Changing the absorbers: how does it fit in the MICE experimental programme? Besides the requirement that the amount of multiple scattering material be.

Slides:



Advertisements
Similar presentations
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
Advertisements

January 14, 2004 TJR - - UPDATED 1/25/04 1 MICE Beamline Analysis Using g4beamline Including Jan 25 Updates for Kevin’s JAN04 Beamline Design Tom Roberts.
1 Acceptance & Scraping Chris Rogers Analysis PC
Emittance definition and MICE staging U. Bravar Univ. of Oxford 1 Apr Topics: a) Figure of merit for MICE b) Performance of MICE stages.
FIGURE OF MERIT FOR MUON IONIZATION COOLING Ulisse Bravar University of Oxford 28 July 2004.
MICE the Muon Ionization Cooling Experiment Emilio Radicioni, INFN EPS-HEP Aachen 2003.
Magnet quench during a training run Magnet electrical circuit schematic PROGRESS ON THE MODELING AND MODIFICATION OF THE MICE SUPERCONDUCTING SPECTROMETER.
Particle ID in the MICE Beamline MICE Collaboration Meeting 30 March Paul Soler, Kenny Walaron University of Glasgow and Rutherford Appleton Laboratory.
1 26 Nov 2010 SOLID ABSORBERS Solid absorbers will provide first cooling demonstration –This is important for a number of reasons! Can use only solids.
CHIPP Sept 2005Jean-Sébastien GraulichSlide 1 What is MICE  Muon Ionisation Cooling Experiment  What is Ionisation Cooling ? Cooling = Reduction of Beam.
Alain Blondel MICE: Constraints on the solenoids 2.Field Homogeneity: or ? this will be dictated by the detector requirements. TPG will be.
OPTICS UPDATE Ulisse Bravar University of Oxford 3 August 2004.
1 PID status MICE Analysis phone conference Rikard Sandström.
Chris Rogers, MICE CM16 Wednesday Plenary Progress in Cooling Channel Simulation.
Controls Review  Want to record a full configuration of the experiment at every possible “event”, including controls data.  Event trigger = accelerator.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
MICE analysis meeting Alain Blondel 5 August MICE -- what running strategy? disclaimer: of course we will evolve the running strategy as problems.
MICE Experiments Introduction Introduction Disclaimers Disclaimers Assumptions Assumptions Baseline programme Baseline programme Full programme Full programme.
1 Progress on the MICE Cooling Channel Magnets Michael A. Green Lawrence Berkeley National Laboratory 28 June 2005.
MANX meeting 15 July 2008 Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment MICE in 2011.
Mark Rayner, Analysis workshop 4 September ‘08: Use of TOFs for Beam measurement & RF phasing, slide 1 Use of TOFs for Beam measurement & RF phasing Analysis.
Overview of Experiment and Parameter Choices presented by Giles Barr.
04/01/2006MICE Analysis Meeting1 MICE phase III M. Apollonio, J. Cobb (Univ. of Oxford)
1 Tracker Window & Diffuser Radius vs Scraping Aperture Chris Rogers Analysis PC 6th April 06.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
MB1 T.O.F. II Precise timing Electron ID Eliminate muons that decay Tracking devices T.O.F. 0 & I Pion /muon ID precise timing 201 MHz RF cavities Liquid.
MICE magnetic measurements Sequence of events and MICE hall movements Alain Blondel – 10-April 2012 revision from 13 December 2012.
MICE Video meeting Alain Blondel 7 December MICE -- what running strategy? reflections on steps I and II.
17 March 2005Edda Gschwendtner1 MICE Cooling Channel: Can we predict cooling to ? Edda Gschwendtner Challenge Systematics Cooling Channel Beam Line.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
Fast TOF for Muon Cooling Experiments Robert Abrams Muons, inc.
Physics Program and Runs: Autumn 2011 & Step IV V. Blackmore MICE Project Board, 08/03/12.
CM37 Alain Blondel step IV physics success 1 « STEP IV operations : Physics »
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
Goals and Status of MICE The International Muon Ionization Cooling Experiment J.S. Graulich.
Particle Production in the MICE Beam Line Particle Accelerator Conference, May 2009, Vancouver, Canada Particle Production in the MICE Beam Line Jean-Sebastien.
MICE collaboration meeting Alain Blondel 27 – Welcome to the 10th MICE collaboration meeting. 1.Global neutrino factory situation 2.Possible.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Results from Step I of MICE D Adey 2013 International Workshop on Neutrino Factories, Super-beams and Beta- beams Working Group 3 – Accelerator Topics.
ICHEP 2012 Melbourne, 7 July 2012 Paul Soler on behalf of the MICE Collaboration The MICE Beam Line Instrumentation (Trackers and PID) for precise Emittance.
1 Forces Yury Ivanyushenkov RAL. 2 Goal: find maximal (static and dynamical) possible forces in MICE magnetic system. Method: calculation of axial magnetic.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
MICE RF Workshop Alain Blondel MICE = critical R&D for neutrino factory and muon collider 1 neutrino factory: accelerate muons and store to produce.
Controls for Particle ID/tracking in MICE 1.Physics and systematics 2.Controls types 3.Controls list 4.Needed for particle ID/tracking M. A. Cummings May.
MICE: The International Muon Ionisation Cooling Experiment MOPLT106 Abstract The provision of intense stored muon beams would allow the properties of neutrinos.
1M. Ellis - NFMCC - 31st January 2007 MICE Analysis.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
- MICE - The Muon Ionization Cooling Experiment Jean-Sebastien Graulich, Univ. Genève o Introduction: Aims And Concept o Design o Infrastructure: Hall,
MICE RF review Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
Controls and monitoring in MICE 1.Physics and systematics 2.Controls types 3.Controls list 4.Data record M. A. Cummings April 2004 CERN.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
1 OPTICS OF MICE STEP V.0 Ulisse Bravar University of New Hampshire 26 June 2005.
Monte Carlo simulation of the particle identification (PID) system of the Muon Ionization Cooling Experiment (MICE) Mice is mainly an accelerator physics.
(one of the) Request from MPB
MICE S TEP IV P HYSICS ‘D ELIVERABLES ’ V. Blackmore MAP 2014 Spring Meeting 30 th May, /15 AKA “What will we learn from Step IV?”
S TATUS OF THE P HYSICS A NALYSIS V. Blackmore MICE Project Board 29 th April, /30.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
MICE news Alain Blondel 20 – NEWS 1.CERN’s SPSC at Villars: recommandations 2.MICE step Upcoming gateway steps 4.RF from LBNL (Mike)
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
MICE Step IV Lattice Design Based on Genetic Algorithm Optimizations
Why do we need to know the fields / map the magnets?
MICE The International Muon Ionisation Cooling Experiment
M. Migliorati, C. Vaccarezza INFN - LNF
The Muon Ionization Cooling Experiment: Controls and Monitoring
Impact of Magnet Performance on the Physics Program of MICE
How to turn on MICE Step IV
The Detector System of the MICE Experiment
Presentation transcript:

