Watershed Planning Tools and an Integrated Watershed Approach Stuart Lehman U.S. EPA NPS Control Branch January 19, 2007 Bordentown, NJ.

Slides:



Advertisements
Similar presentations
1 Watershed Planning: A Key to Integrated Planning FHWA Environmental Conference Ann Campbell Wetlands Division.
Advertisements

Bureau of Water Overview Wastewater issues Drinking water issues Wrap up topics.
Shingle Creek and West Mississippi Watershed Management Commissions Third Generation Watershed Management Plan.
Metropolitan Council Environmental Services A Clean Water Agency Presented to the Environment Committee November 9, 2010 Information Item Master Water.
What are they and why are they important? Presented by: Andrew Craig and Chad Cook DNR Nonpoint Source Planning Coordinator and UWEX WI Land and Water.
Clean Water Act Integrated Planning Framework Sewer Smart Summit October 23, 2012.
By: Carrie Turner Prepared for: New Jersey Association of Environmental Authorities Annual Conference March 12, 2013 Watershed Management Planning Provides.
IDEM TMDL 101 Everything you wanted to know about Total Maximum Daily Loads.
Current Planning for 2017 Mid-Point Assessment Gary Shenk COG 10/4/2012 presentation credit to Katherine Antos and the WQGIT ad hoc planning team.
Montana’s 2007 Nonpoint Source Management Plan Robert Ray MT Dept Environmental Quality.
Indiana 6217 Coastal Nonpoint Source Pollution Control Program – What it is, and What it Means!
Incorporating the 9-Elements into a WMP Lindsey PhillipsMike Archer Source Water CoordinatorState Lakes Coordinator (402) (402)
Components of every Good Watershed Management Plan NDEQ – Planning Unit August 6 th, 2014 NDEQ – Planning Unit gust 6 th 2014.
EPA Region 6 Dallas, Texas EPA Region 6 Dallas, Texas.
Mark Dubin Agricultural Technical Coordinator University of Maryland Extension-College Park Modeling Quarterly Review Meeting April 17, 2012.
April 22, 2005Chester Creek Watershed TMDL Total Maximum Daily Load Chester Creek University Lake & Westchester Lagoon Alaska Department of Environmental.
Watershed-Based Planning A Framework for Action!.
Watershed Management Framework Mission of watershed management –Coordinate and integrate the programs, tools, and resources of multiple stakeholder groups.
EPA’S WATERSHED PLANNING APPROACH FOR THE SECTION 319 PROGRAM Dov Weitman Chief, Nonpoint Source Control Branch October.
Water Quality Monitoring The Role of the Clean Water Act.
Nonpoint Source Pollution Reductions – Estimating a Tradable Commodity Allen R. Dedrick Associate Deputy Administrator Natural Resources & Sustainable.
Approaches to Addressing Bacteria Impairments Kevin Wagner Texas Water Resources Institute.
Community-based Education K-12 students serving as a resource for meeting community needs.
Wetland Monitoring and Assessment National Water Quality Monitoring Council Meeting August 20, 2003.
Bill Carter Nonpoint Source Program Texas Commission on Environmental Quality Trade Fair and Conference, May 2015.
Section 319 Grant Program Nonpoint Source Pollution Control
State Approaches to Funding Local Projects A Survey of RFPs The State/EPA NPS Partnership New Orleans, November 27, 2001.
Region III Activities to Implement National Vision to Improve Water Quality Monitoring National Water Quality Monitoring Council August 20, 2003.
Georgia Adopt-A-Stream Introduction Georgia Adopt-A-Stream 2 Martin Luther King Jr. Dr. SW Suite 1462 East Atlanta, Georgia
SB 1070 Overview California Water Quality Monitoring Council –MOU CalEPA and Resources (Dec 2007) –Monitoring Inventory (April 2008) –Monitoring Recommendations.
Federal Clean Water Act Monitoring and assessments completed statewide Standards not met? Section 303 (d) requires placing the water body on the “Impaired.
1 Sandra Spence EPA Region 8 TMDL Program EPA Region 8 TMDL Program Integrating Watershed Plans and TMDLs to Help Answer Watershed Planning Questions November.
