The 23 rd MICE Collaboration Meeting -1- ICST/HIT Jan.13 to 17, Harbin/China Large Prototype Coil Test and Plan 2009-01-15 Fengyu Xu Institute of Cryogenics.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

MICE Coupling Coil Testing at Fermilab MICE Collaboration Meeting Ruben Carcagno March 15, R. Carcagno - MICE CC Testing at Fermilab3/15/2012.
Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
MICE Superconducting Solenoids: Status and Update RAL: T W Bradshaw M Courthold J Rochford M Hills D Baynham Oxford: J Cobb W Lau S Yang MICE.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
MUTAC Review, 9 April MuCOOL and MICE Coupling Magnet Status Michael A. Green Lawrence Berkeley Laboratory Berkeley CA
Magnet quench during a training run Magnet electrical circuit schematic PROGRESS ON THE MODELING AND MODIFICATION OF THE MICE SUPERCONDUCTING SPECTROMETER.
UPDATE of RFCC MOUDLE Derun Li, Steve Gourlay Lawrence Berkeley National Laboratory MICE MICO Meeting December 21, 2011.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
Progress on the MICE Cooling Channel Solenoid Magnet System
-1- Wang, Li The 23rd MICE Collaboration Meeting to 17 HIT/CHINA WANG, Li Institute of Cryogenics and Superconductivity Technology.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
1 Update on Focus Coil Design and Configuration M. A. Green, G. Barr, W. Lau, R. S. Senanayake, and S. Q. Yang University of Oxford Department of Physics.
1 The Genoa Tracker Solenoids and their Contribution toward a New Design Michael A. Green Lawrence Berkeley National Laboratory and Pasquale Fabbricatore.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
-1- ICST/HIT The 23 rd MICE Collaboration Meeting Jan.13 to 17, Harbin/China MICE/MuCool Coupling Magnets Vacuum Vessel Design Guo, Xinglong.
12 March 2006NFMCC Meeting, IIT, Chicago1 Progress on the MICE Cooling Channel and Tracker Magnets Michael A. Green Lawrence Berkeley Laboratory.
CM-18 June Magnet Conductor Parameters and How They affect Conductor Selection for MICE Magnets Michael Green Lawrence Berkeley Laboratory Berkeley.
1 Progress on the MICE Cooling Channel Magnets Michael A. Green Lawrence Berkeley National Laboratory 28 June 2005.
MICE Magnets - Virostek 11 MICE Magnets Steve Virostek Engineering Division Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
RF Cavity / Coupling Coil Module
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Status of CEPC Detector magnet
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
Overview of the KSTAR commissioning M. Kwon 3 June, 2008.
Spectrometer Solenoid Test Plan Workshop: Spectrometer Solenoid Overview Steve Virostek - LBNL February 17, 2012.
Progress on MICE/MuCool Coupling Magnets -1- CM20/UK, ICST/HIT Progresson MICE/MuCool Coupling Magnets Li Wang Institute of Cryogenics.
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
Superconducting IR Magnets CHEN, Fusan May 11, 2007.
1 WANG,Li/SINAP WANG Li, WANG ShuHua, LIU YiYong, SUN Sen, HU Xiao, YIN LiXin Shanghai Institute of Applied Physics, CAS, Shanghai , China Shanghai.
Preliminary Design for the Coupling Coil Cryostat in MICE
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
MICE Cooling Channel Magnets: Spectrometer Solenoid Procurement RF Module Coupling Coil Proposal Steve Virostek Lawrence Berkeley National Lab NFMCC 07.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
MICE/MuCool Coupling Magnets to 22 ICST/HIT MICE/Muool Coupling Magnets Progress Li Wang for MICE Group Institute of Cryogenics.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
MICE RF Coupling Coil Magnets Update Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory October 6, 2010 Sofia, Bulgaria.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
MICE/MuCool Coupling Magnets ICST/HIT Progress and Schedule for the MICE/MuCool Coupling Coil Project HIT MICE CC Project Group.
Progress on MICE RFCC Module for the MICE Experiment * Allan DeMello, Nord Andresen, Michael Green, Derun Li, Heng Pan, Steve Virostek, Michael Zisman.
Status of MICE Coupling Coil Magnets D. Li and M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory February 16, 2011 MICE CM29-Rutherford.
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
CLOSING REMARKS. Following the Review Charge Cryo-Design  Review and comment on the overall cooling circuit and overall cryo-design. u Temperature Margin.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
Thermal screen of the cryostat Presented by Evgeny Koshurnikov, GSI, Darmstadt September 8, 2015 Joint Institute for Nuclear Research (Dubna)
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
MICE CC TEST, IN PROGRESS M. Tartaglia For the FNAL/LBNL Test Team 9/27/13.
Max-Planck-Institut für Plasmaphysik 1 ICEC 26- ICMC 2016 March 7-11, 2016, New Delhi, India Michael Nagel Cryogenic commissioning, cool down and first.
S A Griffiths CM42 June 2015 Electrical & Control.
Design ideas for a cos(2q) magnet
Instrumentation for status monitoring of SST-1 superconducting magnets
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
AEGIS Magnet System.
Spectrometer Solenoid Update
MICE Coupling Coil Update
OPERATING STATUS OF BES SUPERCONDUCTING MAGNET
Presentation transcript:

The 23 rd MICE Collaboration Meeting -1- ICST/HIT Jan.13 to 17, Harbin/China Large Prototype Coil Test and Plan Fengyu Xu Institute of Cryogenics and Superconductivity Technology Harbin Institute of Technology, Harbin, China

-2- Jan.13 to 17, Harbin/China ICST/HIT The 23 rd MICE Collaboration Meeting Content Fabrication of Large Prototype Coil Test for Large Prototype Coil Next Plan for Large Coil Test

-3- Jan.13 to 17, Harbin/China ICST/HIT The 23 rd MICE Collaboration Meeting Winding machine Guider Tension regulator Tension holder Dereeler Storage spool Fabrication of Large Prototype Coil Winding System Winding system can run either in forward or backward directions, which makes it possible and easy for winding the conductor joints into the coil and welding the cover plate to the coil mandrel. Automatic guider made operation easier. Tension control configuration is effective during all operation processes. Winding system can be re-configured to facilitate the cover-plate-welding procedure.

-4- Jan.13 to 17, Harbin/China ICST/HIT The 23 rd MICE Collaboration Meeting Winding Procedure Wet-winding technology was adopted for the large coil by ICST. Coil test technology (resistance, coil-to-ground insulation, layer diameter etc.) during the winding process was studied and improved with different methods and the method to be used for MuCool coil winding was determined then. Making and winding technology of conductor joints were developed and applied for the large prototype coil.

-5- Jan.13 to 17, Harbin/China ICST/HIT The 23 rd MICE Collaboration Meeting Cover-Plate-Welding Procedure Procedures and parameters for coil cold mass assembly welding were studied. MIG technology was adopt for welding of cover plate and cooling tubing. TIG was used for helium vessel welding. Pre-heating to the whole coil assembly before performing the welding was controlled in the range of 60 o C~80 o C. Water cooling was used to limit the mandrel’s temperature around the welding spots so as to protect the coil temperature from above 130 o C. The measured temperature on the mandrel surface of the nearest spot to the coil was less than 90 o C during the welding.

-6- Jan.13 to 17, Harbin/China ICST/HIT The 23 rd MICE Collaboration Meeting Comments A winding system was developed and continuously improved during test coils’ winding. Wet-winding technology was adopted for large coil, and all the materials used for the winding were verified. SC joints making and winding technology was developed, and there are 4 joints with overlapping length of 1 m wound into the large coil at the both coil ends. Four-sectioned passive quench protection circuit was adopted in the large coil. Cover-plate-weld procedure was studied and performed in order to protect the coil temperature from above 130 o C. In-direct cooling method is used for the large coil through cooling tubing. All technologies that were developed and adopted in the large prototype coil will be validated by large coil test results.

