GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR-01779-01 Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.

Slides:



Advertisements
Similar presentations
EPSON STAMPING ISO REV 1 2/10/2000.
Advertisements

USING NASA QUALITY STANDARDS NASA Academy of Aerospace (AAQ) Quality Mini-Workshop Ken Crane Quality Engineering Technical Discipline Team Lead NASA SAFETY.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Safety Overview.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
GLAST LAT ProjectDOE/NASA Status Review, March 31 & April 1, 2004 Performance & Safety Assurance 1 GLAST Large Area Telescope: Performance & Safety Assurance.
GLAST LAT ProjectMonthly Status Review – December 2, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
ISO 9000 Certification ISO 9001 and ISO
Section 20.0 Mission Assurance Roger Counts Systems Assurance Manager ST5 PDR June 19-20, 2001 GSFC 5 Space Technology “Tomorrow’s Technology Today”
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
From Research Prototype to Production
GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 N. Virmani Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
LSST Camera CD-3 Review Brookhaven National Laboratory, Brookhaven, NY LSST Safety Council Camera Review Bremerton, WA 2015 LSST Camera Environment,
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Overview Electrical Ground Support Equipment Overview Scott Williams Stanford.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Safety and Mission Assurance Jorg Fischer, PFP SMA Manager.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept EFW INST+SOC PDR97 RBSP Electric Field and Waves Instrument (EFW) Product.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 Survey & Process Review conducted at Teledyne on Nov. 14, 2003.
THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section 17 1 GLAST Large Area Telescope: Performance & Safety Assurance WBS: 4.1.A.
1 MAVEN Documentation Training. Date September 12, 2011 Particles and Fields Package (PFP) MAVEN - FLT Traveler Book Documentation Training Safety and.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 STEREO Product Assurance Ron Jackson
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
GLAST LAT ProjectPeer Review & CDR Preparation Document: LAT-PR Preparation Schedule Subsystems Peer Reviews –ACD January 7-8, 2003 –CALMarch.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Software Quality Assurance Kelly Burlingham SQE Stanford Linear Accelerator Center Gamma-ray.
Accelerator Readiness Review October 31, 2006
EFW DFB Systems Assurance
EFW DFB Systems Assurance
THEMIS Mission Assurance
Peer Review Agenda (Suggested).
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope:
BRIAN KLATT MISSION ASSURANCE MANAGER
Integration and Test Organization Chart
GLAST Large Area Telescope:
Emulsion Task Force Meeting
Integration and Test Organization Chart
Introduction and Overview
GLAST Large Area Telescope:
DOE Review of the LCLS Project October 2006
DOE Review of the LCLS Project 7-9 February 2006
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance & Safety Assurance Darren S. Marsh SU-SLAC Performance & Safety Assurance Manager (650) Gamma-ray Large Area Space Telescope

GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 2 Outline Introduction Requirements Performance Assurance System Contamination Control Workmanship and Inspection Nonconformance Reporting Systems Safety

GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 3 Introduction Performance & Safety Assurance is a program consisting of: –Quality Assurance Hardware Software –Systems Safety –EEE Parts Program –Materials & Processes Program –Contamination Control –Reliability & Risk Management Program –Design Verification –Technical Reviews

GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 4 Performance & Safety Assurance Requirements

GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 5 Requirements Flow-Down Level 1 Document SU-SLAC IPO Integration & Test SU-SLAC Level 2 Documents CAL NRL France, Sweden ACD GSFC Electronics, DAQ & Flight Software SU SLAC Mech. System SU-SLAC IOC SU-HEPL Sci.Software, SU-SLAC Level 4 Documents: controlled by each subsystem manager Level 3 Documents NASA/GSFC GLAST Project Office TKR UCSC SLAC, Italy, Japan

GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 6 LAT Performance Assurance System LAT Performance Assurance Implementation Plan (PAIP), LAT- MD-00039, Released and Approved by GSFC –Requirements for performance assurance elements are defined LAT Quality Manual, LAT-MD-00091, Completed and Released –Procedures and work instructions established which provide for the identification, handling, packaging, storage and transportation of flight hardware Configuration Management Plan, LAT-MD-00068, Implemented –All project documentation stored in central database, with individual controlled access via: –Single Document Change Notice (DCN) Form for initial release to configuration control, and to record changes

GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 7 Other Performance Assurance System (Con’t.) Design Verification –Instrument Performance Verification Plan, LAT-MD-00408, issued and released –LAT Environmental Specification, LAT-SS-00778, completed, in review cycle –Requirements traceability/verification matrix development efforts underway Test Facility Activities –On-going preparation of SLAC I&T facility for flight hardware receipt Cleanroom procedures and personnel training planned ESD equipment and facility environmental monitoring equipment in place –SLAC End Station “A” facility/equipment requirements identified and planned –Survey of NRL Payload Checkout Facility performed Capabilities, personnel qualifications, and equipment specifications reviewed

GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 8 Other Performance Assurance Systems (Con’t.) Calibration Program Implemented, LAT-MD –Equipment and tools used for flight hardware inspection, test and measuring are calibrated to ensure their accuracy QA support of integration and test activities: –Test readiness reviews –Verify test set-ups –Monitor thermal testing –Witness vibration testing

GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 9 Contamination Control The LAT Contamination Control Program will be governed by the LAT Contamination Control Plan, LAT-MD –LAT Integration & test activities will be performed in class 100,000 environment –Surface cleanliness verification of flight hardware by particle fallout plates, tape lifts, particle fallout samples and/or NVR solvent rinses/swabs –Materials used in flight hardware shall meet outgassing requirements as specified in the LAT Contamination Control Plan –Required thermal vacuum testing of flight hardware shall be performed and outgassing rates shall be monitored to achieve required maximum outgassing levels

GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 10 Work Authorization All integration & test activities will be performed on approved Assembly and Inspection Data Sheets (work orders) –Responsible Engineer, Manufacturing Engineer and Quality Engineer review and sign –Assembly, integration or test instructions Step-by-step procedures Provisions for operator and inspector sign-off May reference other documents, such as test procedures, criteria for workmanship, etc. Work order remains with specific activity until final acceptance Completed work orders are archived by LAT Quality Assurance

GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 11 Assembly and Inspection Data Sheet

GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 12 Workmanship & Inspection Requirements Where applicable, all I&T personnel working on flight hardware will be trained and certified to the following standards: –NASA-STD , Workmanship Standard for Staking and Conformal Coating of Printed Wiring Boards and Electronic Assemblies –NASA-STD , Workmanship Standard for Surface Mount Technology –NASA-STD , Requirements for Soldered Electrical Connections –NASA-STD , Requirements for Crimping, Interconnecting Cables, Harness, and Wiring –NASA-STD , Electrostatic Discharge Control.

GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 13 Workmanship & Inspection Requirements (Con’t.) The Assembly and Inspection Data Sheet will define the steps for QA inspection –Quality records will be maintained and reviewed Mandatory inspections points (MIP) will be performed for integration & test at predefined inspection points –To screen out defects caused by workmanship, design, assembly, etc. –To prevent unacceptable products from entering the next stage of production –A final inspection verified that the hardware/software deliverables meet requirements and are properly documented

GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 14 Nonconformance Reporting During integration and test, all nonconformances will be reported through the LAT nonconformance & corrective action (NCR/CA) system –All major nonconformances will be reported to the GSFC Project Office within 24 hours –Close-out of all nonconformance reports shall be verified by the Performance Assurance Manager The LAT I&T Material Review Board (MRB) shall determine the disposition of all flight hardware that does not conform to drawings, specifications or requirements –MRB is chaired by the PSAM with participation from design engineering, system engineering and effected subsystem personnel –A waiver request will be process for any “use as is” MRB disposition

GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 15 Systems Safety Established and implemented System Safety Program Plan (SSPP), LAT-MD –Comply EWR 127-1, Eastern and Western Range Safety Requirements –LAT Preliminary Hazard Analysis, LAT-MD-00366, identifies safety critical areas, assesses risk, and establishes requisite hazard controls –LAT Operating and Support Hazard Analysis, (in progress), evaluates activities for hazards or risks introduced into the system by operational and support procedures and evaluates the adequacy of operational and support procedures used to eliminate, control, or abate identified hazards or risks. Identified hazards include: –Collision –EMI/EMC –Structural Failure