Sustaining Long Term Regional Coordinated Monitoring Programs Todd Running, H-GAC May 9, 2006.
Watershed Assessment and Planning. Review Watershed Hydrology Watershed Hydrology Watershed Characteristics and Processes Watershed Characteristics and.
Taking the Next Step: Implementing the TMDL. What IDEM Provides to Help With Implementation  Compiling all the data in one place  Data-driven recommendations.
Support of the Framework for Monitoring Office of Management and Budget March 26, 2003.
1 Survey of the Nation’s Lakes Presentation at NALMS’ 25 th Annual International Symposium Nov. 10, 2005.
Update on Wyoming Draft 303(d) List and Changes to Watershed Planning.
Orange Creek Basin Management Action Plan Alachua County Commission December 11, 2007 Fred Calder, FL DEP (850)
Amy Walkenbach Illinois EPA 217/
Phase II WIP Background & Development Process Tri-County Council – Eastern Shore June 2,
Michigan Watershed Plan Reviews Presentation at the Michigan Watershed-Based Planning Workshop, Mt. Pleasant, Michigan
La Moine River Ecosystem Partnership: Organizing for Success Dan Moorehouse & Jeff Boeckler.
Connecticut Watershed Conservation Network Conference May 11, 2012 Department of Energy and Environmental Protection MaryAnn Nusom Haverstock.
WATERSHED INVENTORY AND ASSESSMENT Module 7, part A – Issues and Description.
Straight to the Point – Watershed-based Plans Should: be designed to restore water quality from nonpoint source impairments using sufficiently analyzed.
EPA Chesapeake Bay Trading and Offsets Workplan June 1, 2012.
Increasing Momentum in the Formation of State and Regional Monitoring Councils Linda Green, co-chair, Collaboration and Outreach Workgroup, National Water.
2004 Tributary Strategies: Assessment of Implementation Options Steve Bieber Water Resources Program Presented at: COG Chesapeake Bay Policy Committee.
Wisconsin’s Nutrient Reduction Strategy for Water Quality Wisconsin Crop Management Conference January 16, 2014 Ken Genskow, PhD Associate Professor, Department.
KWWOA Annual Conference April 2014 Development of a Kentucky Nutrient Strategy Paulette Akers Kentucky Division of Water Frankfort, KY.
FY 2016 EAP Proposals 1.Groundwater Sampling at Coulee Creek 2.Deep & Coulee Straight to Implementation Project 3.Little Spokane DO/pH TMDL 4.Lake Spokane.
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
CITIZENS ADVISORY COMMITTEE SPRING MEETING MARCH 1—2, 2012 CHARLOTTESVILLE, VA EPA’s Evaluation of Bay Jurisdictions’ Draft Phase II WIPs & Final
Commonwealth of Virginia TMDL Program Update Citizen for Water Quality Annual Summit September 22, 2001.
Modeling Fecal Bacteria Fate and Transport to Address Pathogen Impairments in the United States Brian Benham Extension Specialist and Associate Professor,
WATERSHED MANAGEMENT Dov Weitman Chief, Nonpoint Source Control Branch U.S. Environmental Protection Agency May 4, Federal.
1 Chesapeake Bay TMDL Watershed Implementation Plan – Phase II James Davis-Martin, Chesapeake Bay TMDL Coordinator Citizens Advisory Committee to the Chesapeake.
1 AGRICULTURAL POLLUTION REDUCTION ACTIVITY Financed by USAID APRA ROMANIA PROJECT Project implemented by: Assistance project for MAFWE International Resources.
Tim Cawthon TCEQ Nonpoint Source Program
Mulberry Watershed Management Plan
Mike Bira EPA Region 6 NPS Program
Watershed Literacy & Engagement
Water Quality Trading Advisory Committee MDA Headquarters
Water Quality Trading Advisory Committee MDA Headquarters
Straight to the Point – Watershed-based Plans Should:
Jim Edward Acting Director Chesapeake Bay Program Office May 23,2018 EPA’s Draft Final Phase III WIP Expectations.
Section 319 Grant Program – writing a proposal that can be funded
The Nine Elements that Must Be Included in a 319 Watershed Based Plan
Watershed Restoration, Chesapeake Bay
Presentation transcript:

Watershed Planning Tools and an Integrated Watershed Approach Stuart Lehman U.S. EPA NPS Control Branch January 19, 2007 Bordentown, NJ

CWA Watershed Framework Continuing Planning Process (CPP) Manage nonpoint sources w/ Federal/State $ TMDL WLAs to individual point sources LAs to nonpoint sources EPA approval Water Quality Standards Use Attainability Analysis Monitor/Assess WQS Attainment Assessment methodology 305(b) Report 303(d) List of Impaired Waters EPA approves 303(d) list NPDES permits for point sources EPA discretion to object Watershed Plan State developed or approved

Integrated Watershed Management CZA 6217

Example or Program Integration

State Watershed Programs

Watershed Mgmt. & Typical Roles Local Land use/ zoning / codes/ ordinances Septic regs Watershed Plans Stormwater permits USDA committees State NPS Mgmt Plans / grants / NPDES/TMDLs Monitoring – projects & statewide/ WQstds Growth Mgmt Policies – build out? Env. Assess. Watershed Progs, funds & T. Assist. (incl 319) Federal EPA – WQ crit. & MCLs, 319, TMDLs USDA – Farm Plans, Local Ctrl, EQIP, etc USFS – Multiple- use/NEPA/ ESA/Hydrol. FWS – ESA habitat & other habs Assess Plan Impment Monitor

NINE Elements of Watershed-based Plans that include Nonpoint Source Pollution A. Identification of causes and sources, listed waters, pollutants, loads by watershed sub-categories, (crops, AFOs, urban, forestry, etc.) B. Estimate of load reductions by land use (or other) subcategories expected from BMPs C. Description of BMPs, How they are targeted (map suggested) D. Estimate of needed technical & financial resources E. Information/ Education component F. Schedule (who does what, when) G. Description of measurable milestones for implementation H. Criteria to determine if loadings/ targets are being achieved I. Monitoring component for above criteria

Watershed Planning Steps STEP 1 BUILD PARTNERSHIPS ID stakeholders ID stakeholders ID issues of concern ID issues of concern Set preliminary goals Set preliminary goals Develop indicators Develop indicators Conduct outreach Conduct outreach

Watershed Planning Steps STEP 1 BUILD PARTNERSHIPS ID stakeholders ID stakeholders ID issues of concern ID issues of concern Set preliminary goals Set preliminary goals Develop indicators Develop indicators Conduct outreach Conduct outreach STEP 2 CHARACTERIZE WATERSHED Gather existing data Gather existing data Create data inventory Create data inventory ID data gaps ID data gaps Collect additional data, if needed Collect additional data, if needed Analyze data Analyze data ID causes and sources ID causes and sources Estimate pollutant loads Estimate pollutant loads

Watershed Planning Steps STEP 1 BUILD PARTNERSHIPS ID stakeholders ID stakeholders ID issues of concern ID issues of concern Set preliminary goals Set preliminary goals Develop indicators Develop indicators Conduct outreach Conduct outreach STEP 2 CHARACTERIZE WATERSHED Gather existing data Gather existing data Create data inventory Create data inventory ID data gaps ID data gaps Collect additional data, if needed Collect additional data, if needed Analyze data Analyze data ID causes and sources ID causes and sources Estimate pollutant loads Estimate pollutant loads STEP 3 FINALIZE GOALS AND ID SOLUTIONS Set goals and management objectives Set goals and management objectives Develop indicators/targets Develop indicators/targets Determine load reductions needed Determine load reductions needed ID critical areas ID critical areas ID management measures needed ID management measures needed

k Watershed Planning Steps STEP 1 BUILD PARTNERSHIPS ID stakeholders ID stakeholders ID issues of concern ID issues of concern Set preliminary goals Set preliminary goals Develop indicators Develop indicators Conduct outreach Conduct outreach STEP 2 CHARACTERIZE WATERSHED Gather existing data Gather existing data Create data inventory Create data inventory ID data gaps ID data gaps Collect additional data, if needed Collect additional data, if needed Analyze data Analyze data ID causes and sources ID causes and sources Estimate pollutant loads Estimate pollutant loads STEP 3 FINALIZE GOALS AND ID SOLUTIONS Set goals and management objectives Set goals and management objectives Develop indicators/targets Develop indicators/targets Determine load reductions needed Determine load reductions needed ID critical areas ID critical areas ID management measures needed ID management measures needed STEP 4 DESIGN IMPLEMENTATION PROGRAM Develop Implementation schedule Develop Implementation schedule Set Interim milestones Set Interim milestones Determine how you will measure success Determine how you will measure success Develop monitoring component Develop monitoring component Develop evaluation process Develop evaluation process ID technical and financial assistance needed ID technical and financial assistance needed Assign responsibility Assign responsibility

