6 Sigma Process Improvement Project Clinical Biochemistry Royal Gwent Hospital Introduction Following on from the Process Activity Mapping project it was.

Slides:



Advertisements
Similar presentations
Welcome to the Skills-Based introduction to the ePARs Personal Evidence Database (PED) Keep clicking and this slideshow will take you through the system.
Advertisements

Module 12 WSP quality assurance tool 1. Module 12 WSP quality assurance tool Session structure Introduction About the tool Using the tool Supporting materials.
Project leaders will keep track of team progress using an A3 Report.
GP AUDIT PROJECT DR C BHATTACHARJEE (GP) AND DR W BENHAM (GP REGISTRAR) YEAR: SUNNYBANK MEDICAL CENTRE Wyke, Bradford.
The “Lean” Experience and ongoing Workforce Considerations. Carmarthenshire Division Hywel Dda NHS Trust.
1 The aim…. ‘to enable assessors to objectively assess a laboratory’s compliance with the new standards’
Data Collection Six Sigma Foundations Continuous Improvement Training Six Sigma Foundations Continuous Improvement Training Six Sigma Simplicity.
Sutter Solano Laboratory Lean Six Sigma Project
Microsystem Basics This sheet is designed to give readers a brief introduction to the microsystem approach to quality improvement. What is a Microsystem?
7 Day Self Assessment Tool (7 Day SAT) User Guide v7 (June 2015)
TECH581 Improve/Control Presentation Fall 2008 Date: 12/09/08 Team Members: xxxxx xxxxx Sound Removed.
Use of clinical laboratory databases to enable early identification of patients at highest risk of developing end- stage kidney disease Dr David Kennedy.
Results Conclusions Good compliance with writing TTOs however there is room for improvement with adherence to filling in certain information parameters.
18/08/2015 Statistics Canada Statistique Canada Responsive Collection Design (RCD) for CATI Surveys and Total Survey Error (TSE) François Laflamme International.
Milestone 1 Review Define Phase Complete Cost Data Integrity Project September 5, 2007.
You said… We did ……. Patient Survey Towards the end of 2012 we conducted a Patient Satisfaction Survey which we put on our website and also made paper.
Project Planning with IT Y/601/7321
Slide 1 of 19 Lessons from the Foundation Learning provision for the new 16 to 19 Study Programmes Discussion materials Issue 1: Attendance, retention,
Define the problem to be solved. Measure the current performance. M.
25 January 2013 Dr Ian Arnott UK Inflammatory Bowel Disease (IBD) audit Audit of inpatients with ulcerative colitis 1st January 2013 – 31st December 2013.
Multiple Indicator Cluster Surveys Survey Design Workshop Sampling: Overview MICS Survey Design Workshop.
Service Improvement and Culture Change in the Laboratory Services Reception Sarah E Ramsden MSc CSci FIBMS Objectives  To improve the quality of service.
Assessment of the need (and options) for a Blood Sciences service Susan Clark - The Christie NHS Foundation Trust. Negotiating skills - Building Trust.
Commissioner Feedback for SLAM CQC Inspection in September 2015 Engagement with Member Practices 1.
Risk Surveys Lean Six Sigma Storybook. So what is a Risk Survey?
Local Government Pension Scheme 16 September 2009 PENSION LIAISON OFFICERS’ GROUP (PLOG)
Allied Healthcare Professions Service Improvement Projects Regional Event Turning Data Into Knowledge Resource Pack.
Event Management & ITIL V3
National Commission for Academic Accreditation & Assessment Developmental Reviews at King Saud University and King Faisal University.
Using Data in the Goal-Setting Process Webinar September 30, 2015.
South London Healthcare NHS Trust Service changes March 2011.
Module 5: Data Collection. This training session contains information regarding: Audit Cycle Begins Audit Cycle Begins Questionnaire Administration Questionnaire.
Researching and Writing Dissertations Roy Horn Researching and Writing Dissertations.
1 Presentation Template: Instructor Comments u The following template presents a guideline for preparing a Six Sigma presentation. An effective presentation.
Patient Participation Group Welcome meeting Donnington Medical Practice.
Nicole Sutherlin Brianna Mays Eliza Guthorn John McDonough.
