Tumolo’s Toolbox 7 Step Improvement Process.

Slides:



Advertisements
Similar presentations
7 QC Tools.
Advertisements

7 QC TOOLS 1. Check sheet 2. Pareto Diagram 3. Cause & Effect Diagram
Quality control tools
P D S A REVIEW ACT PLAN STUDY DO Plan Continuous Improvement
©2014 IDBS, Confidential Statistical Process Control Workshop An Introduction to the Principles behind SPC Ilca Croufer.
Eight Basic Quality Improvement Tools – Part 2 Quality Engineering and Quality Management 1 © University of Wisconsin-Madison.
Seven Quality Tools The Seven Tools
1. 2 Do you think the present situation is satisfactory?
Chapter 15 Work Flows Focus: This chapter describes the basic tools and techniques for analysis.
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 13 Tools for Process Improvement.
Chapter 10 Quality Improvement.
Problem Solving Methodologies
1 Chapter 13 Tools for ProcessImprovement. 2 The Deming Cycle Plan DoStudy Act.
Chapter 8: Project Quality Management
Applying the Seven Basic Quality Tools in Software Development
1 Continuous Improvement. 2 1.Overview of the PDCA Problem Solving Cycle. 2.Foundations of the PDCA Cycle 3.Plan Step 4.Do Step 5.Check Step 6.Act Step.
ISHIKAWA’S BASIC SEVEN TOOLS OF QUALITY
Paul Prunty The 7 Basic Quality Tools ~ The DMAIC Process Continuous Improvement and … To a hammer, everything’s a nail … How many tools do you have in.
Methods and Philosophy of Statistical Process Control
Root Cause Analysis: Why? Why? Why?
Overview of DMAIC A Systematic Framework for Problem Solving
Quality Improvement: Problem Solving
2010 AHCA/NCAL QUALITY SYMPOSIUM BALTIMORE, MARYLAND
IMPROVEMENT TOOLS Mahendrawathi ER, Ph.D. Outline  Classification of improvement tools  Purpose of the tools  Extent of change  Time and resource.
MANAGING QUALITY SIX SIGMA SPC
Annex I: Methods & Tools prepared by some members of the ICH Q9 EWG for example only; not an official policy/guidance July 2006, slide 1 ICH Q9 QUALITY.
Tools for Process Improvement
© 2005 Wiley1 Total Quality Management Chapter 5.
Overview of Total Quality Tools
Tools and Techniques for Performance Excellence
SIX-SIGMA QUALITY Chapter Understand total quality management. 2. Describe how quality is measured and be aware of the different dimensions of quality.
C ONTINUOUS Q UALITY I MPROVEMENT M ODEL The Deming cycle: Originally developed by Walter Shewart, but renamed in 1950s because Deming promoted it extensively.
TQM. What does TQM mean? Total Quality Management means that the organization's culture is defined by and supports the constant attainment of customer.
Root Cause Tutorial Page 1 More on Hazard Identification Techniques 1.Identify potential hazards that could threaten the safety of your employees,
Problem Solving.
Seven Quality Tools The Seven Tools –Histograms, Pareto Charts, Cause and Effect Diagrams, Run Charts, Scatter Diagrams, Flow Charts, Control Charts.
1 Presentation Template: Instructor Comments u The following template presents a guideline for preparing a Six Sigma presentation. An effective presentation.
Measure : SPC Dedy Sugiarto.
Project Quality Management.  Define project quality management.  Describe quality planning and its relationship to project scope management.  Discuss.
Pareto Principle “The Vital Few and Trivial Many Rule” “Predictable Imbalance” “80:20 Rule”
Chapter 11 TQM & Quality Tools. Management 3620Chapter 11 TQM and Quality Tools11-2 Total Quality Management A philosophy that involves everyone in an.
OM7a -1TQM and Quality Tools Chapter 11 TQM & Quality Tools.
Introduction to Quality Improvement Tools We are what we repeatedly do. Excellence, then, is not an act but a habit. ARISTOTLE.
2 How to use the seven tools of quality Tools for identifying problems / collecting data Check sheets Scatter diagrams Statistical process control (SPC)
Organize verbal information into a visual one, generally by writing down on separate pieces of paper AFFINITY DIAGRAM A sequenced plan.
© Wiley Total Quality Management by Adnan khan.
Traditional Economic Model of Quality of Conformance
Chapter 13 Tools for Process Improvement MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1.
1 Chapter 6 Quality Tools. 2 The Seven Basic Quality Tools. Flowcharts Check Sheets Histograms Pareto Analysis Scatter Diagrams Control Charts Cause-and-Effect.
The seven traditional tools of quality I - Pareto chart II – Flowchart III - Cause-and-Effect Diagrams IV - Check Sheets V- Histograms VI - Scatter Diagrams.
THE 7 BASIC QUALITY TOOLS AS A PROBLEM SOLVING SYSTEM Kelly Roggenkamp.
Concept Generation & Problem Solving Tools by Özlem Aydın Çivi.
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
OPERATIONS MANAGEMENT Goods, Services and Value Chains MOHD FARHAN ISMAIL TEEBAN THATCHANAMURTHI ADAMU ABDULLAHI IDRISU ROSHASMAWI.
IMPROVEMENT TOOLS Mahendrawathi ER, Ph.D.
Lean Six Sigma DMAIC Improvement Story
Chapter 11 TQM & Quality Tools.
Quality Certification
Lean Six Sigma DMAIC Improvement Story
Quality Tools - 9/18/2018 Quality Tools -
Quality Improvement: Problem Solving
OPS/571 Operations Management
Lean Six Sigma DMAIC Improvement Story
Quality Improvement: Problem Solving
Root Cause Analysis: Why? Why? Why?
Quality Tools - 2/19/2019 Quality Tools -
DMAIC STANDARD WORK TEMPLATE
The 7 Basic Quality Tools ~ The DMAIC Process
DMAIC STANDARD WORK TEMPLATE
Chapter 10 Quality Improvement.
Presentation transcript:

Tumolo’s Toolbox 7 Step Improvement Process

Elements of process improvement and control Every process has three (3) elements 1. The area of discovery Understanding the customer requirements and developing the process to meet these requirements 2. The method of process control Assessing performance and variation 3. The element of improvement Problem solving and quality improvement

Process Improvement Opportunity or Problem Identification 7 Step Improvement Process Process Control

Improvement or Problem the in innovation insight invention inspiration intuition instinct prayer clairvoyance Copy Imitation consultation Benchmark Other world Inner self Improvement or Problem others delegation negotiation just waiting passing-the-buck confusing finger pointing transferring real world gut feel systematic PDCA 7 Steps random trial-and-error guess accident chance luck

PDCA 7 STEP 7 QC Tools 1. Select a Theme 2. Collect Data 3. Analyze causes/opportunities 4. Plan and implement solution / improvement 5. Evaluate effects 6. Standardize 7. Reflect on process Check sheet, graph, Histogram, scatter diagram, Pareto diagram, cause-and-effect diagram, flowcharts Flowcharts run chart/control chart Flowchart PLAN DO CHECK ACT (provides repetition) (provides process) (provides tools)

7 Step improvement process 1. Select Theme 2. Collect Data 3. Analyze Causes 4. Plan Solution and Implement 5. Evaluate 6. Standardize 7. Reflect on Process Focus on weakness Thoroughly explore the problem/opportunity Carefully select the theme Clearly state the theme Have weakness orientation State as a problem/gaps, not a solution State in terms of results

Selecting the theme Weakness is difference between current situation and the target. Weakness orientation focuses on eliminating weakness as basis of improvement (Closing the Gap). } } Current Customer Need Weakness Weakness Target Actual Performance Focus on facts, processes, and root causes

