OLYMPUS Collaboration Meeting Luminosity Monitor Symmetric Möller/Bhabha Calorimeter David Rodríguez Piñeiro HIM / Mainz University OLYMPUS Collaboration.

Slides:



Advertisements
Similar presentations
Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment.
Advertisements

Engineering Division 1 HFT Middle Support Cylinder Eric Anderssen, LBNL.
PANDA Mechanical Workshop Backward Endcap Calorimeter Geometry David Rodríguez Piñeiro GSI Darmstadt PANDA Mechanical Workshop GSI
Mer/Sup. 2 & 3 Door Evaporator Coil Repositioning Procedure S. Starnes 7/11/03 1. Remove the 2 screws holding one end of the evaporator coil. (view shows.
SupaRule Cable height meters Presented by: Gary Carroll Director Feb 2004.
Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
PANDA Collaboration Meeting Backward Endcap Calorimeter Geometry David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting GSI
MICE Hall – South Mezzanine Jason Tarrant - STFC l Contents »Device checks with current South Mezzanine »South Mezzanine change summary »Conclusion.
The LiCAS FSI Subsystem Current Status and Initial Measurements John Dale for the LiCAS Collaboration IOP HEP April 2008.
HERMES tracking for OLYMPUS. Part #1. Detector survey. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
Status at DORIS Hall Argus was removed by end of march Argus Parts (except 4 heavy pieces) shipped to Hall 1 Rails of electronics hut have to be extended.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
OLYMPUS Collaboration Meeting Cooling Water David Rodríguez Piñeiro Mainz University OLYMPUS Collaboration Meeting DESY
Status at DORIS Hall June 28th start of mounting the Al- frames, progressig very fast, finished by July 9th All 8 coils pressure tested with 15 bar = O.K.
OLYMPUS Collaboration Meeting Luminosity Monitor Symmetric Möller/Bhabha Calorimeter David Rodríguez Piñeiro Mainz University OLYMPUS Collaboration Meeting.
Luminosity Monitor MWPCs, test beam 22 results. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
MONALISA David Urner Paul Coe Matthew Warden Armin Reichold Oxford University.
Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.
Dec. 4, 2001 CERN-1 Hans de Vries VELO Mechanics  RF/vacuum foil  Rectangular bellow  Wake field suppressors  Cabling Summary & Outlook VELO mechanical.
Status Report on Mk.II Pepperpot Simon Jolly Imperial College 13 th June 2007.
05/30/08J. Dunne -- SANE Collaboration Meeting 1 Beamline Status Upstream beamline –Chicane –SEM –Rasters –Girder Downstream beamline –Helium bag –Extension.
Status of the Beamline Simulation A.Somov Jefferson Lab Collaboration Meeting, May 11, 2010.
HAMBURG BEAM PIPE POSSIBLE LAYOUT AND MANUFACTURING JANUARY 2012.
Hcal Geometry and Assembly CLIC Meeting - LAPP December 2008, 15th.
News on PANDA ToF from ITEP (new mechanic design for DRPC based system) ITEP Russia-Panda meeting — April 26-28, 2010, ITEP(Moscow) Alexander Akindinov.
Scintillation hodoscope with SiPM readout for the CLAS detector S. Stepanyan (JLAB) IEEE conference, Dresden, October 21, 2008.
Current Status and Possible Items around ‘neutrino beam’ Horn Target Remote maintenance tools Decay volume window and collimator muon monitor Many items.
FETS meeting Beam Profile Measurement Tank By P. Savage 13th June 2007.
May 17, 2006Sebastian Baunack, PAVI06 The Parity Violation A4 Experiment at forward and backward angles Strange Form Factors The Mainz A4 Experiment Result.
EDR of the TOTEM Roman Pots - CERN - 24 November 2005 Beniamino Di Girolamo - CERN PH/ATT ATLAS Roman Pots at IR1 Beniamino Di Girolamo CERN.
EIC Compton detector update October 24 th 2014 Alexandre Camsonne.
Testing the possibility of detecting the light emitted by the PPS.
Interaction Region Backgrounds M. Sullivan for the MEIC Collaboration Meeting Oct. 5-7, 2015.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
Summary of RIKEN visit. Chamber Top plate Bottom plate Middle cylinder.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
SOME CEDAR NEWS Lau Gatignon / EN-MEF TD meeting 12/07/2011  Summary of HAZOP and Zoning meeting  Forthcoming CEDAR related work at CERN.
Vicon subsoiler - Terra PL Product Information 2013.
Review on shorter PSB main bending magnets Injection layout with short magnets Advantages & Disadvantages Wim Weterings
CEDAR MECHANICS Liverpool Conceptual Design (Subject to funding from STFC) 1 CEDAR Mechanics Conceptual Design.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Irradiations at Birmingham cyclotron Procedure 1.
PANDA Collaboration Meeting D. Rodríguez Piñeiro SciTil and Next Steps.
Stripline Beam Position Monitors for the High Luminosity LHC D. Draskovic, T Lefevre CERN, BE-BI-QP.
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
MEA Machine and Experiment Assembly Norbert Meyners, MEA 12. July 2007ILC IRENG07 WG-A1 LDC Engineering Design (Status) Introduction General Design Detector.
Status of the Yoke Interfaces Presented by Evgeny Koshurnikov February 2013.
New Support Structure 4x4 Beams Existing Stairs per Mr Walter Kellner Cherenkov 32 deg shifted back 4.0 inches to clear existing structure Cherenkov 40.
Electrostatic FEA on Field Cage Profile Configurations Bo Yu.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
G. GIRAUDO - D. ORECCHINI Beam-Target line for PANDA – GSI – 4 February 2013 Beam-Target line for PANDA – GSI – 4 February 2013 Central Trackers assembly.
STRAW TRACKER SYSTEM CAD STATUS :
Update of MVD services and requests
CLAS12 Beamline Configurations
David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin EMC BW Endcap.
Vacuum chamber for the CMS forward region
EMC BWE PANDA Insertion
16 T dipole in common coil configuration: mechanical design
SWITCHES W. C. “Buster” Hounshell Spring 2002.
New Design for Beam Test Structure
Initial BIS installation
Micromegas for CLAS12 – Preliminary work on integration
OLYMPUS Collaboration Meeting Luminosity Monitor Calorimeter
XY Scanner Mount.
Igor Zagorodnov BD meeting, DESY
Hall probe Location on top or bottom
Summary of the FCCee IR Workshop Jan 2017 at CERN
Presentation transcript:

OLYMPUS Collaboration Meeting Luminosity Monitor Symmetric Möller/Bhabha Calorimeter David Rodríguez Piñeiro HIM / Mainz University OLYMPUS Collaboration Meeting DESY

Symmetric Möller/Bhabha 26/04/2011David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting2 1.- New Beam Pipe Design 2.- New SYMB Design 3.- Main Support 4.- Interferences 5.- Summary

Symmetric Möller/Bhabha 26/04/2011David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting3 1.– New Beam Pipe Design

Symmetric Möller/Bhabha 26/04/2011David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting4 Cone pipe with SYMB windows: Difficult and expensive to manufacture Traditional design

Symmetric Möller/Bhabha 26/04/2011David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting5 Windows shorter Cone (due to Wakefield suppressor) inside the beam pipe

Symmetric Möller/Bhabha 26/04/2011David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting6 2.– New SYMB Design

Symmetric Möller/Bhabha 26/04/2011David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting7 Shifted ~350 mm upstream Adapted to the new enviroment Collimator and Lead Wall not aligned Boxes move away from the beam in diagonal Alignment system reordered

Symmetric Möller/Bhabha 26/04/2011David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting8 In the new position

Symmetric Möller/Bhabha 26/04/2011David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting9 Safety Factor: SF Total Displacement: TD SF > 7 TD < 0,05 mm SF > 8 TD < 0,04 mm SF> 6 TD: 0,0007 mm

Symmetric Möller/Bhabha 26/04/2011David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting10 Hallo Counter Further check

Symmetric Möller/Bhabha 26/04/2011David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting11 3.– Main Support

Symmetric Möller/Bhabha 26/04/2011David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting12 Will fit with this shape Will be made out of standard aluminum profiles Adaptad to the new enviroment

Symmetric Möller/Bhabha 26/04/2011David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting13 Longer in Z Still laying on the tubular supporting beams Due to interferences it will be mounted in place

Symmetric Möller/Bhabha 26/04/2011David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting14 4.– Interferences

Symmetric Möller/Bhabha 26/04/2011David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting15 SYMB OLYMPUS No clash detected Just 0 contact on the tubular supporting beams

Symmetric Möller/Bhabha 26/04/2011David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting16 Top View MWPC ToF Frame Beam Pipe Coils Frame

Symmetric Möller/Bhabha 26/04/2011David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting17 Tight clearances, but feasible

Symmetric Möller/Bhabha 26/04/2011David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting18 Mounted in place Optimized design to avoid overlapping parts

Symmetric Möller/Bhabha 26/04/2011David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting19 Cables to the ceiling? Tubular support attached to ToF frame Flasher box? Flasher box

Symmetric Möller/Bhabha 26/04/2011David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting20 New beam pipe design => New SYMB design New position: ~350 mm upstream Not interference with other subsystems (Hallo Counter study) Attached to the tubular supporting beams (longer in Z towards the beam) Summary

Symmetric Möller/Bhabha 26/04/2011David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting21 Personal Contact: Tel: +49 (0) /1634 web.mit.edu/OLYMPUS Thank you! Frank Maas Sebastian Baunack Dmitry Khaneft Boris Gläser Eric Göbel Yue Ma Roberto Pérez