Red Roofs Surgery Local Patient Participation Report We are a long-established practice, located close to the centre of Nuneaton, serving approximately.
EPI 218 Queries and On-Screen Forms Michael A. Kohn, MD, MPP 9 August 2012.
Lunch & Learn – PMO Feb – March 2014 Summary March 31 st 2014.
General Medicine Improving Quality Care Presenter: Jane Lees Health Service: Auckland District Health Board Innovation Poster Session HRT1215 – Innovation.
LCG CCRC’08 Status WLCG Management Board November 27 th 2007
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Six Sigma is a business philosophy that employs a client-centric,
David Pasquarello Ikon Office Solutions
Monitoring Afghanistan, 2015 Food Security and Agriculture Working Group – 9 December 2015.
Scholarships and Awards for Majors in Physics and Astrophysics 20 Awards available, $1,000 - $10,000 recognizing Academic achievement, Potential for excellence.
Template. Project Title : Facility: TeamSponsorCHR Data analysisProcess MappingPatients interviews  Key Findings Issue / Focus AreaMeasure#Root cause.
Software Project Management
Dr Khalida Parveen Basha N Lean six sigma black belt NABL assessor
INFO 3: Use of ICT In The Digital World Topic 7: Developing ICT Solutions Factors that contribute to the success and failure of ICT Systems.
Communication, monitoring and recruitment targets.
Virology Department, Queen Elizabeth Hospital, Woolwich. Claire Warren, David Westrip.
Findings – January  Respondents  Access to the practice  Repeat prescription service  Test results  Practice staff  Overall satisfaction 
JUST GIVE IT: a 2 phase study to audit the Immediate Management of Patients with Proven or Suspected Neutropenic Sepsis by Ally Gruber Acute Oncology Clinical.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
DCAQ, How to… Kris Wright Improvement & Support Team.
ASK MBSAQIP Agenda ASK MBSAQIP November 10, 2016 Time (CST)
Title of the Change Project
WSP quality assurance tool
PATIENT SURVEY Thank you to those who completed a Patient Survey Questionnaire, the response was very good and we got a total of 255 completed, so here’s.
Cancer Optimal Service Design Workshop Defining “what to change” using the NHS Right Care methodology Part of the NEW Devon Way.
OPS/571 Operations Management
National Data Report 2018 Prof Conor O’Keane
CARE ENHANCING PRIMARY
“seen very quickly from referral. understanding practitioner “
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
Assessment For Learning
KVI Analysis for period 1st May 2018 to 31st March 2019
Introduction to Lean and Lean Training
KVI Analysis for period 1st May 2018 to 31st March 2019
Neonatal Workload Tool standard BOXI reports
Presentation transcript:

6 Sigma Process Improvement Project Clinical Biochemistry Royal Gwent Hospital Introduction Following on from the Process Activity Mapping project it was apparent that the process needed to be changed to improve turnaround times for urgent specimens. It was decided to do this using the DMAIC methodology of 6 Sigma. 6 Sigma is a methodology to improve quality by reducing variability, errors and complexity. A project initiation document was drawn up to outline the scope and a steering group set up. Define phase The problem was defined as a failure to meet turnaround time targets for urgent specimens. The Process Activity Mapping project had shown that Inpatient and GP specimens were not such a problem. A project initiation document was drawn up to outline the scope and a steering group set up. Staff from within Biochemistry were recruited onto a project working group to plan and implement the improvements. For simplicity it was decided to look only at A&E and MAU specimens but as the same process would be used for all urgent specimens, this would be a representative sample population. Measure Phase Much of the work of the Measure phase had already been done as part of the Process Activity Mapping project. From a Pareto analysis it was found that 74% of all blood specimens required analysis on the Olympus analysers, on average each specimen going through the OLA 3.6 times. A ‘gauge’ to collect further data needed to be designed and validated to give us a measure of current performance as a baseline. A sub routine was set up in Telepath to gather the turnaround time information on all A&E and MAU specimens. This could then be exported into Excel. An example of the gauge data from this early period is shown in figure 1 This was set up to accumulate data prospectively and enabled an achievable improvement target to be set. This was set as an average turnaround time of 45 min, 95% complete within 1 hour and 100% complete within 2 hours for all urgent Biochemistry blood specimens. Helen Archer 1, Howard Hughes 1 Philip Waters 1, Stuart Thomas 2, Danny O’Sullivan 2, Marc Baker 3, Grant Robinson 4, Marie Thorn 4, Brent Varley 4 1 Clinical Biochemistry, 2 Pathology Management and IT Services, 3 OperaSee Ltd. 4 Pathology Management Team