Timeline on the laser setup Show a conceptual design on the metal box, 2 iterations Check design, i.e. all details fit the actual physical constraints,

Slides:



Advertisements
Similar presentations
Systems Approach Universal System INPUT PROCESS OUTPUT
Advertisements

1 st Place Post-Secondary Winner. 2 nd Place Post-Secondary Winner.
Holey Fibers Suchita Kaundin. Agenda Background What are Holey Fibers Physical Structure Fabrication Properties Advantages Applications Industries References.
Timeline on the laser setup Show a conceptual design on the metal box, 2 iterations Check design, i.e. all details fit the actual physical constraints,
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
DT211 Stage 2 Software Engineering
MICE Target Status Chris Booth Sheffield 10 th May 2006.
Conceptual Design Review Senior Design University of Idaho College of Engineering.
Timeline on the laser setup Show a conceptual design on the metal box, 2 iterations Check design, i.e. all details fit the actual physical constraints,
STATUS of 6m ANTENNA BASE Matt Fleming 8/24/04 Note 6m = BIMA.
They aren’t just bohr-ring drawings!.  Bohr models are a way of showing the electrons in an atom.  Electrons are arranged in energy levels. In actual.
Low noise Fused Silica suspensions: from the GEO600 experience to the 2 nd generation requirements Geppo Cagnoli INFN Sez. Firenze University of Glasgow.
FNAL testbeam planning Jan 27, 2014 Alain Bellerive.
Special Cases of Factoring Chapter 5.5 Perfect Square Trinomials a 2 + 2ab + b 2 (a + b) 2 = a 2 – 2ab + b 2 (a – b) 2 =
How to Draw Bohr Diagrams. Bohr Diagrams 1) Find your element on the periodic table. 2) Determine the number of electrons – it is the same as the atomic.
CHAMPS Technology Srl World Leader Manufacturer of INSPECTION MACHINES.
By Mrs. Wright. Life Science Standards: LS4 (5-8) POC-12 Describe the major changes that occur over time in human development from single cell through.
Current Status of Pepperpot Emittance Measurement System Simon Jolly Imperial College FETS Meeting, 22/02/06.
Some thoughts on Tracking System for Stage 1 HPS Simon Kwan Fermilab 09/19/2011.
ENGINEERING GRAPHICS By R.Nathan Assistant Professor Department of Mechanical Engineering C.R.ENGINEERING COLLEGE Alagarkovil, Madurai I - SEMESTER.
Name _______Lesson 4A – Making Electricity Gr.6 __ By Making a Battery Watch the Google Video, “Build a Lemon Battery”, then answer the following:
 Life Expectancy is 180 th in the World.  Literacy Rate is 4 th in Africa.
Vacuum chamber fabrication Dates refer to end of fabrication, then 8 weeks are to be added for NEG coating, bake-out, acceptance tests, etc. EN-MME LNR.
1 Electronic Invoice Processing. 2 We have change the way we process invoices. These changes have provided better efficiencies for handling and processing.
LCMLeastCommonMultiple A Multiple of a number is the product of that number and a nonzero whole number. 2 x 1 = 2 2 x 2 = 4 2 x 3 = 6 2, 4, 6 are multiples.
Watch the Google Video, “Build a Lemon Battery”, then answer the following: Name ______ 6__Lesson 4A – Making.
MICROMACHINING TECHNOLOGY. Introduction Micromachining is used to create parts of size in the order of meters. Materials on a micrometer-scale possess.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
Design for a New Optical Table of the Shintake Monitor Takashi Yamanaka The University of Tokyo ATF2 weekly meeting 2007/9/26.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Camera Motion System Requirement Design Details FEA.
AS Level Computing 8 CHAPTER: Fundamentals of structured programming The basics of good programming Algorithms System Flow Charts Symbol Conventions Steps.
M1M3 Fan Coil Unit Status Gary Muller & Brian Johnson LSST 2017 Project & Community Workshop 8/17/2017.
BM&N STS ladders assembly in VLHEP
Four OTR Tasks.
DESIGN BRIEF: BRIDGE Design a bridge to span a 500mm gap and support a weight no less than 150g and no more than 250g.
SciFi option for neutrino target tracker
Production and commissioning of the 2nd BGC
Diffuser status October 2017
VOLUME The volume of a 3D shape is the amount of space within that solid.
CYRIC beam Line (actual setup)
Test box for ProtoDUNE SP – Integration Test
They aren’t just bohr-ring drawings!
Grade one First term Second term Learning unit Learning unit
Molecular Imaging System Upgrade: Hardware System Capabilities
4n + 2 1st term = 4 × = 6 2nd term = 4 × = 10 3rd term
Periodic Table Study Guide
Periodic Table Study Guide
How to Make a Bohr Model.
Bohr Diagrams Rules and Directions.
Periodic Table Study Guide
Periodic Table Study Guide
Periodic Table Study Guide
How to Draw Bohr Diagrams
Mitosis Microscope Lab
Periodic Table How to Draw Bohr Diagrams
Periodic Table Study Guide
How to Draw Bohr Diagrams
Electron Energy Levels
Laser Mount.
How to Draw Bohr Diagrams
Periodic Table Study Guide
Periodic Table Study Guide
Project title Name Date.
BGC Collaboration Meeting –
Scratch – Game Testing My Game Creation.
Making Bohr Models These models show where the protons, neutrons, and electrons are located.
Periodic Table Study Guide
1310/1550 High Power Single Stage Optical Isolator (patent pending)
Presentation transcript:

Timeline on the laser setup Show a conceptual design on the metal box, 2 iterations Check design, i.e. all details fit the actual physical constraints, size the flange, bellows, rod, etc… Draw each part with all its dimensions –1 st set of drawings sent to machine shop –2 nd set of drawings also sent to machine shop –3 rd set contains the holder and flange (for belows) details Order parts –Handles (2) –Hinges (3) –Bellows (2) –Screws (100) Fabricate the pieces in machine shop (~2weeks)

On the way Construct-assemble (~1week) –Test light-tightness –Setup gas and flow if needed Familiarizing with the X-Y stage control software –Use a diode before working on the sensor. –Test the position resolution ?? Start on DAQ and electronics. Measure the first sensor

The optic fiber holder

The flange