LCLS Control Group Sheng Peng October 26, 2005 1 Injection Laser Stabilization Control System Preliminary Design Outline Introduction.

Slides:



Advertisements
Similar presentations
CAVITY LOCK ELECTRONICS Dan Sexton, Sirish Nanda, and Abdurahim Rakhman.
Advertisements

Stephanie Allison LCLS Event System 14 June LCLS Event System Outline HW Block Diagram Timing Requirements Time Lines EVG.
CS-Framework at POLARIS Alexander Kessler, Frank Schorcht, Marco Hellwing, Alexander Sävert, Marco Hornung, Sebastian Keppler, Joachim Hein, Malte Kaluza.
1. 2 LabVIEW for FRC Doug Norman National Instruments January 6, 2012.
SESAME-TAC2013-Ibrahim Saleh-Abdallah Ismail1 Beamlines Control System Monochromator Reflecting Mirror VCM: Vertical Collimating Mirror VFM: Vertical Focusing.
2D Detectors DAQ Overview 2D detectors are organized as tiles providing 10G Ethernet serialized portions of the full.
Sheng Peng Motion Control in 3/12/ Motion Control in LCLS Sheng Peng EPICS Meeting 2008, Shanghai.
LCLS Control Group Sheng Peng October 26, Camera Interface Discussion.
Hamid Shoaee LCLS Facility Advisory Committee October Control System Overview October 12, 2006 Hamid Shoaee for the LCLS.
Hamid Shoaee High Level Physics 20 April 2006 High Level Physics Applications Update on Plans, New Directions Fairley,
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
7/24/031 Ben Blazey Industrial Vision Systems for the extruder.
Applying Wireless in Legacy Systems
HCAL FIT 2002 HCAL Data Concentrator Status Report Gueorgui Antchev, Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
September 22, 2009GONG H-alpha Review1 Data Acquisition System (DAS)
GigE Knowledge. BODE, Company Profile Page: 2 Table of contents  GigE Benefits  Network Card and Jumbo Frames  Camera - IP address obtainment  Multi.
Dr. Gunther Haller XES Controls & 11 July Experimental Area Controls and Data-Acquisition Gunther Haller Research Engineering.
A. Homs, BLISS Day Out – 15 Jan 2007 CCD detectors: spying with the Espia D. Fernandez A. Homs M. Perez C. Guilloud M. Papillon V. Rey V. A. Sole.
Optical Anchor / Interferometer Status: June, 2004 Josef Frisch.
Development of EPICS Embedded Image Processing System Takashi Obina, Jun-ichi Odagiri, Ryota Takai KEK, Accelerator Laboratory.
Laser DCS meeting, Utrecht, 13 June 2005Børge Svane Nielsen, NBI1 TPC laser controls adjustable mirrors Laser Controls, Power, Cooling DCS: 1/ Laser controls.
[1] Reference: QCam API reference manual document version Charge Coupled Device (CCD)
Emlyn Corrin, DPNC, University of Geneva EUDAQ Status of the EUDET JRA1 DAQ software Emlyn Corrin, University of Geneva 1.
NI DAQ, Nanopositioner (Tilt mirror)  Reference: NARIONAL INSTRUMENT, “NI-DAQ 7, DAQmx C Reference Help ”, 2004 NARIONAL INSTRUMENT, “DAQ, 6534X User.
Blake Ipson John Chen Matt Graeff Steven Benedict Weston Welge Team PhotoCon EXPO Lab Department of Electrical, Computer, and Energy Engineering University.
Motion Control System Status
Pinewood Derby Timing System Using a Line-Scan Camera Rob Ostrye Class of 2006 Prof. Rudko.
ALVIN the Albuquerque LabVIEW Interest Network An Overview of Servo Motor System and LabVIEW Presented by Larry Goga February 19th, 2009.
Controls for High-Availability Magnet PS’s for ATF2 Glen White SLAC September
1 13 th SafeProbe Meeting , Venaria (Torino) SP1 – SAFEPROBE MEETING: Gateway – Radar - VANET.
EPICS Developments at the Australian Synchrotron DSP EPICS driver for the General Standards 16AIO analog card EPICS driver for the Galil range of motor.
LBTO PMC Subsystem February 13, 2007 Chris Biddick 1 cjb.
PITZ – Introduction to the Video System Stefan Weiße DESY Zeuthen June 10, 2003.
Dayle Kotturi Lehman Review May 10-12, 2005 Low Level RF Outline Scope Local feedback loop requirements Solutions Costs How this.
VIRGO Control System Upgrade: Multi-DSP Board Alberto Gennai INFN Pisa LIGO-G Z.
Running EPICS on NI CompactRIO Initial Experience Eric Björklund (LA-UR )
TPC/TRD DCS meeting, GSI, 27 Sep 2002Børge Svane Nielsen, NBI1 TPC laser system controls adjustable mirrors Laser Controls, Power, Cooling DCS: 1/ Laser.
24/10/2015Sheffield University 1 Target Electronics Recap - Decision has been made to rebuild the target electronics control system so that it is upgraded.
Hobby - Eberly Telescope MARS Software Design Review November 2002 Michael H. Ward Systems Analyst McDonald Observatory MHW 04-November
The microIOC Family Gasper Pajor EPICS Collaboration Meeting Argonne National Laboratory June 2006.
General Time Update David Thompson Epics Collaboration Meeting June 14, 2006.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
CCD Cameras with USB2.0 & Gigabit interfaces for the Pi of The Sky Project Grzegorz Kasprowicz Piotr Sitek PERG In cooperation with Soltan Institute.
Hamid Shoaee EPICS Collaboration Meeting, June 13, 2006 LCLS Control System Hamid Shoaee For the LCLS Controls Group.
BWS electronics design status J.Emery & Luca, Pierre-Jean, Emiliano, Jose, Alexander and all past contributors!
Status of the STT Motherboard Testing Evgeny Popkov Boston University 5 Jan
Laser Heater Controls Overview 21 August 2008 Matt Boyes Laser Heater Controls Design Overview EPICS IOC Team Meeting Matt Boyes.
PXI Systems - Discussions Gueorgui ANTCHEV / EP-ESSEPTAB Meeting February 2003Slide 1 of 3 PXI = Compact PCI + eXtensions for Instrumentation PXI is an.
Motor drivers for asyn motor device support Mark Rivers GeoSoilEnviroCARS, Advanced Photon Source University of Chicago.
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
The recent history and current state of the linac control system Tom Himel Dec 1,
Stephen Norum LCLS Oct. 12, LCLS Machine Protection System Outline Overview of interim MPS Update on the interim MPS.
Bill White Commissioning October 9, 2006 Drive-Laser Commissioning Status and Plans Requirements Where do we stand today?
Mar 18, 2003PFIS CDR1 Control System Summary of Changes Since PDR All the motors, drivers, sensors, switches, etc. have been chosen Built up a mechanism.
Diagnostics and Optimization Procedures for Beamline Control at BESSY A. Balzer, P. Bischoff, R. Follath, D. Herrendörfer, G. Reichardt, P. Stange.
Robert C. Sass Sheng Peng LCLS Upgrade Review June IOC Requirements 1 LCLS Phase I Upgrade; IOC CAMAC Support Requirements Robert C. Sass Sheng.
Nuclear Emulsion Readout Techniques Developed for the CHORUS Experiment or “...how we managed in CHORUS to convert nuclear emulsion into an electronic.
Controls Test Stand Test stand proposal document review - Dayle. The activities can be prioritized according to which measurements we need to do first.
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
Hamid Shoaee LCLS Facility Advisory Committee October Control System Overview Hamid Shoaee for the LCLS Controls Group.
Date of download: 7/1/2016 Copyright © 2016 SPIE. All rights reserved. (a) Simplified sketch of the setup. Some beam guiding mirrors, optical isolators,
The GOOFIE detector as a Ternary Mixture Monitor
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
SLS Timing Master Timo Korhonen, PSI.
MultiView 400™ Product Presentation Nanonics MultiView 400™
P08453: Turbomachinery Flow Visualization
Greg Bell Business Development Mgr Industrial & Security Markets
Control System Summary of Changes Since PDR
EPICS at SLAC EPICS/SLC Controls Co-existence LCLS Injector Support
quadEM: New Beam Position Monitor & Electrometer Hardware and Software
Presentation transcript:

LCLS Control Group Sheng Peng October 26, Injection Laser Stabilization Control System Preliminary Design Outline Introduction Motion Control Image acquisition Status

LCLS Control Group Sheng Peng October 26, Introduction The injection laser stabilization control system includes 3 feedback loops. Each loop includes 2 mirrors. Each mirror has two actuators and one camera. The IOC should read back the image from camera, figure out laser’s position, calculate error and apply the correction to the actuators. Whole loop should be about 1 Hz. Camera should be synced to 120Hz.

LCLS Control Group Sheng Peng October 26, Introduction Actuator 1 camera Laser Actuator 2

LCLS Control Group Sheng Peng October 26, Introduction Spiricon Laser Beam Analyzer

LCLS Control Group Sheng Peng October 26, Motion: Newport XPSC8 Motion Controller Pentium 4 PC based vxWorks powered Support up to eight motors Ethernet control interface

LCLS Control Group Sheng Peng October 26, Motion: Newport CMA-12CCCL actuator Travel range:12.5 mm Resolution:0.2µm Encoder:Yes Bi-Direction repeatability: 3µm Speed:50~400 µm/S Load Capacity:90N Compatible with XPSC8

LCLS Control Group Sheng Peng October 26, Image Acquisition: PULNiX TM-6710CL camera CCD:1/2” Shutter: Full Frame UV option:Yes Resolution:648x484 Progressive:Yes External Trigger:Yes Full scan:120Hz Analog Output:Yes Cameralink:Yes

LCLS Control Group Sheng Peng October 26, Image Acquisition: Cameralink interface We have two candidates PULNiX Cam2net Pleora OEM (iPORT PT1000) Cameralink compatible Giga-Ethernet interface 16MB buffer External trigger interface EDT PMC DV C-Link Cameralink compatible 32bit/66MHz PCI Customized solution is available

LCLS Control Group Sheng Peng October 26, Status Spiricon Laser Beam Analyzer has arrived and has been setup Newport XPSC8 motion controller, 4 motor drivers and 4 CMA-12CCL actuators have arrived Integration test with vendor’s software was tried and some problems were observed but not repeatable in LLNL. Further investigation is going on. EPICS driver and device support is available from APS. Code review has been done. Most of code seems from Newport. The coding style is ok. “socket” is working as NODELAY with polling rather than blocked with “select”. No any connection management such as connection monitor and recovery. 1 PULNiX TM-6710CL has arrived. 1 PULNiX cam2net has arrived. Can’t get non-disclosure agreement for current protocol. GigEVison is coming. Loaner EDT DV C-LINK PMC card arrived. Programming interface non-disclosure agreement were settled. Driver and device support development is going on. The first release is expected before the Christmas.