Alice EMCAL Meeting, July 2nd 20071 EMCAL global trigger status: STU design progress Olivier BOURRION LPSC, Grenoble.

Slides:



Advertisements
Similar presentations
Alice EMCAL meeting, July EMCAL jet trigger status Olivier BOURRION LPSC, Grenoble.
Advertisements

Local Trigger Control Unit prototype
SKIROC New generation readout chip for ECAL M. Bouchel, J. Fleury, C. de La Taille, G. Martin-Chassard, L. Raux, IN2P3/LAL Orsay J. Lecoq, G. Bohner S.
CHL -2 Level 1 Trigger System Fully Pipelined Custom ElectronicsDigitization Drift Chamber Pre-amp The GlueX experiment will utilize fully pipelined front.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
S. Silverstein For ATLAS TDAQ Level-1 Trigger updates for Phase 1.
Christelle Roy - Subatech 1 EMCal – France StatusCERN Since the Scientific Council.
UNIVERSITY OF BERGEN DEPARTMENT OF PHYSICS 1 UiB DR 2003 High Level API for the TPC-FEE control and configuration.
Upgrade developments in Clermont-Ferrand Romeo Bonnefoy and François Vazeille Tilecal upgrade meeting (CERN, 13 June 2014) ● Handling tools ● Deported.
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
EMCal project TRU (Trigger Region Unit) status Sept ‘08 1 Norbert Novitzky 9/14/2015.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Normal text - click to edit RCU – DCS system in ALICE RCU design, prototyping and test results (TPC & PHOS) Johan Alme.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
NEDA collaboration meeting at IFIC Valencia, 3rd-5th November 2010 M. Tripon EXOGAM2 project Digital instrumentation of the EXOGAM detector EXOGAM2 - Overview.
Understanding Data Acquisition System for N- XYTER.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
June 3, 2005H Themann SUSB Physics & Astronomy 1 Phenix Silicon Pixel FEM S. Abeytunge C. Pancake E. Shafto H. Themann.
1 Online Calibration of Calorimeter Mrinmoy Bhattacharjee SUNY, Stony Brook Thanks to: D. Schamberger, L. Groer, U. Bassler, B. Olivier, M. Thioye Institutions:
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
11th March 2008AIDA FEE Report1 AIDA Front end electronics Report February 2008.
First ideas for the Argontube electronics Shaper, simulations Block Diagram for analog path Delta Code Data Reduction Bus system, Controller Max.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
Bernardo Mota (CERN PH/ED) 17/05/04ALICE TPC Meeting Progress on the RCU Prototyping Bernardo Mota CERN PH/ED Overview Architecture Trigger and Clock Distribution.
Parallel Data Acquisition Systems for a Compton Camera
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
8/9/2000T.Matsumoto RICH Front End RICH FEE Overview PMT to FEE signal connection Trigger Tile Summation of Current RICH LVL-1 Trigger Module1,2 What is.
Rome 4 Sep 04. Status of the Readout Electronics for the HMPID ALICE Jose C. DA SILVA ALICE.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
1 Jyväskylä contribution to EMCal / PHOS trigger.
1 Dong Wang, Yaping Wang, Changzhou Xiang, Zhongbao Yin, Fan Zhang, Daicui Zhou (Huazhong Normal University, China) Status and planning on common readout.
Ideas about Tests and Sequencing C.N.P.Gee Rutherford Appleton Laboratory 3rd March 2001.
J. Prast, G. Vouters, Arlington, March 2010 DHCAL DIF Status Julie Prast, Guillaume Vouters 1. Future CCC Use in DHCAL Setup 2. Calice DAQ Firmware Implementation.
Xiangming Sun1PXL Sensor and RDO review – 06/23/2010 STAR XIANGMING SUN LAWRENCE BERKELEY NATIONAL LAB Firmware and Software Architecture for PIXEL L.
EMCal in ALICE Norbert Novitzky 1. Outline How Electro-Magnetic Calorimeters works ? Physics motivation – What can we measure with Emcal ? – Advantages.
PROJECT - ZYNQ Yakir Peretz Idan Homri Semester - winter 2014 Duration - one semester.
FPGA firmware of DC5 FEE. Outline List of issue Data loss issue Command error issue (DCM to FEM) Command lost issue (PC with USB connection to GANDALF)
EMCal Status ALICE Technical Board November 20, 2008 News Schedule.
12GeV Trigger Workshop Christopher Newport University 8 July 2009 R. Chris Cuevas Welcome! Workshop goals: 1.Review  Trigger requirements  Present hardware.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
CERN, 18 december 2003Coincidence Matrix ASIC PRR Coincidence ASIC modifications E.Petrolo, R.Vari, S.Veneziano INFN-Rome.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
Integration and commissioning of the Pile-Up VETO.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
NA 62 TTC partition timing T.Blažek, V.Černý, R.Lietava, M.Kovaľ, M.Krivda Bratislava, Birmingham We are developing procedures for timing parameter adjustment.
ATLAS SCT/Pixel TIM FDR/PRR28 June 2004 TIM Requirements - John Lane1 ATLAS SCT/Pixel TIM FDR/PRR 28 June 2004 Physics & Astronomy HEP Electronics John.
Status of Integration of Busy Box and D-RORC Csaba Soós ALICE week 3 July 2007.
29 May 2009 Henk Boterenbrood, Augusto Ceccucci, Bjorn Hallgren, Mauro Piccini and Helmut Wendler 1 The Calorimeter Recorder CARE.
CMM++ activities at MSU Y. Ermoline et al. Level-1 Calorimeter Trigger Joint Meeting, CERN, 13 – 17 September 2010.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
May 10-14, 2010CALOR2010, Beijing, China 1 Readout electronics of the ALICE photon spectrometer Zhongbao Yin *, Lijiao Liu, Hans Muller, Dieter Rohrich,
Trigger for MEG2: status and plans Donato Nicolo` Pisa (on behalf of the Trigger Group) Lepton Flavor Physics with Most Intense DC Muon Beam Fukuoka, 22.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
The ALICE Electromagnetic Calorimeter
EMCal Cosmics Run Cosmics Run Goals
96-channel, 10-bit, 20 MSPS ADC board with Gb Ethernet optical output
CMS EMU TRIGGER ELECTRONICS
VELO readout On detector electronics Off detector electronics to DAQ
Commissioning of the ALICE-PHOS trigger
Tests Front-end card Status
PID meeting Mechanical implementation Electronics architecture
Presentation transcript:

Alice EMCAL Meeting, July 2nd EMCAL global trigger status: STU design progress Olivier BOURRION LPSC, Grenoble

Alice EMCAL Meeting, July 2nd Overview Global trigger scheme reminder Technology issue Validation methodology Status Future steps Summary

Alice EMCAL Meeting, July 2nd Trigger specification : L0 trigger : OR of the 34 L0 calculated by the TRU. L1-gamma trigger: Energy summed over sliding window of 4x4 towers (2x2 fast OR) and compared to a multiplicity corrected threshold. L1-jet trigger : Energy summed over a sliding window of n*n subregions and compared to a multiplicity corrected threshold (a subregion is defined as 8x8 towers) Position of the Summary Trigger Unit in the global trigger scheme STU TRU L0 L1-gamma L1-jet 34 TRU Multiplicity from V0 4 diff pair Ethernet CAT7 cable TRU is clocked by the BC clock forwarded by STU (40.08MHz) TTC link To CTP DDL DCS Put trigger data in the data stream on L2a (via DDL) LVDS links

Alice EMCAL Meeting, July 2nd The technology issue The feasibility of a LVDS link (TRU  STU) working at 2*400.8 Mbs over 15m has to be checked. (see Frascati presentation) The STU design and fabrication on hold  waiting for this validation.

Alice EMCAL Meeting, July 2nd Validation methodology 1.An emitting buffer is loaded via the testing tools 2.A frame transfer is initiated 3.The receiving buffer is read by the testing tools Above steps have to be repeated many times with different packet contents. This scheme is exercising the link as in the final design. It also debugs the serial protocol (local and global trigger side). Trigger OR USB  LVDS USB Slow control LVDS CAT7 LVDS cable 15m Testing tools developed for PHOS by the university of Bergen

Alice EMCAL Meeting, July 2nd Status on this issue 1.Develop the serializer/deserializer VHDL code (with automated frame and character alignment)  Done! 2.Develop and validate the testing tools (hardware and software)  Done! 3.Validate the link speed feasibility with a loopback test  The test scheduling will depend on the availability of the TOR board Reminder: the original calendar was to do this testing before summer 2007

Alice EMCAL Meeting, July 2nd Future steps 1.Design and built the first STU prototype (on hold) 2.Implement a global L1-  (could be validated with 2 TRU). This step could also be done with a TOR. 3.Implement a first version of a L1-jet 4.Implement and test the DDL interface (LPSC is about to be equipped with a Acquisition computer running DATE) 5.Implement and test the DCS interface

Alice EMCAL Meeting, July 2nd Summary LVDS Link prototyping issue (test to be scheduled) Agreement on link protocol (no counter proposal since Frascati)  High speed serializer provided to local trigger (TRU) by LPSC Open questions: –ADC channel numbering versus physical location (to be confirmed or a new map ???) - Region orientation (mirroring between A and C side ???)

Alice EMCAL Meeting, July 2nd SPARES

Alice EMCAL Meeting, July 2nd TRU-STU Serial link specification Reference clock is issued by STU Returning serialized data phase unknown, calibration required at startup 1) Phase alignment: adjust the data input delay, when correctly tuned the words sequence that is read is always the same over several thousand samples. (IDELAY functionality) 2) Character alignment: Once the input delay is properly tuned, the proper frame alignment has to be found out of 6 possibilities (BitSLIP module). data clk data clk BAD GOOD thtsu 2.5ns MSB LSB GOOD

Alice EMCAL Meeting, July 2nd EMCAL layout (2/2) The ADC channel number has to be known by STU, in order to compute the triggers For instance, one 4X4 window is channel 5,6,9 and 10 Confirmation of the ADC channel affectation vs geometrical position

Alice EMCAL Meeting, July 2nd FEE 3 TRU 2 RCU 32 towers /FEE GTL bus crate 1 FEE (Front End Electronics): - 32 analog inputs - 8 2X2 towers analog sum output to TRU - Readout by RCU 1 RCU (Readout Control Unit): - Readout 18 FEE (1/2 SM=1.5 TRU region) - Readout 1 (or 2) TRU 1 TRU (Trigger Region Unit): - receive Fast OR from 12 FEE (8*48 towers) - digitize 96 FastOR inputs at the machine clock frequency - compute local L0 trigger - provide 5 samples integrated data to STU upon global L0 reception One SuperModule Electronics 1152 towers