Hilton Maher Selto. 17 Flexible Budgets, Overhead Cost Management, and Activity-Based Budgeting McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc.,

Slides:



Advertisements
Similar presentations
Chapter 11 Flexible Budgeting and the Management of Overhead and Support Activity Costs Chapter 11: Flexible Budgeting and the Management of Overhead and.
Advertisements

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Standard Costing and Variances
Flexible Budgets and Performance Analysis Chapter 10 McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Chapter Eleven Flexible Budgets and Overhead Analysis.
Standard Costing: A Managerial Control Tool
Cost Variances for Fixed and Variable Overhead Variances for Variable Overhead Variances for Fixed Overhead.
Hilton Maher Selto. 3 Cost Accumulation for Job-Shop & Batch Production Operations McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights.
Hilton Maher Selto. 16 Standard Costing, Variance Analysis, and Kaizen Costing McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved.
Overhead Budgets n Most companies use flexible budgets to control overhead costs. –A flexible budget is not based on only one level of activity but is.
Flexible Budgets and Overhead Analysis Chapter 11.
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Flexible Budgets and Overhead Analysis Chapter Eleven.
1-1.
Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Fundamentals of Variance Analysis Chapter 16 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Blocher,Stout,Cokins,Chen, Cost Management 4e ©The McGraw-Hill Companies 2008 The Flexible Budget: Factory Overhead Chapter Fourteen.
Copyright  2003 McGraw-Hill Australia Pty Ltd, PPTs t/a Management Accounting: An Australian Perspective 3/e by Langfield-Smith, Thorne & Hilton Slides.
Chapter 11 Standard costs for control: flexible budgets and manufacturing overhead.
13-1 CHAPTER 13 McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved. Cost Accounting and Reporting Systems.
Financial and Managerial Accounting
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 17 Flexible Budgets, Overhead Cost Management, and Activity-Based.
CHAPTER 8 Performance Evaluation. The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-2 Learning Objective LO1 To describe flexible and static budgets.
Chapter 23 Flexible Budgets and Standard Cost Systems
Copyright © The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 11 th Edition Chapter 11.
Factory Overhead Planned, Applied & Actual
Ch.11 Exercises Norwall Company’s Flexible budget manufacturing overhead (in condensed form) is given below : The following information is available for.
Principles of Managerial Accounting Chapter 11. Static Budget Set at the beginning of a budgeting period and that is geared to only one level of activity.
Standard Costing, Variance Analysis, and Kaizen Costing.
Standard Costing and Variance Analysis
Flexible Budget, Overhead Cost Variances and Management Control Lecture 19 1 Readings Chapter 8,Cost Accounting, Managerial Emphasis, 14 th edition by.
Variances Short summary. Static Budgets A static budget ( master budget) is prepared for only one level of a given type of activity. All actual results.
Flexible Budgets and Standard Costs Chapter 23 HORNGREN ♦ HARRISON ♦ BAMBER ♦ BEST ♦ FRASER ♦ WILLETT.
Overhead and Marketing Variances Chapter Thirteen.
Chapter 11 Standard costs for control: flexible budgets and manufacturing overhead 11-1 Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides.
McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e By Kim Langfield-Smith 11-1.
ACC3200 STANDARD COSTING.
Chapter 16 Fundamentals of Variance Analysis.
Flexible Budgeting Chapter 07, 08
Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
24 - 1©2002 Prentice Hall, Inc. Business Publishing Accounting, 5/E Horngren/Harrison/Bamber Flexible Budgets and Standard Costs Chapter 24.
The Islamic University –Gaza
1 Chapter 10. Standard Costs. M11-Chp-10-1-Standard-Costs Edited May 24, Copyright © 2011, Dr. Howard Godfrey This file contains illustrative.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition McGraw-Hill/Irwin Copyright © 2011.
Chapter 22. Prepare a flexible budget for the income statement.
12-1 Introduction to Product Costing Prepared by Douglas Cloud Pepperdine University Prepared by Douglas Cloud Pepperdine University 12.
Copyright © The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 11 th Edition Chapter 11.
Flexible Budgeting and Analysis of Overhead Costs CHAPTER 11 Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution.
Chapter 17 Overhead Cost Management Flexible Budgets.
Chapter 23 Flexible Budgets and Standard Cost Systems.
Flexible Budgets and Standard Costs Chapter 24. Objective 1 Prepare a Flexible Budget for the Income Statement.
JOB ORDER COSTING IS USED IN A MANUFACTURING ENVIRONMENT. THERE ARE UNIQUE CHALLENGES TO RECORD JOURNAL ENTRIES, MAINTAIN THE JOB ORDER COST SHEET AND.
McGraw-Hill/Irwin © 2007 The McGraw-Hill Companies, Inc., All Rights Reserved CHAPTER 13 McGraw-Hill/Irwin © 2007 The McGraw-Hill Companies, Inc.,
Chapter 11 Standard costs for control: flexible budgets and manufacturing overhead.
Chapter 19 Manufacturing Overhead Standard Costs: Completing the Accounting Cycle for Standards costs.
ACC602: Strategic Management Accounting Topic 3: Standard costs for control measures: flexible budgets and manufacturing overhead analysis Slides adapted.
Job Order and Process Costing
Job Order Costing Job Order costing is used in a
Flexible Budgets and Overhead Analysis
17 Flexible Budgets, Overhead Cost Management, and Activity-Based Budgeting.
Flexible Budgets and Overhead Analysis
Flexible Budgets and Overhead Analysis
Chapter 11 Standard costs for control: flexible budgets and manufacturing overhead Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a.
Systems Design: Job-Order Costing
Flexible Budgets and Overhead Analysis
Standard Costs and Variances
Flexible Budgets and Overhead Analysis
Chapter 11 Flexible Budgeting and the Management of Overhead and Support Activity Costs.
Presentation transcript:

Hilton Maher Selto

17 Flexible Budgets, Overhead Cost Management, and Activity-Based Budgeting McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved.

17-3 A flexible budget is valid for a range of activity A flexible budget is valid for a range of activity A static budget is based on a particular planned level of activity A static budget is based on a particular planned level of activity This range of activity is the relevant range This range of activity is the relevant range A flexible overhead budget is defined as a detailed plan for controlling overhead cost valid in the firm’s relevant range of activity A flexible overhead budget is defined as a detailed plan for controlling overhead cost valid in the firm’s relevant range of activity What Are Flexible Overhead Budgets?

17-4 Based on planned June production of 4,000 tents, at 1.5 machine hours per tent. We cannot tell from this budget what it would cost to make 3,000 tents. Based on planned June production of 4,000 tents, at 1.5 machine hours per tent. We cannot tell from this budget what it would cost to make 3,000 tents. Based on only ONE anticipated activity level Based on only ONE anticipated activity level Includes several possible activity levels Static Budget Versus Flexible Budget Exh. 17-1

17-5 Actual Electricity Cost Actual Electricity Cost Budgeted Electricity Cost (static budget) Budgeted Electricity Cost (static budget) $1,050 $1,200 The manager is comparing the electricity cost incurred at the ACTUAL activity level (3,000 tents) with the budgeted electricity cost at the PLANNED activity level (4,000 tents). These activity levels are different, therefore we would expect the electricity cost to be different Advantages Of Flexible Budgets Cost Variance $150 Favorable

17-6 Actual Electricity Cost Actual Electricity Cost Budgeted Electricity Cost (flexible budget) Budgeted Electricity Cost (flexible budget) Cost Variance $1,050 $900 $150 Unfavorable The manager is comparing the electricity cost incurred at the ACTUAL activity level, 3,000 tents with the budgeted electricity cost at the ACTUAL activity level, (3,000 tents x 1.5 machine hours) = 4,500 machine hours Electrical cost was greater than it should have been, given the actual level of output Advantages Of Flexible Budgets

17-7 Output measures require different inputs Output measures can be used if you only make one product Flexible budget must be based on outputs that can be compared Activity Measure: Based On Input Or Output

standard allowed machine hours per tent 1.5 standard allowed machine hours per tent Usually not a meaningful measure in a multi-product firm because it would require us to add numbers of unlike products Usually not a meaningful measure in a multi-product firm because it would require us to add numbers of unlike products Output is measured in terms of the standard allowed input, given actual output Flexible Budgets: Inputs Versus Outputs

