Aneurysm Model Prototype: Design Update Sara Goldgraben Bill Hauser Michael Savarese Advisor: Dr. Strey Customer: Dr. Chen BME 441 Design April 3, 2006.

Slides:



Advertisements
Similar presentations
Aero-Hydrodynamic Characteristics
Advertisements

03800B RAIL PREHEATER.
Northwest Natural 12” Pipeline Integrity Project Team Members Jon Ziring Zack Lemmon Long Nguyen Academic Advisor Faryar Etesami NWN Sponsor Advisors Ross.
By Jayde Kowallis and Jordan Rhoads. Introduction A copper pipe wrapped with heated tape is needed to direct blow-by gasses from the engine crank case.
Heart Phantom Lacey Halfen, Jessica Hause, Erin Main, Peter Strohm and Fan Wu Client: Orhan Unal Advisor: Willis Tompkins.
Hydraulics.
COMPACT MOBILE LIFTING DEVICE Team Michael Shaffer, Ken Kammerer, Dave Geesaman, Jin Ko Sponsor: Jim Adkins, Fraunhofer Advisor: Dr. Michael Keefe.
Liquid Nitrogen (LN2) Fire Extinction - Phase II
04013 Micro Turbine Senior Design Micro Turbine Senior Design PDR – May 20 th, 2004 Project
Background Two phase flow, flow of both a liquid and gas state, is crucial in countless space applications including power cycles, the storage and transfer.
Degradation of Liquid Embolic Polymer - A Pulsatile Flow Model BME 440 Senior Design Project Dr. Strey Dr. Weiliam Chen (customer) Group 1: Sara Goldgraben,
ME Project: Air Conditioner Lab Team: 10 Members: Sean M. Gallagher, Brian Davison, Prathana Vannarath, Pam McDowell Customer: University of Delaware Mechanical.
Kern Method of SHELL-AND-TUBE HEAT EXCHANGER Analysis
Design Alternatives for Polymer Degradation Model Sara Goldgraben Bill Hauser Michael Savarese BME 440 Design December 5, 2005.
Hydraulic Pump Design for Coupe Door System Michigan State University Group Member Faculty Advisor Chris Lowe Dr. Farhang Pourboghrat Jeff Mann Fai Leung.
Design and Fabrication of a Miniature Turbine for Power Generation on Micro Air Vehicles Team Arman Altincatal Srujan Behuria Carl Crawford Dan Holt.
On the Deposition of Paraffin Wax in a Batch Oscillatory Baffled Column Mr Lukman Ismail, Dr Robin E. Westacott and Professor Xiong-Wei Ni School of Engineering.
CENTENNIAL HYDRAULIC ISOLATION CONTROL SYSTEM (CHICS) Peter Bergin Trevor Hartley Centennial Newstan In conjunction with APT Training.
“HEAR IT AND FORGET IT, SEE IT AND REMEMBER IT, DO IT AND UNDERSTAND IT” R12310: ME and ChemE Lab and Demo Hardware Development DPM – Spring 2012.
Final Presentation Crew: Mike Lanteigne Wallace Barkhouse Scott Donahoe Blair MacKay Captain: Dr. Jimmy Chuang April 4 th 2012.
Rotor Track and Balance
Project Status Update R09220 – Competitive FSAE Autosports Systems Aaron Heyman (IE) Shijo George (ME) Stephanie Malinowski (ME) Alex Sandy (ME) Greg Wall.
NOvA Water Cooling System Erik Voirin, Mike Zuckerbrot Erik Voirin; Mike Zuckerbrot1NOvA Water Cooling System.
Practical Aspects of using Pitot Tube
Project Definition The aim of this project was to design a steerable catheter, which would enable easier access to specific blood vessels. The design would.
Asahi/America Thermoplastic Check Valves Ball Check Valves ½” - 4”PVC, CPVC, PP, PVDF Uniseat/ Seal.
Team Gun Show Final Presentation December 1, 2004 Group Members: Nate Griggs Clay Hamlin Marc Manning Jon Megahy Van Vo Joel Williamson.
Team: James Mazza, Andre Berwin, Peter Dunning, Nathan Fulcher, Andrew Watson, Travis Bardsley, Anthony Parker April 5, 2013.
Gravity Fed System Team Members: James Brinkerhoff, Christopher Kulbago, Patrick O’Connell, Lauren Pahls, Ted Rakiewicz, Sarah Salmon Group Number: P13631.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
 The Task  The Approach  The Evaluation  The Analysis  The Model  Conclusions  Project Management.
