GLAST Calorimeter LAT F2F Meeting 17 Mar 2005 Naval Research Lab Washington DC W Neil Johnson 1 Subsystem Mgrs F2F Meeting Calorimeter Subsystem 17 Mar 2005 W. Neil Johnson Naval Research Lab
GLAST Calorimeter LAT F2F Meeting 17 Mar 2005 Naval Research Lab Washington DC W Neil Johnson 2 CAL Status Crystal Detector Element (CDE) Manufacturing - Complete PreElectronic Modules (PEMs) - Complete Analog Front End Electronics (AFEE) - Complete All flight boards complete, burned in and conformal coated. 4 spares and 4 more for T&DF support are finishing burn in. CAL Modules 15 modules have been completely assembled. – have been delivered – 108 – 110 are in TVAC chamber, pump down on Friday. PEMs 116 & 117 are in AFEE card installation All required EM2 TEM/TPS for 18 CAL modules are at NRL
GLAST Calorimeter LAT F2F Meeting 17 Mar 2005 Naval Research Lab Washington DC W Neil Johnson 3 Assembly and Test Completion Started ] This month ] Previously
GLAST Calorimeter LAT F2F Meeting 17 Mar 2005 Naval Research Lab Washington DC W Neil Johnson 4 Issues Use of QUAL flight TEM/TPS for FM116 or FM117 environmental testing at NRL. Need next week for safe to mate for FM116 or week later for FM117 Restarting TVAC at NRL on 3/21 but without checkout of “Big Blue” Thermal Control System Not needed for CAL testing – individual cold plates for each CAL and TEM/TPS. “Big Blue” TCS will be checked out between CAL tests. Next CAL TVAC will be FM111 – FM114 Need to re-install (rent) humidity control system (dehumidification) for work in May and June Approx $25K cost expected to be covered within existing budget.
GLAST Calorimeter LAT F2F Meeting 17 Mar 2005 Naval Research Lab Washington DC W Neil Johnson 5 CAL Module Deliveries December ’04FM 101 January ’05FM 102 – 105 February ’05FM 106 – 107 March ’ April ’05FM 108 – 110 May ’05FM 111 – 114 June ’05FM 115 – 118