PALM-3000 PALM-3000 Management Update Antonin Bouchez, Jenny Roberts Team Meeting #7 27 February, 2008.

Slides:



Advertisements
Similar presentations
Online Application Tutorial We’re Hiring.. Register for a new account and take the first step towards and exciting career in the Public Service! Your.
Advertisements

Meet Grace! Grace is our newest team member! She is here to make it easier to keep track of all your HR related documents digitally. Grace will always.
The Project Office Perspective Antonin Bouchez 1GMT AO Workshop, Canberra Nov
PALM-3000 Status of the PALM-3000 high-order adaptive optics system A.H. Bouchez, R.G. Dekany, J.R. Angione, C. Baranec, K. Bui, R.S. Burruss, J.R. Crepp,
PALM-3000 P3K Team Meeting #9 Stephen Guiwits Team Meeting #9 and 023 Robinson October 22, 2008.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max, Sean Adkins for NGAO Team SSC Meeting February 20, 2008.
PALM-3000 Management Update A. Bouchez, J. Roberts Team Meeting #15 10/29/09.
PALM-3000 PALM-3000 Instrument Requirements Antonin Bouchez PALM-3000 Requirements Review November 12, 2007.
PALM PALM-3000 project status 31 Jan COO All-Hands Mtg. Recent Milestones Requirements review on 12 Nov AO system offline for maintenance.
1 NGAO Instrumentation Studies Overview By Sean Adkins November 14, 2006.
Team : READ THIS SLIDE CAREFULY Project Plan presentations will be given by each team at our all-hands meeting on the dates listed at All- Hands Meeting.
PALM-3000 P3K Team Meeting #16 Stephen Guiwits Dean Palmer, Ernest Croner, Antonin Bouchez Team Meeting # Cahill March 05, 2010.
PALM-3000 Management Update A. Bouchez Team Meeting #9 10/22/2008.
NGAO Control Systems Group Status, Plans & Issues NGAO Team Meeting August 19, 2008 Erik Johansson Jimmy Johnson, Doug Morrison, Ed Wetherell.
PALM-3000 P3K Integration and Test Review Stephen Guiwits P3K System Computers and Electronics 273 Cahill September 22, 2010.
PALM-3000 Integration and Testing Status A. Bouchez Team Meeting #15 10/29/2009.
PALM-3000 PALM-3000 Status and the 3388-actuator Xinetics Deformable Mirror A.H. Bouchez, R.G. Dekany, J.R. Angione, C. Baranec, K. Bui, R.S. Burruss,
PALM-3000 PALM-3000 Instrument Architecture Antonin Bouchez PALM-3000 Requirements Review November 12, 2007.
PALM-3000 PALM-3000 Status A.H. Bouchez, J.E. Roberts Project 1640 Las Vegas Summit 1/28/2010.
LGS Project Meeting February 1, 2006 Agenda 1.IPT status updates: Laser facility, AO optomechanics, AO software (Bouchez, Roberts, Trinh; 30 min) 2.Sum-Frequency.
California Association for Research in Astronomy W. M. Keck Observatory KPAO Keck Precision Adaptive Optics Keck Precision AO (KPAO) SSC Presentation January.
NGAO Meeting #3 Introduction NGAO Meeting #3 Peter Wizinowich December 13, 2006.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
NGAO Management Update Peter Wizinowich NGAO Meeting #11 November 5, 2007.
Palomar Laser Guide Star Adaptive Optics Antonin Bouchez & Mitchell Troy John Angione, Rick Burruss, John Cromer, Richard Dekany, Steve Guiwits, John Henning,
PALM-3000 Optical Bench Update Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss Team Meeting #15 10/29/2009.
PALM-3000 P3K Team Meeting #15 Stephen Guiwits Dean Palmer Ernest Croner Team Meeting # Cahill October 29, 2009.
PALM-3000 PALM-3000 Software Requirements Review Thang Trinh PALM-3000 Requirements Review, Caltech Campus November 12, 2007.
PALM-3000 Instruments update A. Bouchez Team Meeting #9 22 Oct
NGAO System Design Phase Management Report - Replan NGAO Meeting #6 Peter Wizinowich April 25, 2007.
PALM-3000 High-order Wavefront Sensor Update Christoph Baranec Team Meeting #9 10/22/2008.
NGAO Status R. Dekany January 31, Next Generation AO at Keck Nearing completion of 18 months System Design phase –Science requirements and initial.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
LGS Project Meeting November 9, Outline 1.Project infrastructure 2.PALM-3000 update 3.LGS subsystem updates –Optical bench –LGS facility –AO software.
NGAO System Design Phase System & Functional Requirements Documents NGAO Meeting #6 Peter Wizinowich April 25, 2007.
Project Plan The Development Plan The project plan is one of the first formal documents produced by the project team. It describes  How the project will.
PALM-3000 Instrument commissioning schedule Antonin Bouchez Team Meeting #7 27 February, 2008.
PALM-3000 PALM3000 Realignment Winter Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss, R. Dekany, M. Troy Layout.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
NGAO Team Meeting Management Peter Wizinowich March 19, 2009.
PALM-3000 Systems Engineering R. Dekany, A. Bouchez 9/22/10 Integration & Testing Review.
NGAO Meeting #5 Introduction NGAO Meeting #5 Peter Wizinowich March 7, 2007.
PALM-3000 Budget and Schedule Update A. Bouchez, J. Roberts Team Meeting #10 1/8/2009.
Home screen of your online tracker system Updates or notes for your attention are placed at the top in red. This will also inform you of the document turnaround.
2013 City of Palm Coast Annual Progress Report. Overview Reporting Approach Report Review Next Steps.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
SC Project Review of NCSX, April 8-10, 2008 Central Controls and Computing WBS51 & 52 P. Sichta WBS5 Work Package Manager.
Director’s Review 5/5/03 Spalding DRAFT RLS 1 Project Planning  Documentation to DOE June 1  DOE Review ~July 22 Documents Summary Project Overview,
Electronic Tools for TIA Standards Development David Thompson Member of the Technical Staff GCS/EWG Meeting Sapporo, Hokkaido, JAPAN August 2000 TC
Intern Placement Tracking (IPT) Tutorial for Field Instructors Baccalaureate Social Work Program Office of Field Education Assistant Dean of Field Instruction:
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
The National Grants Partnership March 11, 2008 Michael Pellegrino
11/23/2004Module # 11 The NCSX Project Web An Indoctrination and Overview.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Keck Next Generation AO Next Generation Adaptive Optics Meeting #2 Caltech November 14, 2006 P. Wizinowich for NGAO Executive Committee.
News and Misc Didier Contardo, Jeff Spalding UPO 3/2/12 1 UPO 2/2/12 o The MM, cost estimates and reporting o Milestones and scheduling o Chamonix Meeting.
Office of Administration Enterprise Server Farm November 2004 Briefing.
Project Execution Methodology
STOCK TRADING SIMULATION SYSTEM
To the ETS – Accounts Setup and Preferences Online Training Course
Systems and Networking Department
Project Name Company Name Presenter Name
JTAMS PRE-MILESTONE B ANALYSIS
NGAO System Design Project Plans and Schedule
Preparations for a Lehman Review
Mark McKinnon EVLA Project Manager
HART Technologies Process Overview
LGS Project Meeting December 21, 2006 Agenda SWIFT update - A. Bouchez
To the ETS – Accounts Setup and Preferences Online Training Course
Fermi Lab – 2019 CMB-S4 Workshop
Presentation transcript:

PALM-3000 PALM-3000 Management Update Antonin Bouchez, Jenny Roberts Team Meeting #7 27 February, 2008

PALM What are we building again? Phase 0 Reconfigure current AO system for 2 new back-end instruments: SWIFT and project Phase 1 Develop and deploy an “extreme” NGS-AO system, with 1-2 years lead over competitive projects (GPI, Sphere). Phase 2 Improved the LGS performance with an infrared tip/tilt sensor and visible truth wavefront sensor.

PALM Recent Progress Recent Milestones Requirements review on 12 Nov AO system offline for maintenance starting 29 Nov RTC procurement complete 14 Feb Current Activities Relayout of AO optical bench for P1640 and SWIFT (Roberts, Burruss, Bui) –On track for commissioning with PHARO on April 9. High-order Wavefront Sensor design (Baranec) –Design in progress. Lab prototyping underway. Real-time wavefront reconstructor computer design (Truong, Guiwits) –Procurement complete. Hardware integration underway. Software architecture definition (Truong, Angione, Burruss, Cromer, Guiwits) –In progress. Electronics design (Guiwits, Croner, Cromer) –In progress. Instrument commissioning (Bouchez, Roberts, Burruss) –Planning. Interfacing with instrument teams.

PALM-3000 Budget overview (P3K Phase 1 only)

PALM-3000 Budget overview (P3K Phase 1+2)

PALM-3000 FY08 budget (Caltech) Caltech portion of budget: –MRI + COO support this FY: $793,000 (including contingency) –As of end Jan., $64,000 (35%) below budget profile.

PALM-3000 FY08 budget (JPL) JPL portion of budget: –JPL support this FY: $675,000 (including AO operations support) –As of end Jan., $5000 (3%) above budget profile

PALM-3000 Project Schedule (1)

PALM-3000 Project Schedule (2)

PALM-3000 Twiki site Structure –IPT section: Minutes and other meeting materials. –Project calendar: Link to Google calendar. IPT Leads should update meeting information. –Documentation section: Requirements, schedules, etc. Technical Products: Design documents. Security –All pages currently visible to the public (could be changed). –Protect sensitive documents using PDF passwords. lists –Use Technical Team list for general distribution. –IPT leads should post similar lists on IPT pages.

PALM-3000 Accounts and procurements Accounts divided by WBS category 1.Management, Systems Engineering. 2.Software, Electronics. 3.Optical Bench, DMs, Wavefront Sensors. 4.Commissioning. Caltech accounts –OIR.P3K-[task]-NSF.MRI –COO.P3K-[task]-… –Please charge COO account once it is available. Procurements –Contact Marcia Brown for procurements, cc. PM. –Distribute original packing slip to Marcia, copy to PM. –IPT leads should keep track of procurement expenses.

PALM-3000 Integration underway RTC computers & GPUs Reconfigured optical bench