Physics news and plans Physics–HLT–Computing meeting LHCb week, Heidelberg, Sep 13, 2006 Olivier Schneider (EPFL) – Physics organisation – Updated plans.

Slides:



Advertisements
Similar presentations
Stripping Plans for 2014 and 2015 Laurence Carson (Edinburgh), Stefano Perazzini (Bologna) 2 nd LHCb Computing Workshop,
Advertisements

B triggering Fabrizio Palla INFN Pisa Consorzio CMS Italia Firenze 7 Sept
12 May 2005Kroll/Bedeschi1 Plans for B s Mixing B Meeting 12 May 2005 Franco Bedeschi (INFN-Pisa) Joseph Kroll (Penn)
23 June 2005Kroll/Bedeschi1 Summary of 8 th CDF B Mixing Workshop Held morning of Thu 6/16/05 and Fri 6/17/05 Topics of discussion –status of updating.
Peter Fauland (for the LHCb collaboration) The sensitivity for the B S - mixing phase  S at LHCb.
ISSUES TO CONSIDER IN YOUR PROJECT This is a short presentation from issues discussed in a meeting of MCS3 on Tues 2 nd March 2004.
GLAST LAT Project 1S. Ritz Purposes of the Data Challenges “End-to-end” testing of analysis software. –define the ends –define the tests (what is success?)
Senior Design 1 Project Android Pilot Nation Stellar Sea Lions Team –Andrew Olivier –Jordan Fryer –Karen Echon –Jacob Hahn University of Portland School.
Introduction to the workshop LHCb Generators Tuning Mini Workshop Bucharest 22 nd & 23 rd November 2012 LHCb Generators Tuning Mini Workshop Bucharest.
LHC’s Second Run Hyunseok Lee 1. 2 ■ Discovery of the Higgs particle.
Senior Design 1 Project Android Pilot Nation Stellar Sea Lions Team –Jordan Fryer –Andrew Olivier –Karen Echon –Jacob Hahn University of Portland School.
Annie Griffith Infrastructure Programme Manager July 2007 UK Link Technology Refresh.
ERP Project Update September 2013
Marco Cattaneo, 23rd February Status of the software migration  Migration strategy: Where we should be  Status: Where we are  Plans.
AGS RSVP Weekly Meeting P. Pile 27 Jan 2005 AGS RSVP Weekly Meeting 27 Jan 2005 Useful Links: RSVP Project : C-AD.
Usability Issues Documentation J. Apostolakis for Geant4 16 January 2009.
News from the Beatenberg Trigger Workshop Ricardo Gonçalo - 18 February 2009 Higgs WG Meeting during ATLAS Week.
Computing Infrastructure Status. LHCb Computing Status LHCb LHCC mini-review, February The LHCb Computing Model: a reminder m Simulation is using.
Introduction Ricardo Goncalo HSG5 H->bb weekly meeting, 18 October 2011.
LHCb computing in Russia Russia-CERN JWGC, March 2007.
LHCb computing in Russia Ivan Korolko (ITEP Moscow) Russia-CERN JWGC, October 2005.
Senior Design 1 Project Android Pilot Nation Stellar Sea Lions Team –Andrew Olivier –Jordan Fryer –Karen Echon –Jacob Hahn University of Portland School.
WLE Operations Team Planning Meeting 2 nd February 2015, Water’s Edge.
G.Corti, P.Robbe LHCb Software Week - 19 June 2009 FSR in Gauss: Generator’s statistics - What type of object is going in the FSR ? - How are the objects.
Prompt J/  and b ➝ J/  X production in pp collisions at LHCb Patrick Robbe, LAL Orsay & CERN, 7 Dec 2010 For the LHCb Collaboration KRUGER 2010 Workshop.
LHCb Lausanne Workshop, 21st March /12 Tracking Software for DC’06 E. Rodrigues, NIKHEF LHCb Tracking and Alignment Workshop  To do list, and done.
Update on MC-04(05) –New interaction region –Attenuation lengths vs endcap module numbers –Regeneration and nuclear interaction –EMC time resolution –
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
Organisation of the Beatenberg Trigger Workshop Ricardo Gonçalo Higgs WG Meeting - 22 Jan.09.
The LHCb CERN R. Graciani (U. de Barcelona, Spain) for the LHCb Collaboration International ICFA Workshop on Digital Divide Mexico City, October.