-7- Jan.13 to 17, Harbin/China ICST/HIT The 23 rd MICE Collaboration Meeting Test for Large Prototype Coil Expected Testing Results Magnet training process will be performed and it is expected that the maximum energizing current can reach at 350~400A, then the coil stress can reach at a level of the coupling coil based on the calculations. The quench protection assembly and superconducting interleads, that were designed with thermal conductive cooling, will be expected to effectively work at different operation phases, e.g., charging, discharging, normal operation, and quench. Current decay and voltages in quench process will be measured. The main parameters of large coil, e.g. self-inductance, mutual inductance, and relationship of central magnetic field vs. current are expected to be measured. For back-to-back diode pair operated at 4.2K, their leakage currents at different voltages will be expected to be measured in charging and discharging phases.

-8- Jan.13 to 17, Harbin/China ICST/HIT The 23 rd MICE Collaboration Meeting Progress on Test Preparation – Cold Mass and Testing Cryostat Cold mass pre-mounting was done. Vacuum-leakage check of vacuum vessel was performed and bayonet O-ring leak was found and fixed. An additional copper plate and cooling tube will be mounted at the cold ends of current leads to increase cooling area based on calculation.

-9- Jan.13 to 17, Harbin/China ICST/HIT The 23 rd MICE Collaboration Meeting Progress on Testing Preparation – Cryogenic Control System LabVIEW VISA server OPC server Run-time database Model 218 Cryo-temperature sensors PLC Pressure, level, vacuum, temperature, control valve, on-off valve, voltage RS-232 Serial Interface MPI field bus PLC Modules Temperature Monitor SC Level Monitor Dual-channel Vacuum Monitor

-10- Jan.13 to 17, Harbin/China ICST/HIT The 23 rd MICE Collaboration Meeting

-11- Jan.13 to 17, Harbin/China ICST/HIT The 23 rd MICE Collaboration Meeting Progress on Testing Preparation – Magnet Monitoring System We have two power supplies can be used to energize the magnet. Rapid discharge circuit is canceled in order to avoid passive quench protection circuit break-over, and the protective diode of power supply will be a part of circuit in discharging phase. Considering fault modes, e.g. power failure and refrigerator failure, a switch is put into the circuit loop, and an UPS is required.

-12- Jan.13 to 17, Harbin/China ICST/HIT The 23 rd MICE Collaboration Meeting LabVIEW DAQ Card Fast Data Storage Field DAQ Programmer Power SupplyMagnet Slow Data Storage SC Level Monitor Field DAQ Programmer Power supply

-13- Jan.13 to 17, Harbin/China ICST/HIT The 23 rd MICE Collaboration Meeting

-14- Jan.13 to 17, Harbin/China ICST/HIT The 23 rd MICE Collaboration Meeting Next Plan for Large Coil Test It is expected that To complete software and hardware commissioning of magnet monitoring system by Jan. 18, 2009 To complete quench protection assembly test and to mount it onto the cold mass by Jan. 22, 2009 To complete current lead modification, connecting cooling tubes inside test cryostat and checking vacuum leakage by Jan. 24, 2009 To submit LBNL the test procedure for large coil for approval by Feb. 8, 2009 To complete mounting temperature sensors, voltage taps and feed-through by Feb. 9, 2009 (from Jan. 25 to Jan. 31 is Chinese Spring Festival)

-15- Jan.13 to 17, Harbin/China ICST/HIT The 23 rd MICE Collaboration Meeting To complete cryostat assembly and vacuum/helium leak check by Feb. 15, 2009 To complete all preparation work for starting up refrigerator (piping connection, helium leakage check, purge and pumping etc.) by Feb. 25, 2009 To start the cool down for the refrigerator system and large coil test system from Feb.26, 2009 to Mar. 3 rd, 2009 To perform the test (charge, training, discharge, etc.) during the period from Mar. 3rd to Mar. 8, 2009 To submit LBNL the test results around the middle of March, 2009

The 23 rd MICE Collaboration Meeting -16- ICST/HIT Jan.13 to 17, Harbin/China Click to edit company slogan. Icst.hit.edu.cn