ILC Instrumentation R&D at SCIPP ILCWS ‘08 University of Illinois at Chicago November 22 2008 Bruce Schumm Santa Cruz Institute for Particle Physics.

Slides:



Advertisements
Similar presentations
Sci-Fi tracker for IT replacement 1 Lausanne 9. December 2010.
Advertisements

Electronics for large LAr TPC’s F. Pietropaolo (ICARUS Collaboration) CRYODET Workshop LNGS, March 2006.
INSTITUT MAX VON LAUE - PAUL LANGEVIN Fast Real-time SANS Detectors Charge Division in Individual, 1-D Position- sensitive Gas Detectors Patrick Van Esch.
Progress with 2D Microstrip Detectors with Polycrystalline Silicon Electrodes 19 th RD50 Workshop November 23 th CERN, Geneva D. Bassignana, M. Lozano,
Long Shaping-time Silicon Readout Bruce Schumm University of California, Santa Cruz Amsterdam ECFA-DESY Workshop April
SCIPP R&D on Time-Over-Threshold Electronics and Long-Ladder Readout Beijing Linear Collider Workshop Beijing, China February Bruce Schumm.
Long Shaping-time Silicon Readout Bruce Schumm UC Santa Cruz Arlington Linear Collider Workshop January
Victoria04 R. Frey1 Silicon/Tungsten ECal Status and Progress Ray Frey University of Oregon Victoria ALCPG Workshop July 29, 2004 Overview Current R&D.
SCIPP R&D on Long Shaping- Time Electronics SLAC SiD Workshop October 26-29, 2006 Bruce Schumm.
ILC R&D at SCIPP: Progress Report De-scoped ($97.5K) Proposal Activities Radiation Hardness for BeamCal sensors (new; with SLAC) KPiX/Double Metal Performance.
1 Chapter 6 Low-Noise Design Methodology. 2 Low-noise design from the system designer’s viewpoint is concerned with the following problem: Given a sensor.
SCIPP R&D on Time-Over-Threshold Electronics and Long-Ladder Readout Beijing Linear Collider Workshop Beijing, China February Bruce Schumm.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SiLC Meeting November 18, 2005.
Highlights from the Tracking Sessions 12 talks in three sessions Rough accounting: ILD SiD Generic OR- Gaseous Solid State
SCIPP R&D on the International Linear Collider Detector SCIPP Review May 18, 2006 Presenter: Bruce Schumm.
The SCIPP LSTFE Time-Over- Threshold Electronics Readout Project SILC Meeting, Santander, Spain December, 2008 Bruce Schumm Santa Cruz Institute.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LC Workshop January 6-10, 2004.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LCWS05 July 28-31, 2004.
Large Area, High Speed Photo-detectors Readout Jean-Francois Genat + On behalf and with the help of Herve Grabas +, Samuel Meehan +, Eric Oberla +, Fukun.
August SGSS front end, Summary August 2008 Edwin Spencer, SCIPP1 SGST Preview SCIPP, UC Santa Cruz Andrey Martchovsky Gregory Horn Edwin Spencer.
SCIPP R&D on Long Shaping- Time Electronics 4 th SiLC Meeting Barcelona, Spain (by remote connection) December Bruce Schumm.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LCWS05 July 28-31, 2004.
SCIPP R&D on Long Shaping- Time Electronics SLAC SiD Workshop October 26-28, 2006 Bruce Schumm.
SCIPP R&D on Linear Collider Tracking – Hardware and Simulation DOE Site Visit June Bruce Schumm Santa Cruz Institute for Particle Physics.
SCIPP R&D on Long Shaping- Time Electronics ALCPG Workshop Vancouver, BC, Canada July 19-22, 2006 Bruce Schumm.
SCIPP R&D on Time-Over- Threshold Electronics and Long- Ladder Readout LCWS 07 DESY May 30 – June Bruce Schumm Santa Cruz Institute for Particle.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz Victoria Linear Collider Workshop July 28-31, 2004.
Patrick Spradlin, SCIPP trip to LLU, May 2, 2001 Detector Characteristics.
SCIPP R&D on Linear Collider Tracking – Hardware and Simulation DOE Site Visit June Bruce Schumm Santa Cruz Institute for Particle Physics.