1 News and Miscellaneous UPO Mar Didier Contardo, Jeff Spalding o General news o ESP and Manpower needs o Cost scale for phase 2 o June Upgrade.
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
Study of exclusive radiative B decays with LHCb Galina Pakhlova, (ITEP, Moscow) for LHCb collaboration Advanced Study Institute “Physics at LHC”, LHC Praha-2003,
Post-DC2/Rome Production Kaushik De, Mark Sosebee University of Texas at Arlington U.S. Grid Phone Meeting July 13, 2005.
Refitting Tracks from DST E. Rodrigues, NIKHEF LHCb Tracking and Alignment Workshop, Lausanne, 8-9th November 2006  Motivations  Step-by-step …  Current.
1 October 2003Paul Dauncey1 Mechanics components will be complete by end of year To assemble ECAL, they need the VFE boards VFE boards require VFE chips.
Annie Griffith & Chris Fears September 2007 UK Link Technology Refresh.
LHCb: Xmas 2010 Tara Shears, On behalf of the LHCb group.
LHCbComputing LHCC status report. Operations June 2014 to September m Running jobs by activity o Montecarlo simulation continues as main activity.
Activity related CMS RPC Hyunchul Kim Korea university Hyunchul Kim Korea university 26th. Sep th Korea-CMS collaboration meeting.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 14 Mar 2012 Doc: Source: [ETSI]
1 Guy Wilkinson University of Oxford LHCb week 30/6/10 St Petersburg Physics Introduction: all presentations this week focused on ICHEP.
28/01/101 Zvv bkg, how to get an estimate with first data ? R. Brunelière Time schedule is tight. Goal : get an estimate by may/june if we get data from.
Ian Bird Overview Board; CERN, 8 th March 2013 March 6, 2013
LHCbComputing Computing for the LHCb Upgrade. 2 LHCb Upgrade: goal and timescale m LHCb upgrade will be operational after LS2 (~2020) m Increase significantly.
Alain Romeyer - Sept Light Higgs search in SUSY cascades Introduction (Previous studies) Plans for this analysis Simulation chain Reconstruction.
Tools Report Engineering Node March 2007
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
LHCb Computing activities Philippe Charpentier CERN – LHCb On behalf of the LHCb Computing Group.
Marco Cattaneo, 3-June Event Reconstruction for LHCb  What is the scope of the project?  What are the goals (short+medium term)?  How do we organise.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
Towards the TDR KM3NeT-DS WPx Meeting, Paris, Feb , 2009 Uli Katz ECAP / Univ. Erlangen  My private views  Basis for discussion  Decisions taken.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
H->bb Note Plans for Summer Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 21 June 2011.
Introduction 08/11/2007 Higgs WG – Trigger meeting Ricardo Gonçalo, RHUL.
Marco Cattaneo, 20-May Event Reconstruction for LHCb  What is the scope of the project?  What are the goals (short+medium term)?  How do we organise.
LHCb Computing 2015 Q3 Report Stefan Roiser LHCC Referees Meeting 1 December 2015.
5/9/081 CP WG γ from trees meeting Guy Wilkinson, 2/4/09.
<workgroup name>
Migration of reconstruction and analysis software to C++
Brief summary of discussion at LCWS2010 and draft short term plan
LHCb Software & Computing Status
POC Procedures Working Group (POC-pWG)
Philippe Charpentier CERN – LHCb On behalf of the LHCb Computing Group
Status of Brunel team and next steps
ATLAS B-physics important periods
Bourke properties Houston, Whitney relocation info 23/02/2019.
DISSEMINATION WORKING GROUP Luxembourg, November 2011 Using Statistics Explained to produce the Eurostat Yearbook Jukka PIIRTO.
SC SC SC WS SC S HIS Background document Seminar document
Overview of Beam Test Benoit, Ronaldo and Eduardo Nov 8 , 2005 thanks to Steve and Bill for helping to consolidate all the information.
Presentation transcript:

Physics news and plans Physics–HLT–Computing meeting LHCb week, Heidelberg, Sep 13, 2006 Olivier Schneider (EPFL) – Physics organisation – Updated plans for MC studies with DC04 and DC06 samples – based on timescale estimates from reconstruction and computing groups – discussed and agreed within the PPG – exposed now to the collaboration

O. SchneiderPhysics-HLT-Computing meeting, LHCb week, Sep 13, Physics organisation oCurrent physics organisation (was set up in Spring 2005): —6 working groups, each with two co-conveners —Physics Planning Group membership: 12 WG conveners 5 ex-officio members (spokesman and deputy, trigger and computing project leaders or their deputies, physics coordinator) —Understanding was that this organisation would be reviewed after ~2 years Many thanks to both Frederic and Clara oChange of convenership of Jets working group: —Frederic Teubert expressed wish to be replaced —Clara Matteuzzi agreed to replace Frederic as Jets WG co-convener (with Aurelio Bay) and as PPG member, for the rest of his term —Change effective September 1, 2006 —Main goal of Jets WG until Spring 2007: – reach some conclusion on the light Higgs sensitivity

O. SchneiderPhysics-HLT-Computing meeting, LHCb week, Sep 13, Why make new plans now ? oJune 2005: —New physics organisation with plans, in the form of a proposal to write a “physics book” (by end of 2006) based on new software and MC samples oSince then: —Several month delay accumulated with respect to original schedule for final version of the reconstruction software and DC06 samples for physics analysis —“Physics book” timescale became irrealistic (and was not updated) —Physics WGs have been living with uncertain schedules oRecently: —some uncertainties reduced: Simulation of bb sample well underway New physics-quality version of Brunel “around the corner” First data-taking now expected end of 2007 (0.9 TeV) and mid-2008 (14 TeV) oNow: —Good time to make (again) plans for MC studies until first data-taking

O. SchneiderPhysics-HLT-Computing meeting, LHCb week, Sep 13, Goal and overall timescale oGoal: get ready for real data taking and analysis —Move as soon as possible to the new software and MC samples  finish exploitation of the DC04 samples in a timely manner —Develop HLT and perform in-depth MC studies of a few important measurements, using the software as “at the start of the experiment” —Write a document (called “physics book” until someone finds a better name) Description of algorithms for trigger, reconstruction, selection, calibration, … Expected (i.e. MC) performance of these algorithms Detailed studies of a few important physics measurements, showing how the measurements are going to be performed (procedures to extract info from real data, use of control samples, etc …) oOverall timescale: —Finish in fall 2007, before pilot run Want to look at real data (not MC) between pilot run and 2008 run Whole exercise can reveal items needing (further) work until mid-2008

O. SchneiderPhysics-HLT-Computing meeting, LHCb week, Sep 13, Studies with DC04 samples (plans) oWe want to: —Finish exploitation of the DC04 samples in a timely manner Because we want people to be ready to move to DC06 samples —Document DC04 studies Public LHCb notes, reviewed by EB, whenever possible Will serve as supporting documents for the Yellow report of Flavour workshop (clearly we use Flavour workshop as an incentive) oSo: —Encourage prompt conclusion of studies with DC04 samples Many studies well advanced, need to wrap up —Make list of desired LHCb notes, attach names to them, and encourage early edition oDeadline —end March 2007 (= end of Flavour workshop) oReview status in LHCb weeks: —this week: … —end Nov:results available, at least in preliminary form —early March: results finalized, LHCb notes drafted

O. SchneiderPhysics-HLT-Computing meeting, LHCb week, Sep 13, Studies with DC04 samples (topics) oContributions to Flavour workshop on rare decays: —Sensitivity studies for B 0  K *0  +  -, B s  ,  b   —Yield and background estimates for B s   +  -, B 0  K *0  + perhaps  b   +  -, B  e , … oContributions to Flavour workshop on UT angles: —Sensitivities to  (tree decays),  (B  ,  ), and  (B 0  J/  K S ) —B  hh analysis oContributions to Flavour workshop on B s mixing: —lifetimes measurements —  m s and  s oContributions to Flavour workshop on b  s hadronic transitions: —Yield and background estimate for B 0   K S oOther studies: —Charm —Jets, Higgs

O. SchneiderPhysics-HLT-Computing meeting, LHCb week, Sep 13, New MC production: priorities oPrevious plan: —First simulate strippable samples (needed for computing challenge) 25M+25M inclusive bb events at L=2  and 5  cm –2 s –1 25M+25M biased bb events at L=2  and 5  cm –2 s –1 —Then reconstruct them + produce all the other events types (exclusive B decays, …) at both luminosities oCurrent status (Sep 8) of simulation with physics-quality Gauss and Boole: 40.4M+26.5M inclusive bb events simulated at L=2  and 5  cm –2 s –1 no biased bb events simulated at L=2  and 5  cm –2 s –1 oDue to delays, worry that large signal samples for tagging studies will be available too late  change priorities —Would like to investigate possibilities to speed up large signal sample production E.g. stop bb simulation now and start signal simulation, produce and strip biased bb samples later