An implementation plan was finalised and circulated to all staff. (figure 2) Prior to each change taking place a memo of exactly what changes were taking place was circulated to all staff in memo form and also displayed on the notice board, emphasis was placed on having standard working practices to reduce variability. Analyse phase The fact that an hour turnaround was met overnight by on call staff showed that the process was ‘capable’, but needed more standardisation to reduce the variability and less delays to reduce the average turnaround time. Using Quality and Root Cause analysis tools the main areas that could be improved were identified. There were too many delays in the process, too many steps where errors could be made and the OLA robotic sorter capacity was the major bottleneck. Improve phase Project and communication plans were drawn up with a timetable for completing 3 improvement cycles each lasting a month. It was decided to explore the option of putting all blood specimens onto the Olympus analysers to bypass the bottleneck step of the OLA for the initial sort. Increased use of auto-validation was thought to be a way of reducing delays in releasing results once they were complete. It was hoped that if all the staff could be engaged and involved in the project then sustainable improvements could be made. All Biochemistry staff, in small groups, were given a presentation of the data. They were also shown a typical process activity map for an urgent specimen and the Trust balanced scorecard section relating to breaches of the 4 hour wait in A&E. They were asked for improvement suggestions which were collated after all the meetings had taken place. These were then circulated to all the staff. There was a suggestion box set up and all the data was kept on display. In addition to the two improvements that had already been suggested by the project group, the staff also thought that a dedicated BMS and analyser for urgent specimens was likely to improve turnaround times. Figure 1 An Example of daily gauge data, showing the poor turnaround time performance at the beginning of the project Daily error logs were set up to record any problems/reasons for poor performance e.g. analyser breakdowns, inadequate staffing levels. Performance was discussed daily with senior BMS staff. Variability was still a problem. Staff groups and Steering group met fortnightly to discuss performance and any issues arising from the changes, including a review of the data gathered by the gauge tool, the chart in figure 4 was used in such a meeting to illustrate the progress made thus far. However the Gauge only gave data for the previous day, and so could not be used in real time to highlight problems as they happened. A live review screen was developed for Telepath system that highlighted any urgent specimens that had exceeded the 1 hour target. This was located on a dedicated terminal next to the ‘Urgent’ analyser. Error logging was improved to try to reduce defects such as PID entry errors. Long term Redevelopment of the laboratory space, the delay in replacing the analytical platforms and IT has hindered further improvement steps. The variability has increased with major changes in the specimen reception area. The improvement has been mostly sustained over the last year but there has been some deterioration as the workload has increased further, staffing levels decreased and the reliability of the analysers has worsened. It is planned that the DMAIC process will help implement and optimise the installation of new analytical platforms in Biochemistry at all three sites in Gwent Healthcare leading to the target performance being met more reliably. Figure 3a. The latest data showing the redesigned “traffic light” gauge scheme Figure 3b Cumulative performance graph, each point represents the average performance for a particular day Figure 4. A cumulative plot of turnaround times after 3 process changes. Note the progressive performance improvement as more changes were applied. Control phase Turnaround times were calculated and displayed daily. The ‘gauge’ was redesigned with ‘traffic light’ colours to emphasise poor performance. (figure 3a) and a longer term cumulative chart developed. (figure 3b) All steering group staff and biochemistry senior staff received a daily with the performance chart from the previous day. Process ChangeDate of First Implementation Date of First Review Date of intermediate review Date of finale Review Conclusions Comments Bypass OLA initial Sort9 th December th December th January st January 2005 Dedicated staff for handling urgents10 th January st January th February st February 2005 Increased use of auto-validation7 th February th February st February th March 2005 Possible Future Changes: Move Trop Analyser to Prep. Room to form a hot- lab- 2 dedicated staff. Remove Phone from Main Lab Separate samples for Trop Analysis Figure 2: Improvement Project Implementation Plan