k Watershed Planning Steps STEP 1 BUILD PARTNERSHIPS ID stakeholders ID stakeholders ID issues of concern ID issues of concern Set preliminary goals Set preliminary goals Develop indicators Develop indicators Conduct outreach Conduct outreach STEP 2 CHARACTERIZE WATERSHED Gather existing data Gather existing data Create data inventory Create data inventory ID data gaps ID data gaps Collect additional data, if needed Collect additional data, if needed Analyze data Analyze data ID causes and sources ID causes and sources Estimate pollutant loads Estimate pollutant loads STEP 3 FINALIZE GOALS AND ID SOLUTIONS Set goals and management objectives Set goals and management objectives Develop indicators/targets Develop indicators/targets Determine load reductions needed Determine load reductions needed ID critical areas ID critical areas ID management measures needed ID management measures needed STEP 4 DESIGN IMPLEMENTATION PROGRAM Develop Implementation schedule Develop Implementation schedule Set Interim milestones Set Interim milestones Determine how you will measure success Determine how you will measure success Develop monitoring component Develop monitoring component Develop evaluation process Develop evaluation process ID technical and financial assistance needed ID technical and financial assistance needed Assign responsibility Assign responsibility STEP 5 IMPLEMENT WATERSHED PLAN Implement management strategies Implement management strategies Conduct monitoring Conduct monitoring Conduct I/E activities Conduct I/E activities

k Watershed Planning Steps STEP 1 BUILD PARTNERSHIPS ID stakeholders ID stakeholders ID issues of concern ID issues of concern Set preliminary goals Set preliminary goals Develop indicators Develop indicators Conduct outreach Conduct outreach STEP 2 CHARACTERIZE WATERSHED Gather existing data Gather existing data Create data inventory Create data inventory ID data gaps ID data gaps Collect additional data, if needed Collect additional data, if needed Analyze data Analyze data ID causes and sources ID causes and sources Estimate pollutant loads Estimate pollutant loads STEP 3 FINALIZE GOALS AND ID SOLUTIONS Set goals and management objectives Set goals and management objectives Develop indicators/targets Develop indicators/targets Determine load reductions needed Determine load reductions needed ID critical areas ID critical areas ID management measures needed ID management measures needed STEP 4 DESIGN IMPLEMENTATION PROGRAM Develop Implementation schedule Develop Implementation schedule Set Interim milestones Set Interim milestones Determine how you will measure success Determine how you will measure success Develop monitoring component Develop monitoring component Develop evaluation process Develop evaluation process ID technical and financial assistance needed ID technical and financial assistance needed Assign responsibility Assign responsibility STEP 5 IMPLEMENT WATERSHED PLAN Implement management strategies Implement management strategies Conduct monitoring Conduct monitoring Conduct I/E activities Conduct I/E activities STEP 6 MEASURE PROGRESS AND MAKE ADJUSTMENTS Review and evaluate information Review and evaluate information Share results Share results Prepare annual plans Prepare annual plans Make adjustments to program Make adjustments to program

Capacity Building CB Strategy CB Strategy Funding catalog - & New Sustainable Funding web site - Cross Office Team Funding catalog - & New Sustainable Funding web site - Cross Office Team Smart Growth web site –Cross Office Team Smart Growth web site –Cross Office Team Watershed Academy – online courses Watershed Academy – online courses Monthly Web casts – wetlands, drinking water, Smart Growth Monthly Web casts – wetlands, drinking water, Smart Growth New Watershed Tools training New Watershed Tools training Watershed Handbook Training Watershed Handbook Training

Capacity Building Grants Targeted Watersheds Funds $ Million for FY2006/07 $ Million for FY2006/07 Geographic Focus Areas Geographic Focus Areas (Arid West, Great Plains, Appalachia) (Arid West, Great Plains, Appalachia) Up to 20% can be go to Mini-grants Up to 20% can be go to Mini-grants Targeted Watershed Grants Targeted Watershed Grants … in addition to NEPs … in addition to NEPs … in addition to NPS 319 … in addition to NPS 319

On the Technical Side Watershed Handbook being updated Watershed Handbook being updated Working with grantees to develop technical tools Working with grantees to develop technical tools AGNPS with CONCEPTS (bank erosion element) AGNPS with CONCEPTS (bank erosion element) VA Tech VA Tech SWAT AG BMP Optimization (Auburn CES) SWAT AG BMP Optimization (Auburn CES) AV-GWLF Penn State model being applied to New England AV-GWLF Penn State model being applied to New England Watersheds and Wetland Protection Guides Watersheds and Wetland Protection Guides “Plan Builder” On-Line Tool “Plan Builder” On-Line Tool “Watershed Central” “Watershed Central”