Changing the absorbers: how does it fit in the MICE experimental programme? Besides the requirement that the amount of multiple scattering material be minimum, the physics request from MICE on the absorbers is also that of variability Which materials? Which variability? in which context and how often? let us first have a look at the running scenario

Consider the baseline MICE measurement: Optics = nominal optics with 3 flips (spectrometer coupling coupling and spectrometer with polarities) beta function = 42 cm, nominal momentum 200 MeV/c DE=-10.5MeV in all three absorbers and MeV in the RF cavities on crest. to do an emittance in/out curve one needs diffuser thickness all the way from the minimum to 4 X0, probably 5 points and to cover the momentum range one needs to set the beam at steps of about one rms. (such as 150, 175, 200, 225, 250 MeV/c) This gives 25 points to measure, in principle each taking 20 minutes, (for 10-3 precision) plus time for changeovers... a good 24 hours of very busy data taking. (how long does it take to change diffuser thickness? how long does it take to change beam momentum?) (this will come after several months of debugging which can be done with plastic or whatever is most practical)

 Incoming muon beam Diffusers 1&2 Beam PID TOF 0 Cherenkov TOF 1 Trackers 1 & 2 measurement of emittance in and out Liquid Hydrogen absorbers 1,2,3 Downstream particle ID: TOF 2 Cherenkov Calorimeter RF cavities 1RF cavities 2 Spectrometer solenoid 1 Matching coils Focus coils 1 Spectrometer solenoid 2 Coupling Coils 1+2 Focus coils 2 Focus coils 3 Matching coils

Beam possible design for absorber II remote control 4 X 0

a series of measurements to determine equil. emitance A determination of equil. emittance is essential in view of a muon cooling ring

A series of measurements

Now if one wants to redo this for the 6 optical configurations of the proposal (various betas and nominal momentum), this will take 6 days. Then time has come to change the absorbers (2 weeks intervention?) and to take data again for three weeks etc. It soon becomes evident that a full summer will be very usefully spent if all goes well *and* if we have the beam solenoid. §Repeat for the different polarities (solenoid mode) and one has an intense 3 weeks of data taking period with a given set of absorbers and RF volts... if all goes well.

The last parameter to investigate is RF volts. This can be done in several ways. -- connect the 8 MW RF power all to one 4-cavity module. This increases the local volts by sqrt(2), (and decreases the overall voltage by sqrt(2)) -- operate at L N2 temperature this allows increase of gradient and volts by 1.5 to combine the two allows to reach a gradient of over 16 MV/m in one 4-cavity module obviously this is a major operation that requires lots of RF work. at the same time this will be the ONLY moment where one would need to change the thickness of the LH2 abosrbers to protect the detectors.

e-e-  e-e- The absorber plays a role beyond provideing dE/dx: protects trackers against RF electrons! This is helped by the magnetic field…. But only in the flip situation.

Preliminary conclusion: At least for the first year of operation the thickness of LH2 absorber will not need to be changed. It will be required to change the absorber to other materials to investigate their qualities MICE aims at observing cooling precisely and measure the equilibrium emittance precisely (relevant for cooling ring and Muon collider) Changing the thickness of absorber will come when investigating operation with higher gradients and will come along with other major hardware modifications (to the RF)