17-9 If you recall, this is similar to the Predetermined Cost-Driver Rate discussed in Chapter 4.. EXAMPLE Assume that the company needs flexible budget numbers for three activity levels: 4,500 hours, 6,000 hours, and 7,500 hours. Also, assume that the Predetermined Budgeted Variable-Overhead Cost per Activity Unit is $6 per hour. Budgeted Fixed-Overhead Cost for the month is $30,000. EXAMPLE Assume that the company needs flexible budget numbers for three activity levels: 4,500 hours, 6,000 hours, and 7,500 hours. Also, assume that the Predetermined Budgeted Variable-Overhead Cost per Activity Unit is $6 per hour. Budgeted Fixed-Overhead Cost for the month is $30,000. Flexible Budget? Formula Flexible Budget

17-10 The flexed total budgeted monthly overhead for each activity level can now be used effectively in planning and variance analysis. Formula Flexible Budget

17-11 Manufacturing OverheadWork-in-Process Inventory Actual overhead Applied overhead Actual hours Predetermined overhead rate X Applied overhead Actual hours Predetermined overhead rate X Overhead Application - Normal Costing The Difference between Normal Costing and Standard Costing lies in the quantity of hours used The Difference between Normal Costing and Standard Costing lies in the quantity of hours used Exh. 17-4

17-12 Manufacturing OverheadWork-in-Process Inventory Actual overhead Applied overhead Standard allowed hours Predetermined or standard overhead rate X Applied overhead Standard allowed hours Predetermined or standard overhead rate X Overhead Application - Standard Costing The Difference between Normal Costing and Standard Costing lies in the quantity of hours used The Difference between Normal Costing and Standard Costing lies in the quantity of hours used Exh. 17-4

17-13 Both normal-costing and standard-costing systems use an overhead rate computed at the beginning of the accounting period (predetermined overhead rate) Computed annually Predetermined Overhead Rates Exh. 17-5

17-14 Choice Of Activity Measure How should the cost manager select the activity measure for the flexible budget? The variable overhead cost and the activity measure should move together The variable overhead cost and the activity measure should move together Direct labor time has traditionally been the most popular activity measure in manufacturing firms Direct labor time has traditionally been the most popular activity measure in manufacturing firms As automation increases, more firms are switching to machine hours or process time As automation increases, more firms are switching to machine hours or process time Dollar measures, such as direct-labor or material costs can be misleading because they are subject to price-level changes and other fluctuations

17-15 Koala manufactured 3,000 tree line tents X 1.5 machine hours per tent = standard allowed 4,500 machine hours Koala manufactured 3,000 tree line tents X 1.5 machine hours per tent = standard allowed 4,500 machine hours Actual machine hours for June = 4,800 Actual machine hours for June = 4,800 The total variable overhead variance for June = Actual variable overhead $30,480 Budget variable overhead $27,000 $ 3,480 F The total variable overhead variance for June = Actual variable overhead $30,480 Budget variable overhead $27,000 $ 3,480 F Overhead Cost Variances For standard allowed 4,500 machine hours the budget overhead (from Exhibit 17-3) for June = Variable overhead $27,000 Fixed overhead $30,000 For standard allowed 4,500 machine hours the budget overhead (from Exhibit 17-3) for June = Variable overhead $27,000 Fixed overhead $30,000 From the cost accounting records, the actual overhead for June = Variable overhead $30,480 Fixed overhead $32,500 $62,980 From the cost accounting records, the actual overhead for June = Variable overhead $30,480 Fixed overhead $32,500 $62,980

17-16 The VARIABLE-OVERHEAD SPENDING VARIANCE is the difference between the actual variable overhead cost and the product of the standard variable -overhead rate and the actual hours of an activity base (or cost driver) The VARIABLE-OVERHEAD SPENDING VARIANCE is the difference between the actual variable overhead cost and the product of the standard variable -overhead rate and the actual hours of an activity base (or cost driver) Variable Overhead Variances Exh. 17-6???????? 4,800 machine hours 4,800 machine hours $6.35 per machine hour $6.35 per machine hour 4,800 machine hours 4,800 machine hours $6.00 per machine hour $6.00 per machine hour Actual variable overhead Actual machine hours (AH) Actual machine hours (AH) Actual rate (AVR) Actual rate (AVR) Actual machine hours (AH) Actual machine hours (AH) Standard rate (SVR) Standard rate (SVR) Actual machine hours × the standard rate $30,480 $28,800 $1,680 Unfavorable Variable-overhead spending variance $1,680 Unfavorable Variable-overhead spending variance

