Fire Island / Robert Moses State Park CODAR 13 MHz Investigation.

Slides:



Advertisements
Similar presentations
Lec 25: Ch2.(T&LD): Site planning
Advertisements

Department of Landscape Architecture and Urban Planning College of Architecture Texas A&M University April 24, 2002 Presented By Jin Y Jun Site Selection.
1 Beachcomber Bay Sewer Lift Station Homeowners believe a better solution is available for both the City and the Homeowners.
Agenda Introduction Business Objectives of Banks
Slide 1 COST Action TU 1002 – Edinburgh, October 2011 THE EFFECTS OF DECISION-MAKING ON URBAN FORM, A TOOL FOR SUPPORTING PLANNING PROCESSES Matteo.
Components of GIS.
WESTERN LOUDOUN SCHOOLS: ALTERNATE SITES May 26, 2009 Schoene/Engle McDonough Assemblage.
Comparative Analysis Two Potential Sites for a New High School.
Presentation to 2007 Tidal Energy Conference Ketchikan, AK January 24, 2007 Providing Diversity for Alaska’s Energy Future A New Source of Emission-Free.
ENVIRONMENTAL SITE ASSESSMENT SCREENING. Purpose First step in ODOT’s ESA Process Identifies all sites in project Use hard data to screen the project.
3-1 Utility Conflict Identification and Management Lesson 3.
GIBSON ISLAND WATER SYSTEM CAPITAL IMPROVEMENT PROJECT Public Information Meeting June 5, 2012.
Planning Permission Process and Procedures
URBAN INFILLING IMPACTS ON FLORIDA’S SOLID WASTE FACILITIES Debra R. Reinhart, PhD, PE, DEE Roger Wayson, PhD, PE University of Central Florida Marc Rogoff,
Geotechnical Investigation Step 1 - Gather Existing Information Structure Data Bridge, building, road, wall, etc. Type - stories, loads, materials, etc.
Avineon 3D Trace - Visualization Avineon India Jan 20, 2011.
Planning Commission Public Hearing October 15, 2009.
The Economics of Investment in Information Assurance: An Empirical Investigation By Dr. Lawrence A. Gordon* and Dr. Martin P. Loeb* * Robert H. Smith School.
Mobile GIS at the DNR GIS Day – UMD November 17, 2011.
A GIS BASED ASSESSMENT OF ELECTRICITY TRANSMISSION AND DISTRIBUTION INFRASTRUCTURE IN ZANGON SHANU Ahmadu Bello University, Zaria.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
 WHAT THE TASK FORCE COMMITTEE DID ?  WHY DOES ANDOVER NEED A NEW TOWN YARD?  WHAT ARE THE COST IMPACTS OF NOT DOING ANYTHING?  WHAT ARE THE BENEFITS.
GRPE 70th session PMP INFORMAL GROUP progress report TO GRPE
Morphum Environmental Ltd Environmental Engineers and Consultants
1 Nationwide Differential GPS (NDGPS) Real-Time Data Streaming Federal Geodetic Control Subcommittee Silver Spring, MD January 10, 2012 Timothy A. Klein.
Captured from Google Earth online Comparing the CWTP 2003 Alienation Legislation, 2004 FSEIS and 2008 proposed Above Ground Facilities at Mosholu Golf.
Presented to: 2012 Pacific Aviation Director’s Workshop, Guam By: Juan S.A. Reyes, A.C.E., ACSI Date: March 13-15, 2012 Federal Aviation Administration.
CorPlan: Place Based Scenario Planning Tool
The Carbon Calculator Project: A site to help people calculate their carbon footprint and help change their behaviour. Challenge: Help people through.
MediaCom digital planning approach. LP - scripts plugged in page Supplier/technology: Gemius Where? Home page, in specific action buttons Purpose: Collect.
Analysis of Conflict between Potential Resource Use and Wildlife Conservation in The Muskuwa-Kechika Management Area Nobuya (Nobi) Suzuki, Natural Resources.
Online Lead Generation The inside story on what works and what doesn’t Jordan Muela, Co-founder, Manage My Property, LLC May 2011.
Community Development Department ISLAND WALK REZONING REQUEST APPLICATION #2648.
Community Development Department ISLAND WALK MASTER PLANNED DEVELOPMENT APPLICATION #2648.
Legal Regulations for High School Road II BAINBRIDGE ISLAND MUNICIPAL CODES & COMPREHENSIVE PLAN CONDITIONAL USES.
Municipal GIS Applications JOHN C. CHLARSON, P.E. UNIVERSITY OF TENNESSEE MUNICIPAL TECHNICAL ADVISORY SERVICE FURE.
The History of GIS at the City of Encinitas October 2012.
INTERLEGES AGM KIEV THE “ESSENTIALS” OF LAW FIRM WEBSITES.
Subcommittee on Heights, Massing, and Alternate Standards    Third Report – January 20, 2009 Planning & Zoning Commission.
1 Homeland Security S&T Summit (SE Region) Topic: SERRI Project - Disaster Planning and Response Title: “Disaster Response Intelligent System” (DRIS) Jackson.
Robert Mc Donald 1 Moville/G’castle Sewerage Scheme An Overview of the Site Selection Process An Board Pleanala June 2009.
Urban Land Use. Urbanization Urbanization: the movement of people from rural areas to cities. People usually move for more or better paying jobs.
Start Typical student project Advanced student project Level of final response.
NASA Ames Research Center Environmental Services Division Code QE Presolicitation Conference These slides do not contain a complete summary of the Draft.
Request: rezone 32 acres from PD-OP (Office Park) to R-16 (Residential) & PD-CC-CC (Commercial Center) – 128 multifamily units & 260,000 sf retail and.
WWC CONSTRUCTION MEREDITH AVENUE & SPENCER STREET RICHARD MARTUCCI OWNER BUILDERS & DEVELOPERS CIRCLE MEMBER A Marquee Green Zone Property
Property For Sale 5442 Joor Road Baton Rouge, LA Wade H Greene (225)
Urban Land Use Environmental Science Urbanization  The movement of people from rural areas to cities.  People usually move for more plentiful.
Planning for a Sustainable Future Case study. The site The site lies in what is designated as countryside on the border of the Brecon Beacons National.
Planning and Zoning Division Jefferson County RZTo amend the existing Planned Development (PD) zone district to allow for mini-warehouse storage.
Hazards Of Wildlife. Car / Deer Collision Facts What Are the Facts? Although most car-deer collisions occur between the months of October and December,
Fawley Oil Refinery Case Study of Industrial location
Disaster/Emergency Management GIS Applications. Presentation Overview Jordan Everhart – E Team Nathan Dean – CATS David Halliday- EmerGeo Patrick Young.
Land Use. How We Use Land Urbanization of areas is becoming a problem. Thousands of acres of open space just in Pennsylvania have been lost to development.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
Parksideactiongroup.org.uk Myth Busters. parksideactiongroup.org.uk Myth The Site is Derelict These pictures show the site today. You can see it is far.
STORM WATER SOLUTIONS FOR EXISTING URBAN AREAS: IDENTIFYING SITES TO MAXIMIZE RESULTS Jared Bartley, Cuyahoga SWCD September 8, 2011.
SYREK ELECTRIC Phone – Fax Hr. Emergency – Wigington Road, Claysville PA For the past twenty-six years,
Center Point Area Fire Department SAFETY AND SUSTAINABILITY.
Bancroft Elementary School School Building Committee Meeting February 24, 2010.
MAX RESIDENCY Residential layouts BIAAPA Approved plots, sites for sale near BIAL- Bangalore International Airport by leading land developers Maxworth.
Geotechnical Investigation
Blue Ocean Planning Final Report March, 2017.
The fibre journey for fibre-to-the-cabinet (FTTC) solutions
Tam O’Shanter Rezoning
POE SPRINGS ROAD is also known as County Rd 340 or 236 (there is a BP gas station at the intersection. w/27). About 4.5 miles on this road you will see.

