1. Common Optics Assembly (COA) Main optics housing riveted on channel housing (with rod) QM delivered 12.12.2003.

Slides:



Advertisements
Similar presentations
PREX main detector Piotr Decowski Aimee Shore Smith College Piotr Decowski Aimee Shore Smith College Kumar Krishna Jon Wexler Patrick Rogan Vireak Yim.
Advertisements

Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
TPC meeting, CERN, January 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, January 2003 Børge Svane Nielsen Niels Bohr.
TPC meeting, GSI, 2-3 June 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, GSI, 2-3 June 2003 Børge Svane Nielsen, Jørn Westergaard Niels.
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
MICE Target Report Chris Booth (for target team) Sheffield 7 th May 2009.
GLAST Calorimeter LAT F2F Meeting 17 Mar 2005 Naval Research Lab Washington DC W Neil Johnson 1 Subsystem Mgrs F2F Meeting Calorimeter Subsystem 17 Mar.
PALM-3000 Optical Bench Update Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss Team Meeting #15 10/29/2009.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
W. Aalders FPU CDR 1-3 July 2003 HIFI 1 FPU CDR MCS HIFI MECHANISMS 1.Focal Plane Chopper (FPC) 2.Diplexer Rooftop Mirror Translator (DRT) 3.Pivot development.
DM - COA Housing. DM - COA Housing with mirrors and alignment devices installed Alignment cubes Alignment devices Dummy chopper.
Schedule & Plans Prof. J. Incandela US CMS Tracker Project Leader DOE Visit January 20, 2004.
Development of the IF2 Chain for the FPU of the HIFI Instrument Alexander Megej July 1 st, 2003, Groningen.
Herschel / HIFI 1.Status mirrors FM/FS 2.Status COA QM 3.Status COA FM 4.Financial situation COA FM 5.Status MSA FM/FS.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
Target Controller Electronics Upgrade Status P. Smith J. Leaver.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Template For Building Project Schedule Jazz Presentation.
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
Presentation of HanKing
ASPERA-3 Sep. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 9_25/ Page 1 Monthly Status Report Report due 9/25/00 Schedule statused.
Magellan F/5 System Status A.Szentgyorgyi/SAO/30 Apr 2005.
PRAVENDRA KUMAR.  A supply chain is the collection of steps that a company takes to transform raw components into the final product.  Supply chain management.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
ASPERA-3 July 31, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 7_31/ Page 1 Monthly Status Report Report due 7/25/01 Schedule statused.
ME 422 – Manufacturing Processes Page 1/19 Introduction Manufacturing is the act of making a products by hand or machine from raw materials. It seems to.
Project Post-Mortem University of California Berkeley Extension Copyright © 2008 Patrick McDermott From an AutoContent Wizard 10/27/2007.
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
Current status of Laser development 2nd Korea - Japan Workshop on KAGRA 2012/5/28(Mon)
ASPERA-3 Jan. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 1_25/ Page 1 Monthly Status Report Report due 1/25/01 Schedule statused.
- Introduction - Procurement status - Main milestones EUSO-BALLOON DESIGN REVIEW, , CNES TOULOUSE Guillaume Prévôt APC, Paris Schedule.
CMX Production Status Presented to the L1Calo Meeting on Monday 22-Sept-2014 by Dan Edmunds for the CMX Group.
HAPEX III / PVDIS Targets Dave Meekins. Target List Loops – LH2 25 cm – LD2 25 cm – 20 cm Spare Solid target – Dummy tgts of correct length – Optics tgt.
Engineering. What is Engineering? Engineering is a Two Year Course ending with the Leaving Certificate. There is a Higher and Ordinary level. Students.
1.  YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. ( Dim. inspection 680 mm (0,-0.5)  Fasteners =
DHCAL m3 module Ciemat status Enrique Calvo Alamillo EVO meeting 1 July 2010.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Working Drawings (Production Drawings)
GERB 4 Instrument Status GIST 25 23rd October 2006 Presenter: N Morris.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
 The portion of economy concerned with the direct extraction of materials from Earth’s surface.
The status of RF components on Maria Filippova, RF components: Loads Phase shifters Attenuators Hybrids Splitters Directional couplers.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
1 MEMB113: ENGINEERING GRAPHICS & CAE 13 ASSEMBLY AND DETAIL DRAWING.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
ALICE SSD 20 May Yalta G-J Nooren ALICE SSD status.
Working Drawings Stephen W. Crown Ph.D.. Working Drawings A final set of drawings providing all the details and information needed to manufacture and.
24 Th January Status of the Conductor Development Status of the manufacturing for Alstom Status of the manufacturing for SMI L. Oberli.
EMCal Meeting Nantes – July J-F Muraz  Grenoble Status  Assembly and test Hall.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 11 December 2012 LAV construction & installation status.
Status of the TileMuon Digitizer Board Victor Ferraz.
MIRI day 3 june 2010 Biography of JWST MIRI SMO FM MIRI day 1.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
1 BNL LHC Hi-Lumi QXF Vertical Test Facility Status Update M. Anerella, H. Hocker, P. Joshi, P. Kovach, A. Marone March 28, 2016.
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
THE COMPANY OPTIKRON, your partner for micro-optics, assemblies and optical coatings was founded in 1992 in the optics and technology region of Jena. We.
Beam Wire Scanners (PS prototype and LIU series)
Status of the PANDA Solenoid Magnet Production in BINP
Chapter 11 Production.
First Stage Cryogenic IF Amplifier

Status of the PANDA Solenoid Magnet Production in BINP
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
Working Drawings (Production Drawings)
Assembly drawings Flóra Hajdu B406
Presentation transcript:

1. Common Optics Assembly (COA) Main optics housing riveted on channel housing (with rod) QM delivered

COA: Channel housing ready for assembly and riveting

COA: QM reveting was tested by SRON. Approved?

Assembling the COA FM

HIFI main optics mirrors produced by TPD Delft (raw) and LFM Bremen 80% of flight models delivered on 2 March 2004 Rest in May

Concerns None really serious ! Watch communication betweens partners (many components, many details)

Concerns None really serious ! Watch communication betweens partners (many components, many details)

Concerns None really serious ! Watch communication betweens partners (many components, many details) Mirror 137

Concerns None really serious ! Watch communication betweens partners (many components, many details)

Concerns None really serious ! Watch communication betweens partners (many components, many details)

Current status of COA FM: 1. Channel housing FM Eroding process is completed Ready for final machining step 2. Main Optic Housing FM Manufacturing leaving still mm Final heat treatment tbd Final machining tbd Surface treatment at ABB: end of May 2004 Riveting at RUAG finished: middle of June 2004 Final assembly at HTS: end of June 2004 Delivery beginning of July 2004

2. Mixer Subassemblies (MSA) 3. Diplexer Housings Delay caused by eroding problems: now solved Measurements: this week Final machining tbd First delivery of all available parts in week 20/

Concerns None really serious ! Delay becomes critical Watch communication betweens partners (many components, many details)