DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Control and Monitoring of PID Detectors o Disclaimer o Remarks on Control and Monitoring: 1) Missions.

Slides:



Advertisements
Similar presentations
Software Summary Database Data Flow G4MICE Status & Plans Detector Reconstruction 1M.Ellis - CM24 - 3rd June 2009.
Advertisements

Daresbury Aug 2005Jean-Sébastien Graulich Detector DAQ Overview and Needs Jean-Sebastien Graulich, Univ. Genève o Introduction o Detector Systems Overview.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Wrap Up o Control and Monitoring o DDAQ o Interface between DDAQ and MCM o Infrastructure Jean-Sebastien.
Workshop Goals MICE Controls and Monitoring Workshop September 25, 2006 A. Bross.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 DDAQ Hardware Architecture o General Architecture o Tracker Baseline o TOF Baseline & Options o EmCal Baseline.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ for BTF o BTF Overview o Hardware Overview o DAQ Software Description o What’s next o Summary Jean-Sebastien.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Detector DAQ Test bench in Geneva o Preparing for Test Beam o FE electronics tests o Detector.
1 Online data quality and monitoring M. Ellis Daresbury DAQ Meeting 31 st August 2005.
Feb 2006Jean-Sébastien Graulich PID Front End Electronics, Outlook after DAQ Workshop 02 Jean-Sebastien Graulich, Univ. Genève o Introduction o Tracker.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 Does IPM System Matches MICE needs ? Personal Understanding and Remarks o General Considerations o Front.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DDAQ Pending Issues o Detector FEE o Software framework o Trigger o Data Storage Jean-Sebastien Graulich,
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Report on FEE for PID o Reminder o TOF o EMCAL o Summary Jean-Sebastien Graulich, Geneva.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Interface between Control & Monitoring and DDAQ o Introduction o Some background on DATE o Control Interface.
VC Sept 2005Jean-Sébastien Graulich Report on DAQ Workshop Jean-Sebastien Graulich, Univ. Genève o Introduction o Monitoring and Control o Detector DAQ.
MICE CM17 Feb 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM16 o Detector DAQ software o Front End Electronics o Schedule Milestones o.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
MICE VC March 2009Jean-Sebastien GraulichSlide 1 EMR Status o Introduction o News o Detector Design o Simulations o Responsibilities o Plan Jean-Sebastien.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 7 September, 2009.
SSD Operations Manual March 2014 SSD: 4 th layer of vertex detector Heavy Flavor Tracker Silicon Strip Detector – Operations Manual PXL Inserted from this.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Online Summary o Detector DAQ o Controls And Monitoring o Online Data Base o Bottom Lines Jean-Sebastien.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Detector DAQ Hardware Status o Introduction o Preliminary list o Plan for action o Summary Jean-Sebastien.
MICE CM18 June 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM17 o Detector DAQ software o Front End Electronics o Schedule Milestones.
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
ATLAS MDT Power Supply DCS Anastasios Iliopoulos 15/08/2006.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM15 o Detector DAQ software o Interface DDAQ / Mice Control & Monitoring.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
TPC Prototype III TPC module anode HV edge LV module analog digital Cool sensor Gas sensor Shift Expert DCS Ch Skirt.
Muon System Safety Issues Burkhard Schmidt.
Controls EN-ICE Finite States Machines An introduction Marco Boccioli FSM model(s) of detector control 26 th April 2011.
MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Control and Monitoring Summary of DAQ WS III o General Architecture o RF System C&M o D0 EPICS extensions.
Commissioning and Operation of the CMS Tracker analogue optical link system at TIF with CMSSW: R.Bainbridge, A.Dos Santos Assis Jesus, K.A.Gill, V. Radicci.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Mice CM Oct 2005Jean-Sébastien GraulichSlide 1 MICE Collaboration Meeting Oct05 Review of DAQ Workshop and DAQ Issues Jean-Sebastien Graulich, Univ. Genève.
PHOS DCS guide (for PVSS based products only) Alexander Mamonov Last update: 1 th October, 2010.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
FOPI – Slow Control Content 1.FOPI experiment - Overview 2.GUIs for FOPI 3.System Design.
Online Reconstruction 1M.Ellis - CM th October 2008.
MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.
E-log is a very clever software written by Steffen Ritt from PSI It can do lots of things and can be used well. Will give you an example of use by NA61.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
NA62 straw tracker DCS Straw tracker overview Bulk power supply Power supply distribution and monitoring LV + monitoring HV Temperature monitoring Gas.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
Online Consumers produce histograms (from a limited sample of events) which provide information about the status of the different sub-detectors. The DQM.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Report on DAQ & CAM o Detector DAQ Status Hardware Trigger Software o Controls and Monitoring (CAM) o.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
TPC ALARM HANDLER In addition to the big slow controls alarm handler I usually ran a TPC only alarm handler as a separate process. The TPC alarm handler.
19/10/11FV 1 Behavior of generic HV channel. Mail’s survey: appeal for general policy VF2 19/10/11 Patrizia: “Based on the running experience of NA48,
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
CLAS12 ECAL PCAL DC FTOF... Region 2 DewPnt Region 3 Region 4 Region 1 Mod 1... Mod 2 HV TEMP LV Hierarchy of Slow Controls: Driven by Finite State Machine.
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
Control systems Detector Safety System (DSS) (no action available for an operator) Display of CERN Level 3 alarms and protection of NA62 hardware Detector.
Jean-Sebastien Graulich, Geneva
Control systems Detector Safety System (DSS) (no action available for an operator) Display of CERN Level 3 alarms and protection of NA62 hardware Detector.
Controls & Monitoring in MICE
The IFR Online Detector Control at the BaBar experiment at SLAC
The IFR Online Detector Control at the BaBar experiment at SLAC
The Online Detector Control at the BaBar experiment at SLAC
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Control and Monitoring of PID Detectors o Disclaimer o Remarks on Control and Monitoring: 1) Missions 2) Settings and Variables 3) The Finite State Machine Approach o PID C&M Logical Description o The ideal GUI o Summary Jean-Sebastien Graulich, Geneva

