Status Update for P09321 Automatic Medicine Dispenser.

Slides:



Advertisements
Similar presentations
Virtualization Revisited Diversified Internet Project (Wash U) Cabo Project (GaTech, Princeton, UMass) Ambassadors from Reality (AT&T, Google)
Advertisements

CREATING THE FUTURE THROUGH ACTIONABLE PLANS Leadership Institute March 2006.
Implementation I - demo. Schedule * Project status -achieving the goals of the iteration -project metrics * Used work practices * Work results -presenting.
Project Status E911 Provisioning System Royal Flush Software Kevin Francis, Jason Plaisted, Jessica St. Croix, Mike O’Connor, Derrick Hudson.
Harris JTRS Project The A-Team Garrett Wampole Ben Litchfield Jason Offord Jason Gillman David Bryant.
Project Overview E911 Provisioning System Royal Flush Software
EDGE™ Final Project Presentation P09141 – Satellite Thermal Heater Controller Anthony Berwin (Mechanical Engineer)
Team Members: Jon Klein Nguyen Vu Kyle Menges Christine Lowry Chris Stein Priya Narasimhan Julie Coggshall Week 2 – End Of Day:  Progress Update  Concept.
Claims Service-Oriented Architecture Performance Prototype Team Hooloovoo.
Mid-term evaluation. Midterm evaluation meeting Purpose of the meeting is to evaluate individuals and their contribution to the team effort Grading pass/fail.
Prepared by: Harvard University, Office of the UCIO Harvard University IT Services Integration Initiative Program Management Planning Meeting January 10,
P09321 A UTOMATED M EDICINE D ISPENSER Justin Zagorski (IE) – Project Lead Rebecca Jaiven (EE) – Lead Engineer Michael Boquard (CE) Matthew Jones (ME)
1 Systems Design Review Group P14345 Team Lead: William Sender Jeffrey Auclair Bryan Beatrez Michael Ferry.
ISO Tor Stålhane IDI / NTNU. What is ISO ISO 9001 was developed for the production industry but has a rather general structure ISO describes.
Status Report #1 LYRA The Remote Accessible Automated Camera Stand Developed by: Juan Cuellar, Nathan Dye, Timothy Hawley, & Matthew Hect September 17,
ARC Customer Conference IT Security Services June 9, 2010.
Status Report # 1 Home Security Wire Protection System Ronald, Robert, Orlando, Jaime An interfacing module to communicate with previously designed protective.
IT Services Transition Weekly Program Management Working Session January 19, 2011 | Wednesday | 10:00am – 12:00pm.
T Project Review Vihannekset PI Phase
By Wayne Sibley Information Engineering Technology University of Cincinnati College of Applied Science.
U.S. Department of Agriculture eGovernment Program Prototype Weekly Status Meeting July 1, 2003.
RSS News Feed Generator Team Even Steven Phil Light, Carol Coon, Madura Mahenhthiran, Becky Vanderhoff, Chris Mamorella, Lars Avery.
Individual Subsystem Testing Report New Jersey Space Grant Consortium with Rutgers University Stevens Institute of Technology 2/13/2012.
Project Active Vibration Cancellation. The Team NameDisciplineRole Kaitlin PeranskiIndustrial and SystemsProject Leader/ Edge Updating Jeremy BerkeElectricalScribe.
Engineering Design Process
CSE Senior Design II Day 1: Getting Organized Spring 2015 Instructor: Manfred Huber.
MSD 1 WEEK 6 SYSTEM DESIGN REVIEW Team Rochester Institute of Technology College of Engineering P /2/
MSD Total Supplier Performance and Inventory Control Keleigh Bicknell, William Darlington, Alex Resnick, Brian Woodard.
MSLM Consulting Inc. The Travel Experts Friday November 12,
Status Report #4 LYRA The Remote Accessible Automated Camera Stand Developed by: Juan Cuellar, Nathan Dye, Timothy Hawley, & Matthew Hect October 8, 2012.
ESSRT Status Report as of July 31, 2013
MSD 1 WEEK 6 SYSTEM DESIGN REVIEW Team Rochester Institute of Technology College of Engineering P /2/
Your Interactive Guide to the Digital World Discovering Computers 2012 Chapter 12 Exploring Information System Development.
Overview of the Web Development Process.  Website Strategic Plan (Planning)  Content and Site Architecture (Planning)  Website Strawman (Planning)
John Deere Team Weekly Status Report Week 3 Josh Ebeling Jamari Haynes James June Mike Reno Ben Spivey Gary Twedt.
Complete Design & Gate Review. Complete Design Detailed Design Review (DDR) 1.“High and medium technical risk” areas –Design Review (Prelim-DDR): standard.
CSE Senior Design II Day 1: Getting Organized Spring 2012 Instructor: Mike O’Dell.
What has been accomplished at the end of MSD 1 & 2?
CSE Senior Design II Day 1: Getting Organized Spring 2016 Instructor: Mike O’Dell.
APRIL 10, Meeting Agenda  Prototype 2 Goals  Robust Connections Demo  System Diagnostics Tool Demo  Final Prototype Risk Mitigation  Final.
APRIL 10, Meeting Agenda  Prototype 2 Goals  Robust Connections Demo  System Diagnostics Tool Demo  Final Prototype Risk Mitigation  Final.
EDGE™ Final Project Plan Presentation P09001 – RFID Reader & Active Tag Philip Davenport (Industrial and Systems Engineering)
UOP WEB 237 Complete Class Check this A+ tutorial guideline at For more classes visit.
WEB 237 Week 5 Learning Team Finalized Paper Only Submit the eCommerce analysis paper and prototype Check this A+ tutorial guideline at
STAYER BUS 599 Week 6 Project Deliverable 3 Ethics and Social Responsibility Plan Check this A+ tutorial guideline at
Day 1: Getting Organized Spring 2014
“Warm-Up” Knowledge Review Week 2: Problem- Solving Boot Camp I
Remind students to connect to the WiFi

Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
PM 598 Competitive Success-- snaptutorial.com
PM 598 RANK Education Your Life / pm598rank.com
PM 598Competitive Success/tutorialrank.com
PM 598 RANK Lessons in Excellence-- pm598rank.com.
PM 598 Education for Service-- snaptutorial.com
PM 598 Teaching Effectively-- snaptutorial.com
PM 598 knowledge is divine-- snaptutorial.com. PM 598 Week 1 Individual Assignment Project Charter For more classes visit PM 598.
PM 598 RANK Education for Service-- pm598rank.com.
Customer NDA Deck September 2014
Day 1: Getting Organized Fall 2012
Remind students to connect to the WiFi
Team Introduction Project Team Members Faculty Guide Customers
Automated Medication Dispenser
Day 1: Getting Organized Fall 2013
P15311: PCB Router Phase 4 System Demo with Customer
Day 1: Getting Organized Spring 2013
Mechanical Bioreactor
Team P09007 Derek Horton Matthew Sennett Lucas Sienk Matt Sones
SD5906 Globalization in New Media Design and Technology
University Image Logo Midway Review & Update TEAM or INSTITUTION NAME
Presentation transcript:

Status Update for P09321 Automatic Medicine Dispenser

Meeting With Customer (1-3pm) Prototype Demo Finalized Basic Structure and Architecture Reviewed Customer Requirements Began Brainstorming Sessions Action Item: Deliver schematic of circuit board to Justin by Tues

Week 2 Deliverables Finalize Needs Assessment – Becky Specficiations incl. Ethics – Team Project Plan (final) – Mike 2 Quarter-schedule – Team Benchmarking Results – Becky

Concerns Biometrics Hardware (laptop) Scalability of design Security Web-based application

RIT Action Items