MICE Target Schedule Chris Booth Sheffield 12 th June 2006.

Slides:



Advertisements
Similar presentations
1 MICE Target Status Chris Booth 3 rd March 2004.
Advertisements

MICE MICE Target Mechanism Paul Smith University of Sheffield 8 th June 2010 (Based upon talk given by Chris Booth at CM26)
MICE Target Report Video Conference 15/03/07 Chris Booth Sheffield 15 th March 2007.
MICE Target Report Chris Booth (for target team) Sheffield 23 rd April 2009.
The MICE Target Lara Howlett University of Sheffield.
Progress on Target Design Chris Booth Sheffield 2 nd August 2004.
MICE Target Status Chris Booth 30 th March Chris BoothUniversity of Sheffield 2 The challenge ISIS beam shrinks from 73 mm to 55 mm radius during.
Target Status Report Lara Howlett University of Sheffield.
Target Operation and Status Report Chris Booth for Target Team 20 th October 2008.
MICE TARGET HARDWARE C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 - The MICE Experiment.
ISIS Related Issues for MICE Adam Dobbs Proton Accelerator Development Meeting, RAL 24 th March /03/20111A. Dobbs.
MICE Target Development Chris Booth Sheffield 8 th June 2006.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
MICE Target Report Chris Booth (for target team) Sheffield 7 th May 2009.
Extra Control Electronics? Chris Booth Sheffield 27 th November 2008.
Progress on Target Design Chris Booth Sheffield 14 th July 2004.
Status of Electronics & Control System P J Smith University of Sheffield 16/12/2009.
P J SmithUniversity of Sheffield1 MICE Target Electronics Paul J Smith University of Sheffield Fermilab 10 th June 2006.
MICE Target Status Chris Booth Sheffield 10 th May 2006.
TARGET WORKSHOP – SHEFFIELD HALLAM UNIVERSITY Monday 2 March 2009 The ISIS – MICE interface Eddie McCarron Contents 1.Target alignment with ISIS beam centre.
Target Update – Mico Meeting Monday 21 st April 2008 General Expect to obtain new coils for stators anytime New Shafts at RAL for metrology. Will be back.
Stator Plan & Schedule Chris Booth 2 nd March stators to construct for mid-April. One complete coil assembly recovered from ISIS drive. Coils recoverable.
MICE Target Review Chris Booth Sheffield 12 th June 2006.
A Tale of Two Targets … 7 th September 2009 Chris Booth The University of Sheffield.
CMPB Alain Blondel 14 April STATUS OF MICE.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
DESIGN AND OPERATIONAL EXPERIENCE OF THE MICE TARGET Target Drive The linear electromagnetic drive that has been designed to meet these requirements consists.
MICE Target Report Video Conference 05/07/07 Chris Booth Sheffield 5 th July 2007.
Target Design – Status and Plans Chris Booth Sheffield 12 th January 2005.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
MICE Target Mechanism P J Smith University of Sheffield MICE CM 18 RAL June 2007.
S A Griffiths Target Review Jan 2009 Target Electrical / Control Schematic HexBridge Power electronics Interface PSU Capacitor Bank Local Control Interface.
Chris BoothMICE-UK I.C. 16th January Useful meeting held at RAL last Thursday. Representatives of MICE, ISIS & others with Sheffield electronic &
MICE Target – Design Update and Test Plans Chris Booth Sheffield 22 nd October 2005.
1 MICE TARGET STATUS 23 rd February 2007 CM17 - CERN Paul J Smith University of Sheffield.
MICE MICE Target Mechanism Control Electronics Upgrade P J Smith – University of Sheffield James Leaver – Imperial College 2 nd March 2009.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
24/10/2015Sheffield University 1 Target Electronics Recap - Decision has been made to rebuild the target electronics control system so that it is upgraded.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
MICE Target - Risk Lara Howlett University of Sheffield.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
Target Status CM19 RAL October 2007 P J Smith – University of Sheffield.
BWS electronics design status J.Emery & Luca, Pierre-Jean, Emiliano, Jose, Alexander and all past contributors!
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MICE Target Development Lara Howlett University of Sheffield.
Status of Target Design Chris Booth Sheffield 28 th October 2004.
MICE TARGET OPERATION C. Booth, P. Hodgson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 – The MICE Experiment2 - The.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Jason Tarrant / November 2008 MICE Target Mechanical Design l Jason Tarrant – STFC l Introduction »Investigations into target shaft failure »Current suspicions.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
MICE Target Installation Chris Booth & Paul Smith Sheffield 26 th July 2007.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
Programme for “Target 3” – test of alternative bearing materials (from Jason Tarrant) –Drawing updates by 11 th November –Bearings: Material approval –
Target Status Report Chris Booth & Paul Hodgson Sheffield 18 th Sept ember2008.
Chris BoothUniversity of Sheffield 1 Target Status & Progress 1 st February 2006 Disappointingly slow progress over last 2 months. However, progress is.
MICE Target – Status & Plans Chris Booth Sheffield 28 th February 2006.
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
Target Status 27 th August 2009 Chris Booth The University of Sheffield.
The Target Drive For The MICE Experiment Control and Infrastructure Optical Readout and Drive Electronics Target Drive A linear electromagnetic drive has.
Chris Booth Sheffield 29th March 2006
Stator Plan & Schedule Chris Booth 2nd March 2009
Target Installation Plan
P. J. Smith on behalf of the MICE target team.
MICE Meeting at RAL, Oct-23, 2005
MICE Target Report Video Conference 29/11/07
Completing the Step IV Programme
Status of Target Design
Polarized 3He target installation
Presentation transcript:

MICE Target Schedule Chris Booth Sheffield 12 th June 2006

Chris BoothUniversity of Sheffield 2 Key Dates Assembly test R76 (RAL): 24 th -28 th April (past!) Mechanical test R76: 17 th -21 st July Mechanical & Electrical test R76: September Installation & Run in ISIS: Oct. – Nov. Installation for MICE: Summer ‘07

Chris BoothUniversity of Sheffield 3 To date: Low power tests (in air) in Sheffield –Demonstrated principles of control & drive –Demonstrated optical readout –Cooling, noise, reliability issues April assembly test & review –Redesign shuttle shaft –Redesign optical window enclosure, fibre alignment system, … –Checks on flanges, indium seals, etc

Chris BoothUniversity of Sheffield 4 Now to July Indium seal tests (RAL) Build new shaft (Oxford) Design/build top chamber/readout (Sheffield/RAL) Build new stator (Sheffield) Vacuum tests (Sheffield) Optical isolation of control boards (Sheffield) Optical drive of hex bridge (Sheffield) Improved control & monitoring (Sheffield) Acceleration & temperature tests (in vacuum) (Sheffield) Reliability tests (Sheffield) Mechanical test at RAL 17 th -21 st July –Demonstrate vacuum quality –Demonstrate mechanical compatibility

Chris BoothUniversity of Sheffield 5

Chris BoothUniversity of Sheffield 6 Now to September Build & test IGBT hex bridge driver (Daresbury) Build second shaft (Oxford) Build second (improved?) stator (Sheffield) Build second top chamber/readout (Sheffield/RAL) New quadrature board for optics (Sheffield) Improved controller hardware & software (Sheffield) ISIS interface boards (Sheffield) Temperature monitoring hardware & s/w (Sheffield) Acceleration tests (at 80 A) (Sheffield) Temperature, reliability tests (at 80 A) (Sheffield) Mechanical & electrical test at RAL 18 th -22 nd September –Demonstrate reliability –Measure vibration etc –Pass ISIS acceptance criteria – not yet defined!

Chris BoothUniversity of Sheffield 7

Chris BoothUniversity of Sheffield 8 September to October Fix any problems revealed in September! Continue to test & improve controls, interfaces, monitoring November test aims Operation with ISIS – interlocks, synchronisation Run at ISIS startup at 50 Hz/64 or 50 Hz/128 (lower activation, reduced cooling problems, …) Probably only run ~1 shift Measure beam halo profile – determine required insertion depth End of test: Raise above gate valve & close –Maybe run in that position at intervals during ISIS run?

Chris BoothUniversity of Sheffield 9 Beyond November Optimisation of stator cooling –Alternative to potting? –Closer cooling elements (eddy currents?) –Multiple coil banks Optimisation of acceleration –Magnet dimensions? –Shaft design (reduce mass) –Optimisation of control (current timing etc) Development of interlocks –Temperature, ISIS beam loss, … Development of monitoring –Temperature –Target profile –Links with MICE monitoring (EPICS) Development of control –Dynamic feedback from monitoring?