19 March 2005 LCWS 05 M. Breidenbach 1 SiD Electronic Concepts SLAC –D. Freytag –G. Haller –J. Deng –mb Oregon –J. Brau –R. Frey –D. Strom BNL –V. Radeka.
© 2012 Pearson Education. Upper Saddle River, NJ, All rights reserved. Electronic Devices, 9th edition Thomas L. Floyd Electronic Devices Ninth.
Introduction to Op Amps
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
SiD EMCal Testbeam Prototype M. Breidenbach for the SiD EMCal and Electronics Subsystems.
Semiconductor detectors
Unit II BJT Amplifiers.
Preliminary LumiCAL FEE Specification Presented by Alexander Solin NC PHEP FCAL collaboration meeting, February 12-13, 2006, Krakow (INP PAS),
Silicon Microstrip R&D at SCIPP and the University of California at Santa Cruz Future Linear Colliders Spanish Network Universidad de Sevilla February.
Sally Seidel 1 3D Sensor Studies at New Mexico Sally Seidel for Martin Hoeferkamp, Igor Gorelov, Elena Vataga, and Jessica Metcalfe University of New Mexico.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz Cornell LC Workshop July 13-16, 2003.
LCFI Collaboration Status Report LCUK Meeting Oxford, 29/1/2004 Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, QMUL,
ILC Tracking R&D at SCIPP SiD Workshop Thursday, June Bruce Schumm Santa Cruz Institute for Particle Physics.
Chevron / Zigzag Pad Designs for Gas Trackers
Highlights From ILC R&D at SCIPP LCWS 2010 Friendship Hotel, Beijing, PRC March Bruce Schumm Santa Cruz Institute for Particle Physics.
ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics.
Fundamentals of Electric Circuits Chapter 5 Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
ILC Instrumentation R&D at SCIPP ILCWS ‘08 University of Illinois at Chicago November Bruce Schumm Santa Cruz Institute for Particle Physics.
ILC Instrumentation R&D at SCIPP ALCPG ‘09 University of New Mexico September 29 – October Bruce Schumm Santa Cruz Institute for Particle Physics.
R&D Towards a Linear Collider Detector DOE Site Visit Wednesday July 27, 2011 Senior: Fadeyev, Schumm, Spencer Students: Bogert, Carman **, Chappelletvolpini.
SCIPP R&D on the International Linear Collider Detector DOE Site Visit June 28, 2005 Presenter: Bruce Schumm.
Development of radiation hard Sensors & Cables for the CBM Silicon Tracking System Sudeep Chatterji On behalf of CBM-STS Collaboration GSI Helmholtz Centre.
Tracking R&D at SCIPP: Charge Division Long Ladder Readout Noise Non-Prompt Tracks with SiD CERN Linear Collider Workshop October
SCIPP R&D on the International Linear Collider Detector DOE Site Visit June 8, 2006 Presenter: Bruce Schumm.
MuTr Chamber properties K.Shoji Kyoto Univ.. Measurement of MuTr raw signal Use oscilloscope & LabView Read 1 strip HV 1850V Gas mixture Ar:CO 2 :CF 4.
Silicon Microstrip Tracking R&D in the US SiLC Collaboration Meeting University of Paris VII January 25, 2010 Bruce Schumm Santa Cruz Institute for Particle.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
ILC Instrumentation R&D at SCIPP ALCPG ‘09 University of New Mexico September 29 – October Bruce Schumm Santa Cruz Institute for Particle Physics.
ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics.
Thought on SCIPP’s Participation in SiLC Test Beam Activities
Fundamentals of Electric Circuits Chapter 5
Time-Over-Threshold Readout Long Ladder Readout Noise
Wide Dynamic range readout preamplifier for Silicon Strip Sensor
Radiation Damage Studies for Solid State Sensors Subject to Mrad Doses
Radiation Damage Studies for Solid State Sensors Subject to MRaD Doses
ILC Instrumentation R&D at SCIPP
A Fast Binary Front - End using a Novel Current-Mode Technique
BESIII EMC electronics
Fundamentals of Electric Circuits Chapter 5
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
Chapter 5 Operational Amplifiers
Presentation transcript:

ILC Instrumentation R&D at SCIPP ILCWS ‘08 University of Illinois at Chicago November Bruce Schumm Santa Cruz Institute for Particle Physics

Faculty/Senior Vitaliy Fadeyev Alex Grillo Bruce Schumm Collaborator Rich Partridge Undergrads Sean Crosby Jerome Carman Jared Newmiller Ryan Stagg The SCIPP/UCSC SiLC/SiD GROUP (Harwdare R&D Participants) Lead Engineer: Ned Spencer Technical Staff: Max Wilder, Forest Martinez-McKinney All participants are mostly working on other things (BaBar, ATLAS, biophysics…) Students: undergrad physics and/or engineering majors at UCSC

Recent Areas of Inquiry ILC-Specific LSTFE front-end chip development SiD sensor testing Generic Charge division and longitudinal resolution Noise sources in high-resolution limit

1-3  s shaping time (LSTFE-I is ~1.2  s); analog measurement is Time-Over-Threshold Process: TSMC 0.25  m CMOS The LSTFE ASIC

1/4 mip 1 mip 128 mip Operating point threshold Readout threshold High gain advantageous for overall performance (channel matching)

Noise vs. Capacitance (at  shape = 1.2  s) Measured dependence is roughly (noise in equivalent electrons)  noise = *C with C in pF. Experience at 0.5  m had suggested that model noise parameters needed to be boosted by 20% or so; these results suggest 0.25  m model parameters are accurate  Noise performance somewhat better than anticipated. Observed Expected 1 meter EQUIVALENT CAPACITANCE STUDY

LSTFE-II Prototype Additional “quiescent” feedback to improve power- cycling switch-on from 30 msec to 1 msec Improved environmental isolation Additional amplification stage to improve S/N, control of shaping time, and channel-to-channel matching Improved control of return-to-baseline for < 4 mip signals (time-over-threshold resolution) 128 Channels (256 comparators) read out at 3 MHz, multiplexed onto 8 LVDS outputs Testing underway by end of calendar year

SiD Sensor Testing SiD 10cm x 10cm “tile” intended for “KPIX” kilo-channel bump-bond ASIC. Resistance from strips as well as traces. First look by SCIPP (Sean Crosby) Also looked at “charge division” sensor; want to read out 600 k  implant at both ends; confirmed strip that shorts implant (268  ) mistakenly added by manufacturer. (Would like to savage one to measure implant resistance)

Sensors bias at ~50 V. Capacitance shown is for all 1840 strips, but strips to backplane only SiD Tiles: Biasing and Plane-to-Plane Capacitance For now: single sensor (sensor #26)

SiD Leakage Current (sensor #26): Average leakage for 1840 channels is about ~160 pA/channel Measured strip and trace resistances for two sensors: Sensor Number Strip Res.Typical Trace Res Looks a bit odd (just first blush still…)

Longitudinal Resolution via Charge Division Proposed by Rich Partridge, based on seminal paper by Radeka: V. Radeka "Signal, Noise and Resolution in Position-Sensitive Detectors", IEEE Trans. Nucl. Sci. 21, 51 (1974), which in turn references earlier work with planar sensors from R.B. Owen and M.L. Awcock, IEEE Trans. Nucl. Sci. 15, 290 (1968) Small ($16K) LCRD grant supports this work. Progress due to UCSC undergraduate physics major Jerome Carman Basic idea: For resistive sensor, impedances dominated by sensor rather than amplifier input impedance  charge should divide proportional to point of deposition. So, forget about metal strip and read out implant (~100k  )