7 Step improvement process Define your data collection process Appropriate to process Multi-variable data Analyze the data Stratification Graphics Focus on deviation Draw a logical conclusion Based on facts Focus on vital few 1. Select Theme 2. Collect Data 3. Analyze Causes 4. Plan Solution and Implement 5. Evaluate 6. Standardize 7. Reflect on Process “Primary tool used is Pareto Diagram

Frequently used data collection tools CHECKSHEET PARETO DIAGRAM CONTROL CHART GRAPH (RUN CHART) HISTOGRAM Used to systematically collect data or tabulate data. (e.g. frequency of occurrence of defect types) Excellent method to identify vital few. (2 levels minimum) (e.g. Percent of failures due to various defect types arranged in descending order of occurrence) Method to identify non-standard process variation (e.g. Solder paste height versus time) Method to identify trends in data (e.g. In circuit test yield versus time) Method to identify distribution of the data (e.g. Number or solder paste observations falling into various height ranges)

7 Step improvement process Create cause-and-effect diagram from Pareto Investigate cause thoroughly Draw logical conclusions (i.e. supported by data) 1. Select Theme 2. Collect Data 3. Analyze Causes 4. Plan Solution and Implement 5. Evaluate 6. Standardize 7. Reflect on Process Ask Why?5 times

ASK 5 WHYS to get to the proper level of analysis and causes. 100% 4th why 2nd why Methods Material Pareto Diagram 5th why 3rd why 1st why A Man Machine Cause effect Diagram A B C D E F ASK 5 WHYS to get to the proper level of analysis and causes. Segment by 4 Ms Man Machine Methods Material

Verifying Root Causes Collect data on root causes Use run charts, Pareto, Graphs, scattergrams, etc. to determine strength of correlation between root cause and problem If verification fails to validate choices, return to diagram and choose new root causes to verify.

7 Step improvement process Focus on the primary root causes Focus on solution which you can implement Dont try to fix everything at once Involve those who will be affected Run a controlled experiment (Pilot) 1. Select Theme 2. Collect Data 3. Analyze Causes 4. Plan Solution and Implement 5. Evaluate 6. Standardize 7. Reflect on Process

Solectron Criteria Effectiveness Feasibility Total Score A tool to help determine which solution is best. Solution 1 Solution 2 Solution 3 Solution 4 ------- Scoring values = HIGH = MEDIUM = LOW Possible score 3 or 2 or 1 values 6 3

A tool to help determine ease or difficulty in solving specific problems. Area of Problem Equipment Methods Human Behavior You You and Others Easy Easy Difficult Data Collection/ Potential solution implementation Moderately Moderately Very Difficult Difficult Difficult Very Difficult Difficult Difficult

Solution Implementation What When Where Who How How will they get it done Who is responsible for doing it Where will it be done When will it be done What will be done

7 Step improvement process Confirm improvement (Before and after comparison) Evaluate all subsequent effects Measure improvement gains over time 1. Select Theme 2. Collect Data 3. Analyze Causes 4. Plan Solution and Implement 5. Evaluate 6. Standardize 7. Reflect on Process

} } Original Pareto “BEFORE Improvement New Pareto “AFTER 100% Pareto Diagram Effect on Root Cause “Fewer defects A B C D E F

7 Step improvement process Move from PDCA to SDCA cycle Revise the standard Create a process to detect future problems 1. Select Theme 2. Collect Data 3. Analyze Causes 4. Plan Solution and Implement 5. Evaluate 6. Standardize 7. Reflect on Process

Standardization PDCA SDCA New Std Do Std Do Plan Act Act Check Check Control Improvement

7 Step improvement process Analyze strengths and weaknesses Determine the next problem Document the Quality improvement story Identify the critical difficulties during the process - using tools, etc. Identify the critical strengths Identify the key things the team would do differently Identify what key things the team needs to learn to improve the 7 step process. 1. Select Theme 2. Collect Data 3. Analyze Causes 4. Plan Solution and Implement 5. Evaluate 6. Standardize 7. Reflect on Process