study Other ProblemsOther Problems ConclusionsConclusions CONTENTS

Life Cycle Costing Concept OIn the past, economic assessment of alternative designs, construction, or other investment has been based on initial (first cost which ignores the total cost incurred for the investment throughout its lifetime. OThe concept of life cycle costing provides an economic tool which takes into account total costs for an invest- ment during its life span. 1.INTRODUCTION

OThe life cycle costing can be defined as follows: an economic assessment of alternatives designs, construction, or other investment considering all significant costs of initial costs and ownership costs over economic life of each alternative, expressed in equivalent economic units. OThe life cycle costing analysis can not be carried out without considering the following: A -total costs B -concept of the time value of money 1.INTRODUCTION (Continued)

A -Total Costs Oinitial costs Oownership costs OInitial costs. They include the followings: -initial construction costs -design costs -land costs -finance costs OOwner costs. They include the followings: -operating costs omaintenance costs outility bills ostaffing fee 1.INTRODUCTION (Continued)

B -The concept of the time value of money oThe value of money today is not equal to the same amount of money in the past or in the future. oThe concept of the time value of money considered the following: -initial costs (P) (present value) -discount or interest rate (i%) -life time of an investment (n) 1.INTRODUCTION (Continued)

oTo make an equivalent value of money for an assessment along its economic life, many methods can be used such as: 1.Present worth method 2.Uniform annual method 1.INTRODUCTION (Continued)

First Cost Annual Maintenance Cost Annual Labor Cost Extra Income Taxes Salvage Value Life, Years$26,000,000$800,000$11,000,000---$2,000,0006 Project A $36,000,000$300,000$7,000,000$2,600,000$3,000,00010 Project B An Illustrated Example: If the minimum required rate of return is 15%, which project should be selected ? Using Uniform Annual Worth Method EUAC A = $18,442,000 EUAC B = $16,925,000

oTo identify the problems of application of life cycle costing in Saudi Arabia. oTo assist the relative severity of those problems from point of views of the government and the private sectors. 2.OBJECTIVES OF THE STUDY

This investigation was undertaken into two phases. The first phase include a literature search and interviews. *The identification of five groups of main problems and a total of 26 specific problems In the second phase *A survey was conducted to assess the relative severity of these causes. *The survey was filled buy 11 government agencies and 12 consulting offices that apply life cycle costing. 3. RESEARCH METHODOLOGY

There are five main categories of problems of life cycle costing: First: Knowledge Problems Second:Data Problems Third:Procedures Problems Fourth:Management Problems Fifth:Cost Problems 4. PROBLEMS OF APPLICATION

First: Knowledge Problems: 1.Unfamiliarity with design-to-cost concept 2.Lack of knowledge of the concept 3.Unknown relation between initial cost and future cost 4.Unavailability of enough references 4. PROBLEMS OF APPLICATION (Continued)

Second:Data Problems 5.Unavailability of capital cost data: 6.Unavailability of maintenance data: 7.Unavailability of operation data: 8.Unavailability of discount or interest rate data 9.Unavailability of time life data 10.Large volume of data needed 11.Unavailability of standard method for collecting & recording of data 12.Unavailability of data base management system 4. PROBLEMS OF APPLICATION (Continued)

Third:Procedures Problems: 13.Unreliability of decision taken 14.Lack of Integrity of forecast 15.Majority of LCC calculations involve uncertainty 16.Unavailability of qualified staff 17.Unavailability of qualified consultants 4. PROBLEMS OF APPLICATION (Continued)

Fourth:Management Problems: 18.Unacceptance of the concept 19.Government non-enforcement 20.Management (client) pressure to meet budget limit 21.Management (client) pressure to meet time deadline on design: 22.Unclear benefits of LCC to management (client) 23.Improper planning and control of management tasks at different LCC stages 4. PROBLEMS OF APPLICATION (Continued)

Fifth:Cost Problems: 24.Cost to be paid for designer to conduct LCC: 25.Cost to be paid for collection of data: 26.Difficulties in defining cost elements: 4. PROBLEMS OF APPLICATION (Continued)

