Steve Lewis XTOD October, 2005 UCRL-PRES LCLS Week/FAC October, 2005 Steve Lewis X-ray Transport, Optics, and Diagnostics: Controls Status
Steve Lewis XTOD October, 2005 UCRL-PRES Major Effort Areas Naming and counting all devices Block diagrams of entire system Aligning XTOD controls hardware with LCLS global standards Completing cost+schedule Installing EPICS and PLC software at LLNL
Steve Lewis XTOD October, 2005 UCRL-PRES Naming/Counting Devices Comprehensive spread-sheet is complete LCLS-conformant names selected Full “chain” enumerated: device cable controller/PLC cable IOC Equipment costs tallied Effort costs tallied: Mgmt + EDI + unit Block Diagrams are complete Also matches mechanical layout
Steve Lewis XTOD October, 2005 UCRL-PRES
Steve Lewis XTOD October, 2005 UCRL-PRES
Steve Lewis XTOD October, 2005 UCRL-PRES Cost Summary =5 FTEs
Steve Lewis XTOD October, 2005 UCRL-PRES LCLS Global Standards… Motors: Newport XPS single-box: turnkey; TCP/IP field-bus; driver and motor record from APS Cannot “set position”; may need alternate for powerful motors Cameras: Camlink compatible from SLAC IOCs: VME/6100 when EVR required ‘Small’ IOC? Want RTEMS+EPICS+drivers+‘breakout’ engineering
Steve Lewis XTOD October, 2005 UCRL-PRES LCLS Global Standards… Vacuum Choices for Gauges MKS-937A w/317-CEP and 422-CCG 15msec response option Choices for Ion Pumps MPS-2 SafeCONN w/StarCell PLC: Allen-Bradley CLX-5000 for processor Flex-I/O for distributed I/O EtherIP+serial from SNS
Steve Lewis XTOD October, 2005 UCRL-PRES V G P C IOC <=PLC-to-IOC & PLC-to-PLC: Ethernet/IP <=IOC-to-OPI: Ethernet/CA G C Controller-to-IOC: Serial=> <=Hardware-to-PLC: analog O I/O PLC Operator uses portable console –Gauge/controller read-outs available –Optional valve panel PLC provides both single-sector and global control –Analog wiring to devices –Delegate to smart gauge controller EPICS uses Ethernet/IP for full access –Star-wiring to switches –Additonal serial path for more details EPICS “master” sequencing available
Steve Lewis XTOD October, 2005 UCRL-PRES EPICS at LLNL 2 Linux servers operational Working w/SLAC group on clean build PLC Software w/PC in house Will install soon FY06 Prototype Gas Attenuator and Vacuum Prototype Motors, Cameras, and IOCs R&D on Diagnostics
Steve Lewis XTOD October, 2005 UCRL-PRES EPICS at LLNL FY07 Procure all H/W Configure EPICS Design Diagnostics FY08 Complete Diagnostics Commission