17-17 $27,000 $28,800 ???? The VARIABLE-OVERHEAD EFFICIENCY VARIANCE is the difference between the actual and the standard hours of an activity base (or cost driver) multiplied by the standard variable overhead rate The VARIABLE-OVERHEAD EFFICIENCY VARIANCE is the difference between the actual and the standard hours of an activity base (or cost driver) multiplied by the standard variable overhead rate Flexible budget: variable overhead Flexible budget: variable overhead Standard allowed machine hours (SH) Standard allowed machine hours (SH) Standard rate (SVR) Standard rate (SVR) Actual machine hours (AH) Actual machine hours (AH) Standard rate (SVR) Standard rate (SVR) Actual machine hours times the standard rate Actual machine hours times the standard rate Variable Overhead Variances 4,500 machine hours 4,500 machine hours $6.00 per machine hour $6.00 per machine hour 4,800 machine hours 4,800 machine hours $6.00 per machine hour $6.00 per machine hour Exh $1,800 Unfavorable Variable-overhead efficiency variance $1,800 Unfavorable Variable-overhead efficiency variance

17-18???? The flexible budget amount for variable overhead $27,000 is the amount that will be applied to Work-in-Process for product-costing purposes The flexible budget amount for variable overhead $27,000 is the amount that will be applied to Work-in-Process for product-costing purposes Flexible budget: variable overhead Flexible budget: variable overhead Standard allowed machine hours (SH) Standard allowed machine hours (SH) Standard rate (SVR) Standard rate (SVR) Variable overhead applied to work in process Variable overhead applied to work in process $27,000 Standard allowed machine hours (SH) Standard allowed machine hours (SH) Standard rate (SVR) Standard rate (SVR) 4,500 machine hours 4,500 machine hours $6.00 per machine hour $6.00 per machine hour 4,500 machine hours 4,500 machine hours $6.00 per machine hour $6.00 per machine hour No difference Variable Overhead Variances Exh $27,000

17-19? The unfavorable variance resulting from using more machine hours than the standard quantity, given actual output The unfavorable variance resulting from using more machine hours than the standard quantity, given actual output The actual labor rate per hour differs from the standard rate The actual labor rate per hour differs from the standard rate Efficiency variance Spending variance The variable overhead efficiency variance has nothing to do with efficient or inefficient use of variable overhead items The variable overhead efficiency variance has nothing to do with efficient or inefficient use of variable overhead items An unfavorable variance means that the total actual cost of variable overhead is > expected, after adjusting for the actual quantity of machine hours used An unfavorable variance means that the total actual cost of variable overhead is > expected, after adjusting for the actual quantity of machine hours used The spending variance is the real control variance for variable overhead The spending variance is the real control variance for variable overhead How To Interpret The Variable Overhead Variances

17-20 The FIXED-OVERHEAD BUDGET VARIANCE is the difference between actual fixed overhead and budgeted fixed overhead The FIXED-OVERHEAD BUDGET VARIANCE is the difference between actual fixed overhead and budgeted fixed overhead Fixed-overhead budget variance Actual Fixed overhead Budgeted fixed overhead =- Fixed-overhead budget variance Actual Fixed overhead = $32,500 Budgeted fixed overhead = $30,000 =- Unfavorable variance of $2,500, because we spent more than budgeted Unfavorable variance of $2,500, because we spent more than budgeted Fixed Overhead Budget Variance

17-21 The FIXED-OVERHEAD VOLUME VARIANCE is the difference between budgeted fixed overhead and actual fixed overhead. Assume that the predetermined fixed overhead per machine hour = $5 and that it is based on 4,500 machine hours. The FIXED-OVERHEAD VOLUME VARIANCE is the difference between budgeted fixed overhead and actual fixed overhead. Assume that the predetermined fixed overhead per machine hour = $5 and that it is based on 4,500 machine hours. Fixed-overhead volume variance Budgeted fixed overhead Applied fixed overhead =- Applied fixed overhead = $22,500 Fixed-overhead volume variance Budgeted fixed overhead = $30,000 = - Variance = $7,500 U, because we produced less than budgeted. Fixed Overhead Volume Variance