O. SchneiderPhysics-HLT-Computing meeting, LHCb week, Sep 13, Physics reconstr. and stripping oLarge background samples (e.g. inclusive bb): —Need to be reconstructed (rDST) and stripped with pre-selections (DST) —Want small fraction (tbd) without stripping (DST) oLarge signal samples (for tagging studies) —Need to be reconstructed (DST) —Need to be stripped with (partial ?) trigger and offline selections (DST) oMinimum bias sample: —Apply partial (low-level) trigger on DIGI files —Reconstruct events passing trigger (DST)

O. SchneiderPhysics-HLT-Computing meeting, LHCb week, Sep 13, Plans, phase 1: get ready for reconstruction & stripping oSep 06: —Define studies to be done, questions to be answered —Decide what needs to be checked in the new test MC samples (efficiencies, resolutions. …) —Build team of guinea-physicists ready to perform these checks oEnd Sep 06: —New version of Brunel available oOct 06: —Produce test signal samples in DST format, look at them with physicists’ eyes and give feedback to reconstruction —Reconstruction+stripping tests on bb events (low and high lumi)

O. SchneiderPhysics-HLT-Computing meeting, LHCb week, Sep 13, Plans, phase 1: get ready for reconstruction & stripping (cont.) oEnd Oct 06: —Final ready-to-test version of Brunel available —Final deadline for (updated) pre-selections delivered to DaVinci oNov 06: —New tests samples produced and examined, new feedback from physics side to reconstruction —More stripping tests and benchmarks (perhaps iterate on pre-selections) oEnd Nov 06 (LHCb week): —Simulation of at least 100M events (DIGI) finished —Validated physics-quality version of Brunel ready for production —Stripping ready for production —Prioritized list of (all) MC production requests needed for physics book available

O. SchneiderPhysics-HLT-Computing meeting, LHCb week, Sep 13, Plans, phase 2: first excl. samples & stripped bb  start physics studies oDec 06-Jan 07: —Reconstruct 100M DIGI events at Tier1 centers —Strip inclusive bb sample —Produce small sample (~100k events) of each event type (signal, specific background, …) —Preparation for production of special background samples (max. bias) oEnd Jan 07: —67% DIGI events reconstructed and stripped at Tier1s —Samples of each event type available (except max. bias) —DC06 physics studies started oEnd Feb 07: —All DIGI events reconstructed and stripped at Tier1s

O. SchneiderPhysics-HLT-Computing meeting, LHCb week, Sep 13, Plans, phase 3: finish all MC production and stripping oEarly Mar 07 (LHCb week): —First physics results with new samples (selections, bb background levels) —Discussion on format and contents of physics book, decide main editors oEnd Mar 07: —Trigger and offline-selection code ready for signal and minimum bias stripping oEnd Apr 07: —Stripped signal samples available for tagging studies —Stripped minimum bias sample available for HLT studies —Production of all MC samples finished, including max. bias (~200M equivalent events since Dec 1) oTo be fixed (in Apr or May 07): —2–3 day workshop (“physics week”) to review studies with DC06 samples

O. SchneiderPhysics-HLT-Computing meeting, LHCb week, Sep 13, Plans, phase 4: finish studies & document oEarly Jun 07 (LHCb week): —Review of physics book results —Detailed table of contents for physics book defined oEnd Jul 07 —First draft of physics book available oMid-Sep 07 (LHCb week): —All physics book studies basically finalized oEnd Sep 07: —2nd draft of physics book —Drafts of supporting documents oEnd Oct 07: —Everything finished

O. SchneiderPhysics-HLT-Computing meeting, LHCb week, Sep 13, Overall picture Studies with new (DC06) MC dataStudies with old (DC04) MC data Phase 1:  end Nov Define studies to be done Prepare for reconstruction and bb stripping Get all preliminary results Phase 2:  end Feb Reconstruct, strip bb Produce signal samples Start studies Finalize results, notes, and contributions to Yellow report of Flavour workshop (  end March) Phase 3:  end May Strip signal & min. bias Finish production Get preliminary results Phase 4:  end Oct Finalize studies Write physics book and supporting documents Challenging schedule … Let’s try !