Based on a survey of the responses, a severity index was calculated to reflect the severity of each individual problem and problem groups. The severity indexes were grouped to reflect the respondents' ratings as follows: * Strongly severe87.5 < I  100 * Severe62.5 < I  87.5 * Somewhat severe37.5 < I  62.5 * Somewhat not severe12.5 < I  37.5 * Not severe 0 < I  RESULTS OF THE SURVEY

Table 1 shows the severity index for individual problems in government agencies. Table 2 shows the severity index for individual problems in consulting offices. In the same manner. Table 3 shows the severity index for problem groups in government. Table 4 shows the severity index for problem groups in consulting offices. 5. RESULTS OF THE SURVEY (continued)

Table 1 - Results of Government Agencies' Survey of Problems Problem Definition [1]StronglySevere[2]Severe[3]SomewhatSevere[4]Somewhat Not Severe [5]NotSevere[6]SeverityIndex[7] Uniformilization of design-to-cost concept Lack of knowledge of the concept Unknown relation between initial and running cost Unavailability of satisfactory references (a) Knowledge Problems 5. RESULTS OF THE SURVEY (continued)

Problem Definition [1]StronglySevere[2]Severe[3]SomewhatSevere[4]Somewhat Not Severe [5]NotSevere[6]SeverityIndex[7] Uniformilization of design-to-cost concept Lack of knowledge of the concept Unknown relation between initial and running cost Unavailability of satisfactory references (a) Knowledge Problems Table 2 - Results of Consulting Offices’ Survey of Problems 5. RESULTS OF THE SURVEY (continued)

Table 3 - Severity Index of Problem Groups in Government Knowledge Problems Data Problems Procedure Problems Management Problems Cost Problems Group Description ABCDE Group Average Sev. Index 5. RESULTS OF THE SURVEY (continued)

Table 4 - Severity Index of Problem Groups in Firms Knowledge Problems Data Problems Procedure Problems Management Problems Cost Problems Group Description ABCDE Group Average Sev. Index 5. RESULTS OF THE SURVEY (continued)

For government agencies: *Individual problems: Twenty-four individual problems rated "severe" and two individual problems rated "somewhat severe". *Problem Groups: Four groups fall in the "severe" category and one group falls in the "somewhat severe". 5. RESULTS OF THE SURVEY (continued) Based on the foregoing results shown in Tables 1, 2, 3 & 4, the following could be indicated:

For consulting firms:  Individual Problems: Six individual problems rated as "severe" and twenty problems rated "somewhat severe".  Problem Groups: All groups fall in the "somewhat severe" category. 5. RESULTS OF THE SURVEY (continued)

For government agencies: *Individual Problems: Unavailability of qualified consultants, management pressures to meet budget and design limits are the most severe hurdles in the application of LCC, with severity indexes of 82%, 77% and 77% respectively. * Problem Groups: Procedure problems, management problems and knowledge problems are the most severe hurdles in the application of LCC with severity indexes of 74%, 73% and 70% respectively. 5. RESULTS OF THE SURVEY (continued)

For consulting firms: * Individual Problems: Unavailability of data base management systems and unavailability of interest rate and life time data are the most severe hurdles in the application of LCC with severity indexes of 67%, 67% and 65% respectively. * Problem Groups: Data problems, management problems, and procedure problems are the most severe hurdles in the application of LCC with severity indexes of 60%, 57% and 56% respectively. 5. RESULTS OF THE SURVEY (continued)

 In government agencies: Contradiction of LCC concept to government policy which is based on initial cost in selecting alternatives and in bidding.  In consulting offices: Resistance of management to introduction of new concepts. Unclear concepts to clients. Time and cost incurred to update the in-house data base management system.  In government agencies: Contradiction of LCC concept to government policy which is based on initial cost in selecting alternatives and in bidding.  In consulting offices: Resistance of management to introduction of new concepts. Unclear concepts to clients. Time and cost incurred to update the in-house data base management system. 6. OTHER PROBLEMS ADDED BY RESPONDENTS

It can be concluded that government agencies and consulting firms, due to the differences of responsibilities and work interest, generally differ in their ranking of the problems that affect LCC application. However, both parties agreed that the chief cause for not applying LCC in government agencies or the public sectors are: 7. CONCLUSION client or management pressure to meet deadlines for design approval. lack of human resources (qualified consultants and staff) and material resources (sufficient data and data quality)

THANK YOU