Desert Camp Planning Task
Sustainable Agricultural Use of Municipal Wastewater Sludge
Western Orbital.
Presentation transcript:

Fire Island / Robert Moses State Park CODAR 13 MHz Investigation

Robert Moses State Park Power typically runs to the lifeguard sheds NPS recommended Field 4 as the least traffic Western tip of island

Robert Moses (Field 4 Specific) Typical Layout: Above: concessions Right: Lifeguard stand

Robert Moses (Field 4 Specific)

Robert Moses generates mutant deer

NPS – Fire Island 4 Potential Sites NPS in accord, but feel Robert Moses is just a ‘better’ location for us Requests for: –GIS applications of CODAR data –National ‘spill’ tracking functionality, perhaps for National Database

Site 1 – Convention Area (Lighthouse) Site in dunes Must be low profile (no shed, weather enclosure with AC) Power nearby but likely final solution requires underground power Plug nearby appears to be 120 V e.com/nema_config urations.htm

Site 1 – Convention Area (Lighthouse)

Site 2 - Annex Power or cables over or under road, either not easy Far from water

Site 3 - Firehouse Same as annex, all issues

Site 4 - Incinerator Best infrastructure Least impact location visual and footprint A bit further drive to get to On ‘commercial’ land

Site 4 - Incinerator