Charge Division Sensor Mock-Up 10-stage RC network PC board (Jerome Carman)

Amplifiers: First Stage: TI OPA657 Low-noise FET OpAmp Later Stages: Analog Devices ADA4851 rail-to-rail video amp Charge Division Sensor Mock-Up Model 600 k  resistive implant with 10-stage RC network Read out at both left (“L”) and right (“R”) ends

Readout Noise Results Try several configurations, looking at noise from RH amp Nominal 0.64 fC Short RH amp input (163  to ground) 0.26 fC Disconnect LH amp and short that end to ground 0.66 fC Disconnect LH amp and float that end 0.44 fC

Correlation Between Left and Right Readout Naïve expectation: Dominated by Johnson noise across resistive implant  Noise should be anticorrelated  Bad for position resolution Result: Observed correlation (3%) consistent with 0. Good news, but why?

Correlation Between Left and Right Readout Cont’d Replace network with single 600 k  resistor  Anticorrelation observed Network effects appear to de-cohere Johnson noise currents

Longitudinal Resolution Estimate Trying to measure fractional distance f from right to left end of strip: Rewrite: Then, and dL, dR apparently uncorrelated.

Longitudinal Resolution Estimate: Conclusion Depends upon location of hit (middle or near end of resistive implant) and the magnitude of the charge deposition. Assume a 4 fC deposition in the middle of the strip (x=1): However, note that, so this is not much better.  Optimize shaping time, implant resistivity, ?  Goal of better than 0.1 (1cm for SiD sensors).

Readout Noise for Linear Collider Applications Use of silicon strip sensors at the ILC tend towards different limits than for hadron collider or astrophysical applications:  Long shaping time  Resistive strips (narrow and/or long) But must also achieve lowest possible noise to meet ILC resolution goals. How well do we understand Si strip readout noise?

Standard Form for Readout Noise (Spieler) Series Resistance Amplifier Noise (series) Amplifier Noise (parallel) Parallel Resistance F i and F v are signal shape parameters that can be determined from average scope traces.

LONG LADDER CONSTRUCTION

Measured Noise vs. Sum of Estimated Contributions 72 cm Ladder Estimated Johnson noise for actual 65  m strip (part of estimate) Projected Johnson noise for 20  m strip (not part of estimate) Measured noise Sum of estimates 143 cm Ladder Noise calculation assuming 20  m strip width (actual is 60  m)

Strip Noise Idea: “Center Tapping” – half the capacitance, half the resistance? Result: no significant change in measured noise However, sensors have 237  m pitch  Currently characterizing CDF L00 sensors Measured noise Expected noise, assuming 75% reduction in strip noise

CDF L00 Sensor “Snake” CDF L00 strips: 310 Ohms per 7.75cm strip (~3x GLAST)  Long-ladder readout noise dominated by series noise (?) Construct ladder by bonding strips together in “snake” pattern (Sean Crosby) At long shaping-time, bias resistors introduce dominant parallel noise contribution  Sever and replace with custom biasing structure (significant challenge…) Thanks to Sean Crosby, UCSC undergraduate thesis student

CDF L00 Sensor “Snake” CDF L00 “Snake” LSTFE1 chip on Readout Board

CDF L00 Sensor “Snake” CDF L00 “Snake” LSTFE1 chip on Readout Board

(After lengthy effort to eliminate non- fundamental noise sources) What happens when we add more CDF modules? Can we understand “extra” CDF noise by studying shaping-time dependence? Strip noise contribution should be negligible Strip noise should dominate after ~5 sensor lengths

Conclusions