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 2 Disclaimer  Control and Monitoring of one detector should be under the responsibility of the group building the detector…  I have no experience in developing C&M systems  No concrete activity is possible before the hardware is chosen In particular, the HV system is not defined yet for TOF, CKOV and EMCAL !

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 3 Remarks on C&M  My understanding of Control: Set all the parameters required for the experiment to run in a given configuration What to do in case of *Event* The Event can be anything between “Voltage of Channel X is 1V above the nominal value” to “the physicist wants to start data taking” Monitoring: What is the state of a Subsystem at a given time (could be now) This implies the knowledge of all the values of variables and settings

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 4 PID Settings and Variables  HV Settings (usual ones, may change when the HV system is chosen): HV Set Point MICE-DET-HVPS-01:001:HVSP Range Level 1 (Dead band) MICE-DET-HVPS-01:001:RL1 Range Level 2 (Warning Level) MICE-DET-HVPS-01:001:RL2 Range Level 3 (Alarm Level) MICE-DET-HVPS-01:001:RL2 Imax L0 MICE-DET-HVPS-01:001:IMX0 Imax L1 Trip TimeMICE-DET-HVPS-01:001:TRPT Ramping Up Parameter MICE-DET-HVPS-01:001:RUP Ramping Down Parameter MICE-DET-HVPS-01:001:RDP  HV Variables: Actual VoltageMICE-DET-HVPS-01:001:HVV Actual Current MICE-DET-HVPS-01:001:IV Status (Normal, Tripped,MICE-DET-HVPS-01:001:STA Ramping up, Ramping Down)  Other Variables: Hall Temperature (for TOF) VME crate Status Define when the channel will be switched off automatically X 110 for TOF X 240 for EMCAL X ? For CKOV Idem

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 5 PID C&M Logical Description  Object: TOF_HV  Object: TOF_HV (the group of all the TOF_HV_CH) State: ALL_ACTIVE (All channels are ON, none is INACTIVE) State: PART_ON (Some Channels are ON but not all of them) State: OFF (All channels are OFF) State: OUT_OF_RANGE_L1 (idem for OUT_OF_RANGE_L2 and OUT_OF_RANGE_L3) (Some channels are in OVERFLOW_L* or UNDERFLOW_L*) State: TRIPPED (Some channels are TRIPPED) State: UPDATING (Some channels are UPDATING) State: COM_ERROR (Some channels are in COM_ERROR)

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 6 TOF0 TOF1 TOF2 USCDSC Tracker 1 Tracker 2 EMCAL  The Ideal GUI  Each Detector has a color:  Each Detector has a color: Green= FULL_READY Yellow= OUT_OF_RANGE_L2 Red= OUT_OF_RANGE_L3 or TRIPPED or NOT_READY White= INACTIVE  Each Detector is clickable, a panel pops up with the status of each individual channel  The same panel can be used to edit the settings, providing a password

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 7 Summary  PID Control is basically limited to the Control of HV Channels 110 Channels for TOF 240 Channels for EMCAL A few Channels for CKOV  Time to think about User requirement for the Detector C&M GUI And also to assign this task to someone…