Steve Lewis XTOD 24-28 October, 2005 UCRL-PRES-210834 1 LCLS Week/FAC 24-28 October, 2005 Steve Lewis X-ray Transport, Optics,

Slides:



Advertisements
Similar presentations
Stephanie Allison LCLS Event System 14 June LCLS Event System Outline HW Block Diagram Timing Requirements Time Lines EVG.
Advertisements

XTCAV X-Band Transverse Deflecting Cavity Project Overview Patrick Krejcik Yuantao Ding, Joe Frisch.
Wayne Lewis Australian Synchrotron Beamline Controls Design and Implementation.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
Stefan Moeller Revised XES April 7, 2005 Revised X-Ray Endstation Scope Stefan Moeller.
John Arthur X-ray June 17, X-ray Overview XTOD current status XES current status Schedule to first experiments.
Steve Lewis Direct Imager 06 Dec EPICS Controls Steve Lewis 07 December 2007 LCLS Direct Imager Final Design Review.
John Arthur Photon Systems April 16, LCLS Photon Systems Status Technical status and accomplishments Response to.
John Arthur Photon October 18, 2005 LCLS Photon Systems Status John Arthur SLAC.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
John Arthur Photon October 27, Photon Systems Overview John Arthur SLAC.
Dayle Kotturi Controls April 29, 2004 Injector Controls LCLS Facility Advisory Committee April 29-30, 2004 Outline Description.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
SNS Integrated Control System SNS Machine Protection System EPICS Workshop April 27, 2005 Coles Sibley.
Steve Lewis XTOD 4-8 April, 2005 UCRL-PRES LCLS Week 4-8 April, 2005 Steve Lewis X-ray Transport, Optics, and Diagnostics:
E. Michael Saleski PPS and April 20, 2006 LCLS Personnel Protection System and Beam Containment System E. Michael Saleski.
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
Stefan Moeller XES Plan for FAC Review - April 20, 2006 X-Ray Endstation Systems (XES) Status and Plan for FY06 Stefan Moeller.
EPICS on TPS RF System Yu-Hang Lin Radio Frequency Group NSRRC.
Stephen Schuh Vacuum Controls Final Design 6 April 2006 Injector Vacuum Controls Hardware Final Design Review 6 April 2006.
Steve Lewis XTOD Controls FDR 14 February 2008 XTOD Instrument Controls Final Design Review Steve Lewis 14 February 2008.
Steve Lewis XTOD Controls FDR 13 March 2008 XTOD Vacuum Controls Final Design Review Steve Lewis/Keith Kishiyama 13 March 2008.
Single Board Computers and Industrial PC Hardware at the CLS
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
Ethernet (EPICS VLAN) IOC Gauge ControllerMass Flow ControllerTurbo Pump Controller Analog and Digital Signals Beamline Gate Valves Mass Flow Unit Turbo.
1 Progress of the Controls for BEPCII EPICS Seminar Presented by J. Zhao 20 August, 2002.
Donn H. McMahon XTOD Configuration October 24-26, 2005 UCRL-PRES X Ray Transport, Optics, and Diagnostics Overview FAC.
Dec 8-10, 2004EPICS Collaboration Meeting – Tokai, Japan MicroIOC: A Simple Robust Platform for Integrating Devices Mark Pleško
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
Haller/Lewis XTOD Controls July 27, XTOD Controls Preliminary Design Review Steve Lewis & Gunther Haller.
Steve Lewis Gas Detector 6 December Instrumentation & Controls Steve Lewis Paul Pax Elden Ables 6 December 2006 LCLS Gas Detector.
Oct 8-9, 2005ACS Collaboration Meeting – Archamps, France The MicroIOC From Custom To Production First customer: PSI 25 pieces.
LCLS Control Group EPICS Collaboration April 27, 2005 Controls Overview April 27, 2005 Outline Goals Status update.
Steve Lewis Gas Attenuator 11 December Instrumentation & Controls Steve Lewis 11 December 2006 LCLS Gas Attenuator Preliminary.
18th June 2003 Diamond Vacuum System Steve Singleton 18th June 2003.
Laser Heater Controls Overview 21 August 2008 Matt Boyes Laser Heater Controls Design Overview EPICS IOC Team Meeting Matt Boyes.
1 The Cost & Schedule to Accomplish the Transition Proposed SLAC Controls Upgrade December 1, 2010 Ray Larsen.
The recent history and current state of the linac control system Tom Himel Dec 1,
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
Steve Lewis Controls: Vacuum 5 April, 2005 UCRL-PRES LCLS Week 5 April, 2005 Steve Lewis Vacuum Standards.
New product introduction:
Hamid Shoaee Control LCLS ARR Oct 31, LCLS Accelerator Readiness Review Control System for Injector Commissioning.
LCLS Control Group FAC – 06 Installation October 27/28, Plans for 2006 Installation October 27, 2005 Installation.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
April 2005OLAV Workshop Diamond Vacuum Controls Hugo S Shiers.
Patrick’s Updates - 8/30/11 (one slide for each of the following) 1.XTCAV Project 2.ASTA Gun Test Facility Instrumentation & Controls 3.Fast wire scanner.
ESS (vacuum) control system Daniel Piso Controls Division February 20, 2013.
Allen-Bradley PLC-5 Control With A ‘Soft’ IOC 1 Jim Stevens APS Controls Group Epics Collaboration Meeting May 20, 2015 Rick Putnam APS MOM Group.
LEDA Vacuum Interlocks Bob Dalesio. Outline Leda vacuum system – displays and interfaces PLC Interlocks as presented to the operator EPICS interlock to.
SESAME Control System Status
Current Status of IPM-Linac Control System
PLC-based control systems at SOLEIL - ICALEPCS 2017
LCLS-II 2K Cold Box Controls Design Review
Engineering - potential areas for action
Timing and Event System S. Allison, M. Browne, B. Dalesio, J
Cryogenic C&C Scope of work
HAPS Controls Glen White ATF2 Software Review Workshop, LAL, June 2008
DOE Review May, 2005 Steve Lewis
SC1R Cold Box PDR Controls
EPICS Controls Steve Lewis 13 December 2007
Undulator Vacuum System
Undulator Vacuum System
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
DOE Review 11 May 2005 Stephen A. Lewis
LCLS Week 4-8 April, 2005 Steve Lewis
DOE Review 7-9 February, 2006 Steve Lewis
Commissioning the European XFEL cryogenic system and best practice
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Vacuum Control System for Monolith Vacuum
DOE Review 11 May 2005 Stephen A. Lewis
Presentation transcript:

Steve Lewis XTOD October, 2005 UCRL-PRES LCLS Week/FAC October, 2005 Steve Lewis X-ray Transport, Optics, and Diagnostics: Controls Status

Steve Lewis XTOD October, 2005 UCRL-PRES Major Effort Areas Naming and counting all devices Block diagrams of entire system Aligning XTOD controls hardware with LCLS global standards Completing cost+schedule Installing EPICS and PLC software at LLNL

Steve Lewis XTOD October, 2005 UCRL-PRES Naming/Counting Devices Comprehensive spread-sheet is complete LCLS-conformant names selected Full “chain” enumerated: device  cable  controller/PLC  cable  IOC Equipment costs tallied Effort costs tallied: Mgmt + EDI + unit Block Diagrams are complete Also matches mechanical layout

Steve Lewis XTOD October, 2005 UCRL-PRES

Steve Lewis XTOD October, 2005 UCRL-PRES

Steve Lewis XTOD October, 2005 UCRL-PRES Cost Summary =5 FTEs

Steve Lewis XTOD October, 2005 UCRL-PRES LCLS Global Standards… Motors: Newport XPS single-box: turnkey; TCP/IP field-bus; driver and motor record from APS Cannot “set position”; may need alternate for powerful motors Cameras: Camlink compatible from SLAC IOCs: VME/6100 when EVR required ‘Small’ IOC? Want RTEMS+EPICS+drivers+‘breakout’ engineering

Steve Lewis XTOD October, 2005 UCRL-PRES LCLS Global Standards… Vacuum Choices for Gauges MKS-937A w/317-CEP and 422-CCG 15msec response option Choices for Ion Pumps MPS-2 SafeCONN w/StarCell PLC: Allen-Bradley CLX-5000 for processor Flex-I/O for distributed I/O EtherIP+serial from SNS

Steve Lewis XTOD October, 2005 UCRL-PRES V G P C IOC <=PLC-to-IOC & PLC-to-PLC: Ethernet/IP <=IOC-to-OPI: Ethernet/CA G C Controller-to-IOC: Serial=> <=Hardware-to-PLC: analog O I/O PLC Operator uses portable console –Gauge/controller read-outs available –Optional valve panel PLC provides both single-sector and global control –Analog wiring to devices –Delegate to smart gauge controller EPICS uses Ethernet/IP for full access –Star-wiring to switches –Additonal serial path for more details EPICS “master” sequencing available

Steve Lewis XTOD October, 2005 UCRL-PRES EPICS at LLNL 2 Linux servers operational Working w/SLAC group on clean build PLC Software w/PC in house Will install soon FY06 Prototype Gas Attenuator and Vacuum Prototype Motors, Cameras, and IOCs R&D on Diagnostics

Steve Lewis XTOD October, 2005 UCRL-PRES EPICS at LLNL FY07 Procure all H/W Configure EPICS Design Diagnostics FY08 Complete Diagnostics Commission