Www.its.berkeley.edu/volvocenter Congestion Mitigation Michael Cassidy Anthony D. Patire.

Slides:



Advertisements
Similar presentations
Beltline Highway ITS – Ramp Metering Project ODOT Planners Meeting April 25, 2012.
Advertisements

Chapter 12 Freeway Driving.
Capacity, Level of Service, Intersection Design (1)
Chapter 14: Basic Freeway Segments and Multilane Highways
Signs Keep it Simple. Which are on ramps? Exits?
Effect of Electronically Enhanced Driver Behavior on Freeway Traffic Flow Alain L. Kornhauser Professor, Operations Research & Financial Engineering Director,
INTERSTATE DRIVING Information Processing: Complex Risk Environments
Capacity Analysis CE 453 Lecture #14.
Progressive Signal Systems. Coordinated Systems Two or more intersections Signals have a fixed time relationship to one another Progression can be achieved.
CEE 320 Fall 2008 Queuing CEE 320 Anne Goodchild.
Evaluation of the Effectiveness of Potential ATMIS Strategies Using Microscopic Simulation Lianyu Chu, Henry X. Liu, Will Recker PATH ATMS UC.
Lec 5: Capacity and LOS (Ch. 2, p.74-88)
Luminy, October 2007 Traffic Flow in Networks: Scaling Conjectures, Physical Evidence, and Control Applications Carlos F. Daganzo U.C. Berkeley Center.
3/6/06Michael Dixon1 CE 578 Highway Traffic Operations Freeways Ramps and Ramp Junctions Examples and Special Applications for Merge Areas.
3/6/06Michael Dixon1 CE 578 Highway Traffic Operations Lecture 21: Freeway Ramps and Ramp Junctions Diverge Areas.
3/17/06Michael Dixon1 CE 578 Highway Traffic Operations Lecture 22: Diverge Area Special Cases, Influence Area Speeds, and Freeway Weaving Sections.
ATMS Advanced Traffic Management Systems. ATMS Intent of ATMS: –Improve operational control –Adapt control strategies to current/expected traffic –Provide.
Month XX, 2004 Dr. Robert Bertini Using Archived Data to Measure Operational Benefits of ITS Investments: Ramp Meters Oregon Department of Transportation.
CE 578 Highway Traffic Operations Freeway Merge and Diverge Segments.
CE 578 Highway Traffic Operations Introduction to Freeway Facilities Analysis.
Dynamic Speed Limits to improve local air quality Henk Stoelhorst Rijkswaterstaat, Centre for Transport and Navigation.
Advanced Lane Management Assist (ALMA) for Partially and Fully Automated Vehicles Robert L. Gordon, P.E. 1.
Using Archived Data to Measure Operational Benefits of a System-wide Adaptive Ramp Metering (SWARM) System Task 4: Pilot Study July 31, 2006 Robert Bertini.
Ch. 16 Driving on Highways.
Revisions to Chapter 2C – Warning Signs and Object Markers.
Expressway Driving. Characteristics of Expressway Driving Roadway Speed Interchanges No cross traffic Median Tollbooths Entrance/exit ramps Limited access.
USING PeMS DATA TO EMPIRICALLY DIAGNOSE FREEWAY BOTTLENECK LOCATIONS IN ORANGE COUNTY, CALIFORNIA Robert L. Bertini Portland State University Aaron M.
Characteristics of Transitions in Freeway Traffic By Manasa Rayabhari Soyoung Ahn.
Traffic Flow Anil Kantak Transportation and Traffic Flow Anil V. Kantak 1.
© 2014 HDR, Inc., all rights reserved. COUNCIL BLUFFS INTERSTATE SYSTEM MODEL Jon Markt Source: FHWA.
1 Modeling Active Traffic Management for the I-80 Integrated Corridor Mobility (ICM) Project Terry Klim, P.E. Kevin Fehon, P.E. DKS Associates D.
Urban Storm Drain Design: Typical urban roadway characteristics
OPTIMIZING RAMP METERING STRATEGIES
Congestion Causes and Solutions. Traffic Congestion Characteristics Slower speeds Longer trip time Increased queues More vehicles.
TRB Transportation Applications Conference Congestion-Free Freeways US Department of Transportation Establishing a Metropolitan.
Ramp Metering – New experiences in NRW. 1.) Initial situation and first experiencies 2.) Ramp Metering in context of CENTRICO 3.) Actual problems and.
Assessment and Refinement of Real-Time Travel Time Algorithms for Use in Practice November 8 th, 2007.
Company LOGO Ramp Meters. Company LOGO What are Ramp Meters? Part of NaviGAtor, Georgia DOT’s Intelligent Transportation System (ITS) Also includes electronic.
Traffic Flow Fundamentals
Revisions to Chapter 2C – Warning Signs and Object Markers
Abstract Loop detector data for northbound Autobahn 9 (A9) from Munich to Nurnberg, Germany is analyzed using the cumulative curves methodology. The analysis.
Unit 4 Chapters 7, 9, 10 and 11.
Problem 4: Okeechobee Road Stopped Control Analysis.
Corridor Congestion Management Innovation for better mobility sm.
AND TRAFFIC SETTINGS ENVIRONMENTS. RESIDENTIAL STREETS FACTORS???? DRIVING PATTERNS SPEED PEDESTRIANS PARKED CARS TRAFFIC LAWS.
Virginia Department of Education
Effect of Electronically Enhanced Driver Behavior on Freeway Traffic Flow Alain L. Kornhauser Professor, Operations Research & Financial Engineering Director,
ANALYSIS OF VARIABLE SPEED LIMIT SYSTEM ON A GERMAN AUTOBAHN Steven Boice Portland State University M.S. Civil Engineering Candidate A Thesis defense presented.
Fundamental Principles of Traffic Flow
Hcm 2010: BASIC CONCEPTS praveen edara, ph.d., p.e., PTOE
Expressway Driving Legacy High School Drivers Education.
Freeway Level of Service
(is it necessary?) By: Tim Torrini per. two Ramp meters are the “stop and go signals located at the entrance ramps of freeways to regulate the amount.
MERGING What Young Drivers Must Do to Execute These Maneuvers.
Transportation Research Board Planning Applications Conference, May 2007 Given by: Ronald T. Milam, AICP Contributing Analysts: David Stanek, PE Chris.
Performance Evaluation of Adaptive Ramp Metering Algorithms in PARAMICS Simulation Lianyu Chu, Henry X. Liu, Will Recker California PATH, UC Irvine H.
Abstract Loop detector data for northbound Autobahn 9 (A9) from Munich to Nurnberg, Germany is analyzed using the cumulative curves methodology. The analysis.
Transportation Systems Management and Operations: Why It Matters Presenter Name Date AGENCY LOGO Photo: © Shutterstock.com/iofoto ( )
Abstract Traffic was studied on a thirty kilometer section of freeway north of Frankfurt Am Main, Germany using archived loop detector data. The spatial-temporal.
OBJECTIVES  We will understand the characteristics of expressways  We will apply risk-reducing strategies to enter and exit traffic, steer, establish.
Enhancing the capacity of on-ramp system by controlling the entrance gap Bin Jia, Xingang Li a, Rui Jiang b, Ziyou Gao a Bin Jia a, Xingang Li a, Rui Jiang.
CEE 495/771 – Fall 2008 Topic 9 Ramp Metering Ramp Metering.
Fundamentals of Traffic Operations and Control Nikolas Geroliminis FALL 2015.
When Being Passed Monitor passing vehicle’s position Move to lane position 3 to increase space cushion Do not increase speed—decelerate if necessary Once.
Brian Kary Freeway Operations Engineer. Active Traffic Management.
ATDM Analytical Methods for Urban Streets Urban Streets Subcommittee Meeting January 10, 2016 David Hale.
EXPRESSWAY.
Macroscopic Density Characteristics
HIGHWAY CAPACITY & LEVEL OF SERVICE (LOS)
Presentation transcript:

Congestion Mitigation Michael Cassidy Anthony D. Patire

Expressway traffic management Main Themes –Innovative control strategies –Equitable approach –Ameliorate capacity drop

Capacity Drop Cumulative Vehicle Count A(t) D(t) Time  Added Delay  Queue Discharge Drop

Conventional Strategies Traffic Signals –Restrict flow onto freeway –Add queues to city streets On-ramp metering –Long queue spillover –Inequitable transfer of delay Meter Move queue to ramp Change in Discharge?

Sustainability Context Problem: Congestion will never really “go away” Goal: Efficient management of existing resources –Save time and gasoline –Equitable solutions Method: Understand mechanism of capacity drop and reverse it to maintain high discharge flow

Earlier Work Capacity Drop Mechanism at an Isolated Merge Bottleneck X1X1 X3X3 X1X1 X3X3 Started with a sharp rise in shoulder lane accumulation Induced drivers to maneuver into adjacent freeway lanes (lane changing rates doubled) -- Rudjanakanoknad and Cassidy, UC Berkeley

Variable Message Signs & Variable Speed Limits Higher Outflow Reduction in “disruptive” lane changes Many Open Questions Requires a “full accounting” Meter VMS: “Onramp Congestion Ahead” bN cap = A New bN cap = B>A

Yokohama-Machida Bottleneck -0.23% +2.38% 23KP22KP 21KP 20KP -1.87% -0.52% Camera Loop VMS Camera KP Camera KP Traffic Direction

Loop Data Dec 23, 2005

Manual Counts Dec 23,2005 On this day 12 & 13 mostly superimposed

Key Features of Bottleneck Scattered braking at camera 13 –Excess accumulation not sustained Excess accumulation between cam 11 & 12 –Coincident with flow drops –But the head-of-queue moves upstream Cumulative curves for cameras 12 and 13 mostly superimposed –Waves appear to be forward moving Freeflow speed-drop on uphill segment

Speculation On the grade, freeflow velocity may be a function of flow Flow [veh/hr] Velocity Triangular Fundamental Diagram Fundamental Diagram on the grade Density [veh/km]

Freeflow-Speed Adjusted Counts 5100 Slopes in vehicles per hour 4700

Freeflow-Speed Adjusted Counts 5100 Slopes in vehicles per hour 4700

A closer look

Final Thoughts Freeway is not homogeneous due to the upward grade On the grade, freeflow speed diminishes with flow Conditions not FIFO Queue begins in rightmost lane We are optimistic that we can study the mechanism even if it happens at camera 13

Future Work Analyze more data on different days –Top-of-hill vs. Bottom-of-hill –Data after 7am Understand capacity drop mechanism –Disaggregate lanes –Measure density profile Invent and field-test capacity-drop mitigation schemes