Technical Analysis Challenges in Planning addressed by our Handbook GIS and geographic data GIS and geographic data Statistical interpretation of data Statistical interpretation of data Modeling and Spreadsheet tools Modeling and Spreadsheet tools Defining the pollution reductions Defining the pollution reductions from BMPs for Nonpoint Sources from BMPs for Nonpoint Sources Setting up a monitoring program Setting up a monitoring program Evaluating changes due to management Evaluating changes due to management

A.Identification of causes and sources, listed waters, pollutants, loads by watershed sub-categories, (crops, AFOs, urban, forestry, etc.) Tools: Tools: NEMO land use assessments NEMO land use assessments Watershed Model s– Watershed Model s– SWAT / GWLF/ L-thia SWAT / GWLF/ L-thia BASINS, AGWA, CADDIS BASINS, AGWA, CADDIS WRAP WRAP State GIS Clearinghouses State GIS Clearinghouses

B. Estimate of load reductions by land use (or other) subcategory expected from BMPs Tools Tools Watershed models that incorporate BMPs Watershed models that incorporate BMPs AGWA AGWA GeoWEPP GeoWEPP BMP Research BMP Research WCS - R4 WCS - R4

C.Description of BMPs and how they are targeted (we suggest a map). Tools Tools BMP targeting BMP targeting (Penn State tool set) (Penn State tool set) PreDICT PreDICT NPS Tool NPS Tool AvGWLF AvGWLF Wisconsin Buffer Targeting Models USLE + “Snap- Plus”

D. Estimate of needed technical & financial resources Tools Tools Env Finance Centers - MD, BSU, others Env Finance Centers - MD, BSU, others EPA Funding Web Site EPA Funding Web Site Catalog of Federal Funding Catalog of Federal Funding EPA Watershed Funding Site Sustainable Finance Team

E. Information/ Education component Tools: Tools: Getting in Step Getting in Step Adopt Your Watershed Adopt Your Watershed Adopt Your Waterway Adopt Your Waterway NPS Outreach Tool Box NPS Outreach Tool Box

F. Schedule (who does what, when) Tools : Tools : Plan2Fund Plan2Fund State guides State guides EPA Watershed Approach Guides EPA Watershed Approach Guides State and Local

G. Description of measurable milestones for implementation Tools: Tools: Plan2Fund Plan2Fund 319 Project work plans 319 Project work plans Describes what is to be done, by whom, and when – interim “beans.” Describes what is to be done, by whom, and when – interim “beans.”

H. Criteria to determine if loadings/ targets are being achieved Tools: Tools: CADDIS (EPA) CADDIS (EPA) Rapid Bio-assessment Protocols Rapid Bio-assessment Protocols State WQStds and Assessment Methods State WQStds and Assessment Methods Wadeable streams, Wadeable streams, lakes, rivers studies

I. Monitoring component for above criteria Tools: Tools: Citizen Monitoring Guidance Citizen Monitoring Guidance LaMotte Chemical Company Monitoring LaMotte Chemical Company Monitoring Guides Guides EPA Volunteer Monitoring News EPA Volunteer Monitoring News National NPS Monitoring Program Case Studies National NPS Monitoring Program Case Studies State Cooperative Extensions State Cooperative Extensions State 303(d) Assessment Guidelines State 303(d) Assessment Guidelines Stream Corridor Guide Stream Corridor Guide

Incorporation Wetlands into Watershed Planning Process (CWP) / EPA Project

Section of Annotated Outline Climate/Precipitation Provide current and historic climate data for your watershed. Climate data provides information that is critical in evaluating the hydrology of an area. Information about temperature, rainfall, snowfall, and evapotranspiration, is used to simulate rainfall-runoff processes in watershed models. Local climatological data helps one to better understand the local water budget for the region and also helps for modeling purposes Surface Water Resources Identify all surface water features in the watershed. Surface water includes all water that is naturally open to the atmosphere, such as lakes, rivers, seas and reservoirs. In addition to being an important source of drinking water and recreation, these waters are also vital parts of local and regional ecosystems. Surface water pollution can result from a number of sources, including dredging, stormwater runoff, ocean dumping and industrial wastewater discharges. Your state Department of Environmental Quality can provide useful information on surface water, data inventory, maps and related issues. Data Sources Hyperlinks Hyperlinks Get/view online climate data National Weather Service Data Sources Hyperlinks Hyperlinks Surface water Surface Water

Search: GO