Wegman's Swirl Cake Process Improvement: Detailed Design Review Aaron Delahanty Ryan Norris Arwen Sharp Benson Yu Kenyon Zitzka Nov. 11th, 2011.
Chapter 5: BIOREACTOR DESIGN & SCALE-UP
In-vivo Device for Measuring and Adjusting Lap-Band Pressure John Huidekoper Mark Fritz Chris Schroeder Andrew Koivuniemi David Mayhew ©Bill Watterson.
Pulmonary Flow Resistive Device Taya Furmanski Albert Attia Advisor: Thomas Doyle, M.D. April 9, 2003.
DESIGN OF CASCADE for AXIAL FLOW COMPRESSORS
Team: Charlie Haggart, Gabriel J. Martínez-Díaz,
Pump design Raimonds Nikoluskins CERN – LIEBE project coordination meeting.
through Introduction  Particle Imaging Velocimetry (PIV) uses a sheet laser beam to illuminate particles that cross the sheet.  The particles.
1 Challenge the future The Lateral Motion of Wafer under the Influence of Thin-film Flow Leilei Hu Solid and Fluid Mechanics
Improving Performance of a Heavy Duty Engine Cooling Drive Through Reduction of Drag Losses Design Recommendations & Future Analysis CFD Analysis It is.
Machine Design I (MCE-C 203) Mechatronics Dept., Faculty of Engineering, Fayoum University Dr. Ahmed Salah Abou Taleb Lecturer, Mechanical Engineering.
Design of a Device for Manipulating Small Objects in a Solution Design Team: James Black, Seong Byun, Jeremy Johnson, Nathan Wagers ME 462 Capstone Design.
Rosemount 485 Annubar® Flowmeter Series
1 Estimation of Dynamic Force Coefficients from a Wet (Foamy) Annular Seal Progress Year 1 May rd Turbomachinery Research Consortium Meeting Gary.
Pulmonary Flow Resistive Device Taya Furmanski Albert Attia Advisor: Thomas Doyle, M.D. March 17, 2003.
Mechanical Testing System Coupled with an Environmental Chamber for Hydrogels Team: Charlie Haggart, Gabriel J. Martínez-Díaz, Darcée Nelson, and Michael.
Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.
ΜPET/CT Heating Device Team Leader – Eric Printz Communicator – Justin Schmidt BWIG – Ryan Carroll BSAC – Ben Engel Client – Dr. Robert Jeraj Ph.D Advisor.
Update on the ESS monolith design Rikard Linander Monolith and Handling Group ESS Target Division TAC 10, Lund, Nov 5,
Team Members: Lacey Halfen, Jessica Hause, Erin Main, Peter Strohm & Fan Wu Client: Orhan UnalAdvisor: Willis Tompkins Team Members: Lacey Halfen, Jessica.
Integrated Hands-On Mechanical System Laboratories Arif Sirinterlikci, Ph.D., Professor of Engineering Tony Kerzmann, Ph.D., Assistant Professor of Mechanical.
World-Class Manufacturer & Solution Provider in Custom and Commodity Bearings.
AUTOMATED ROD SINGULATION SYSTEM Student: James Welch Concentration: Mechanical Class: ET-494 Spring 2015 Instructor: Dr. Cris Koutsougeras Advisors: Dr.
Target Systems and Monolith Design Update Rikard Linander Group Leader Monolith and Handling April 2, 2014.
Rear Cover Assembly The Toodle comes with the rear cover assembled. Normally, there is no need to open the rear cover. In case the rear bearing is stuck.
Determine method of rapid prototyping or plastic extrusion to create prototype of true-to-scale catheter Determine optimal slot size without affecting.
FINAL PRESENTATION UNIVERSITY OF CINCINNATI
Advisor: Dr. Shangchao Lin
Turbomachinery Flow Visualization P08453
Customer Presentation
MECHANICAL DRAWING WORKING DRAWINGS
Concept Level Project Plan P08453 – Turbomachinery Flow Visualization
Project Status Update R09220 – Competitive FSAE Autosports Systems
Tubes Dimensions Tube diameters in the range 5/8 in. (16 mm) to 2 in. (50 mm) are used. The smaller diameters 5/8 to 1 in. (16 to 25 mm) are preferred.
Stand Alone Group Members: Jaime Alvarez Austin Chamberlain Trey Smith
Tabletop Torsion Device
Designing and Manufacturing of a hand operated plastic injection moulding machine envisioned for the mesoscale range. Freddy Travieso
Mini – iTX Computer Case
Intra-vitreal Injection
Presentation transcript:

Aneurysm Model Prototype: Design Update Sara Goldgraben Bill Hauser Michael Savarese Advisor: Dr. Strey Customer: Dr. Chen BME 441 Design April 3, 2006

Overview Background Original Design Pre-manufacturing Modifications Initial Prototype Testing Post-Manufacturing Modifications Additional Models Near Future Experiments Lab Setup

Background Required parameters Aneurysm neck: 4mm Aneurysm neck: 4mm Vasculature diameter: 4mm Vasculature diameter: 4mm Aneurysm diameter: 7mm Aneurysm diameter: 7mm Flow Velocity: 100cm/min Flow Velocity: 100cm/min Transparent Housing Optical data acquisition Optical data acquisition Mechanically strong Mechanically strong Easily Disassembled Maintenance Maintenance Weight measurement of polymer Weight measurement of polymer Durable Durable Water-tight seals Seal of aneurysm and input/output flow Seal of aneurysm and input/output flow Versatility of Design Reusability Reusability Variable flow Variable flowVelocitySteady/Pulsatile

Original CAD Design Size of materials Plexiglas Plexiglas O-rings O-rings

Pre-Manufacturing Modifications Consultation with George Luhrs Sizes are in closest American standard to our metric requirements Overall Model Stems From 2D Model Idea Double Plug Double Plug Single Plug Single Plug Added Handle with grip O-ring Sealed Plug High Tolerance Machined Plug New Design Size: 5in x 2in Size: 5in x 2in Straight Fluid Flow Straight Fluid Flow Mostly Seamless Mostly Seamless Solid Machined Fittings Solid Machined Fittings Improvements Over Original Design Smaller Overall Dimensions Smaller Overall Dimensions Eliminates long entry length Eliminates long entry length Less Material Used Less Material Used Less Chance of Leaks Less Chance of Leaks Solid Machined Fittings Solid Machined Fittings

Initial Prototype Testing Prototype: High Tolerance Fitting Results Positive PositiveWater-tight Machined Barbed Fittings Work Well Negative Negative Aneurysm Cracks Opaque Tint Requires Further Polishing Requires Further Polishing

Post-Manufacturing Modifications Enlarged Plug Larger Aneurysm Wall Larger Aneurysm Wall Will reduce aneurysm weakness Reduction of Opacity Polishing PolishingMechanical Cloth Tip Cloth Tip Wooden Tip (Plausibility not yet known) Wooden Tip (Plausibility not yet known) Polishing Solution Heat Based Baking Baking Heated Ball Bearings Heated Ball Bearings

Additional Models Lateral Wall Aneurysm Models 11mm and 13mm Aneurysm 11mm and 13mm Aneurysm 4mm vessel 4mm vessel Bifurcated Aneurysm 10-11mm Aneurysm 10-11mm Aneurysm 4mm vessel 4mm vessel

Near Future Experiments Test Polishing Methods Test Model with Polymer Easily Cleaned Easily Cleaned Sufficiently Transparent Sufficiently Transparent No Optical Artifacts No Optical Artifacts

Lab Setup Assembly Safety Precautions Barometer set up Experimental setups Static flow (reservoir is gravity driven) Static flow (reservoir is gravity driven) Dynamic flow (pump) Dynamic flow (pump) Closed loop Open loop

Conclusion Budget Breakdown Pump = $400 Pump = $400 Plexiglas = $80 Plexiglas = $80 Large O-Rings (Not being used) = $35 Large O-Rings (Not being used) = $35 Stand/Clamps/etc = $120 Stand/Clamps/etc = $120 Total so far = $635 Total so far = $635

Acknowledgements Professor Chen – Customer Professor Strey – Advisor George Luhrs – machined our product Lester Orlick – Instructional Support Technician CEAS Greg Pollard – APT Instruments