17-22 Budget Variance Volume Variance The real control variance for fixed overhead because it compares actual expenditures with budgeted fixed overhead costs The real control variance for fixed overhead because it compares actual expenditures with budgeted fixed overhead costs Reconciles the two different purposes of the cost accounting system Reconciles the two different purposes of the cost accounting system For cost-management purposes, the cost- accounting system recognizes that fixed overhead does not change as production activity varies For cost-management purposes, the cost- accounting system recognizes that fixed overhead does not change as production activity varies For product-costing purposes, budgeted fixed overhead is divided by planned activity to obtain a predetermined or standard fixed- overhead rate For product-costing purposes, budgeted fixed overhead is divided by planned activity to obtain a predetermined or standard fixed- overhead rate Managerial Interpretation Of Fixed-Overhead Variances

17-23 (1) Actual fixed O/H (1) Actual fixed O/H (2) Budgeted fixed O/H (2) Budgeted fixed O/H (3) Fixed overhead applied to work in process (3) Fixed overhead applied to work in process Standard allowed machine hours Standard allowed machine hours Standard fixed overhead rate Standard fixed overhead rate X X 4,500 machine hrs $5.00 per machine hr $5.00 per machine hr X X $30,000$32,500 Fixed-overhead budget variance = $2,500 U Fixed-overhead volume variance = $7,500 U $22,500 Fixed Overhead Budget And Volume Variances Exh. 17-8

17-24 Fixed overhead $30,000 $22,500 0 Applied fixed overhead ($5.00 per standard allowed machine hour) Budgeted fixed overhead Machine hours Volume variance $7,500 4,500 Standard allowed hours, given actual output 6,000 Planned monthly activity Applied fixed overhead in June Budgeted Versus Applied Fixed Overhead Exh. 17-9

, 3-, & 2-way Variance Analysis Four-way analysis Three-way analysis Two-way analysis Variable- overhead spending variance Fixed- overhead budget variance Variable- overhead efficiency variance Fixed- overhead volume variance $1,680 U$2,500 U$1,800 U$7,500 U Combined spending variance $4,180 U$1,800 U$7,500 U $5,980 U Combined budget variance Underapplied overhead $7,500 U $62,980 actual overhead - overhead applied to WIP, 49,500 = $13,480 Exh

17-26 Using The Overhead Cost Performance Report In Cost Management An Overhead Cost Performance Report Shows the fixed overhead budget variance,along with the actual and budgeted cost for each fixed overhead item. Shows the variable overhead spending and efficiency variances, along with the actual and budgeted cost for each variable overhead item. The report would be used by management to exercise control over each of the overhead costs.

17-27 Manufacturing Overhead Actual $62,980$49,500 Applied Credit: Indirect-material inventory Wages payable Utilities payable Accumulated depreciation Prepaid insurance and property taxes Engineering salaries payable 19,350 32,610 2,170 1,300 1,050 6,500 Debit: Work-in-process inventory Applied overhead: $11.00 (predetermined overhead rate) X 4,500 (standard allowed hours $49,500 $13,480 Debit: Cost of goods sold $13,480 Using Standard Costs In Product Costing

17-28 An activity-based flexible budget may provide more useful cost management information than a conventional flexible budget An activity-based flexible budget may provide more useful cost management information than a conventional flexible budget The traditional budget Activity-based flexible budget Costs are categorized as variable based on volume measures Costs are categorized as variable based on volume measures Machine hours Machine hours Direct labor hours Direct labor hours Costs are categorized as variable based on several cost drivers Costs are categorized as variable based on several cost drivers Cost that may seem fixed with respect to a single volume-based cost driver may be variable with respect to other non-volume related cost drivers Cost that may seem fixed with respect to a single volume-based cost driver may be variable with respect to other non-volume related cost drivers Activity-Based Flexible Budget

17-29 End of Chapter 17 I wish I could figure out how to …….. my paycheck!