Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

MICE Coupling Coil Testing at Fermilab MICE Collaboration Meeting Ruben Carcagno March 15, R. Carcagno - MICE CC Testing at Fermilab3/15/2012.
The Use of Small Coolers for Hydrogen and Helium Liquefaction
Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
MICE Superconducting Solenoids: Status and Update RAL: T W Bradshaw M Courthold J Rochford M Hills D Baynham Oxford: J Cobb W Lau S Yang MICE.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
MUTAC Review, 9 April MuCOOL and MICE Coupling Magnet Status Michael A. Green Lawrence Berkeley Laboratory Berkeley CA
Magnet quench during a training run Magnet electrical circuit schematic PROGRESS ON THE MODELING AND MODIFICATION OF THE MICE SUPERCONDUCTING SPECTROMETER.
Spectrometer Solenoids MICO 146 Steve Virostek LBNL June 6, 2011.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 114 September 18, 2008.
Progress on the MICE Cooling Channel Solenoid Magnet System
-1- Wang, Li The 23rd MICE Collaboration Meeting to 17 HIT/CHINA WANG, Li Institute of Cryogenics and Superconductivity Technology.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
Spectrometer Solenoid Report and Coupling Coil Update Michael S. Zisman MICE Operations Manager Center for Beam Physics Lawrence Berkeley National Laboratory.
1 Spectrometer Solenoid Design and Cost Update Michael A. Green Lawrence Berkeley Laboratory 10 February 2005.
MICE RF Module Safety Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting February 12, 2005.
Tracker Solenoid Module Design Update Steve VirostekStephanie Yang Mike GreenWing Lau Lawrence Berkeley National LabOxford Physics MICE Collaboration Meeting.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
1 The Genoa Tracker Solenoids and their Contribution toward a New Design Michael A. Green Lawrence Berkeley National Laboratory and Pasquale Fabbricatore.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update S. Virostek and M. Green are visiting vendor today for progress update Vendor expects to complete.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #145 December 15, 2011.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update Vendor still expecting to complete first magnet by the end of November, before X-mas more.
MICE Spectrometer Solenoid Design and Fabrication Update Mike Green and Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference December.
12 March 2006NFMCC Meeting, IIT, Chicago1 Progress on the MICE Cooling Channel and Tracker Magnets Michael A. Green Lawrence Berkeley Laboratory.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #26 University of California.
MICE Magnets - Virostek 11 MICE Magnets Steve Virostek Engineering Division Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
RF Cavity / Coupling Coil Module
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
Spectrometer Solenoid Test Plan Workshop: Spectrometer Solenoid Overview Steve Virostek - LBNL February 17, 2012.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Preliminary Design for the Coupling Coil Cryostat in MICE
Abstract: The Muon Ionization Cooling Experiment (MICE) is an international effort sited at Rutherford Appleton Laboratory, which will demonstrate ionization.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
MICE Cooling Channel Magnets: Spectrometer Solenoid Procurement RF Module Coupling Coil Proposal Steve Virostek Lawrence Berkeley National Lab NFMCC 07.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #28 Sofia, Bulgaria.
Spectrometer Solenoid ā€“ Quench Analysis The LBNL version of the quench model has been further refined - Heng Pan is finishing various quench scenarios.
Spectrometer Solenoid Test Plan Workshop: Safety Considerations Steve Virostek - LBNL February 17, 2012.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
MICE/MuCool Coupling Magnets to 22 ICST/HIT MICE/Muool Coupling Magnets Progress Li Wang for MICE Group Institute of Cryogenics.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
MICE RF Coupling Coil Magnets Update Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory October 6, 2010 Sofia, Bulgaria.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
MICE Spectrometer Solenoid Review A summary of P.Fabbricatore on behalf the review board Amalia Ballarino, Elwyn Baynham, Tom Bradshaw, Mike Courthold,
Spectrometer Solenoid Design and Test Results Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Spectrometer Solenoid Background Info Steve Virostek Lawrence Berkeley National Lab MICE Spectrometer Solenoid Review: Phone Meeting October 5, 2009.
Spectrometer Solenoid Prep Work at RAL and LBNL Steve Virostek Lawrence Berkeley National Lab Steve Virostek Lawrence Berkeley National Lab MICE VC May.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
-1- Steve Virostek (LBNL) and Li Wang (SINAP) Instrumentation for the MICE Coupling Coil Steve Virostek Lawrence Berkeley National Lab February.
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
Cooling Circuit Design Steve Virostek Lawrence Berkeley National Lab February 29, 2012 MICE Coupling Coil Cryostat Design Review Lawrence Berkeley National.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Spectrometer Solenoid Update
Spectrometer Solenoid Fabrication Status and Schedule
Presentation transcript:

Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October 10, 2006

Spectrometer Solenoid Design & ProcurementPage 2 S. Virostek, M. Green, M. Zisman - Lawrence Berkeley Lab Design review held by Wang NMR on Sept 6, Attendees: S. Virostek, M. Zisman, M. Green, D. Li - Complete design package book provided by Wang - Issues and actions items identified during review - Follow up document from Wang addresses issues Detailed magnet design is now complete Superconducting wire sent from LBNL to Wang Coil formers and high T C leads ordered by Wang First magnet scheduled to be shipped end Aug 07 Spectrometer Solenoid Update

Spectrometer Solenoid Design & ProcurementPage 3 S. Virostek, M. Green, M. Zisman - Lawrence Berkeley Lab He Filler Neck Lead Neck Cold Mass Support PMT Iron Shield Space for Radiation Shield Support Stand Cooler Neck

Spectrometer Solenoid Design & ProcurementPage 4 S. Virostek, M. Green, M. Zisman - Lawrence Berkeley Lab Lead Neck Gas Pipe 4.2 K Coolers Condenser Tank Liquid Pipe Cold Mass 4K End 60K Intercept 300K End

Spectrometer Solenoid Design & ProcurementPage 5 S. Virostek, M. Green, M. Zisman - Lawrence Berkeley Lab Magnet Coil Parameters Uniform Field Magnets * The uniform field magnet coils in series have a self inductance of 77 H Separately Powered Coil package length = 2530 mm -

Spectrometer Solenoid Design & ProcurementPage 6 S. Virostek, M. Green, M. Zisman - Lawrence Berkeley Lab Magnet Coil Load Lines

Spectrometer Solenoid Design & ProcurementPage 7 S. Virostek, M. Green, M. Zisman - Lawrence Berkeley Lab Indirect cooling using liquid helium condensers Baseline design will use two cryocoolers but will allow mounting of a third cooler, if necessary Cryocoolers and high T C leads will be accessible by means of removable cover plates 60K (or less) thermal shield is conductively cooled using the first stage of the cryocoolers Thermal shield nitrogen reservoir will protect the high T C leads and provide extra cooling margin Design Overview (coil cooling)

Spectrometer Solenoid Design & ProcurementPage 8 S. Virostek, M. Green, M. Zisman - Lawrence Berkeley Lab Single piece 6061-T6 aluminum coil former Each layer wet wound using Stycast 2850 FT 2.5 mil thick fiberglass between winding layers Aluminum coil banding will provide hoop force support and ensure coils are tight after cooldown Conductor joints are to be lapped by at least 24ā€ to minimize the I 2 R losses Passive quench protection will be provided by a system of diodes & resistors Design Overview (coil construction)

Spectrometer Solenoid Design & ProcurementPage 9 S. Virostek, M. Green, M. Zisman - Lawrence Berkeley Lab Helium vessel (Al) and vacuum vessel (304SS) to be designed & tested according to PV code He vessel will contain two relief paths for safety Unidirectional S-2 fiberglass cold mass supports using race-track shaped links (safety factor of 4) 304 SS support design derived from LBNL/Oxford Cold mass support design allows cold shipping TBD: lifting accommodations and base mounting Design Overview (PVā€™s & supports)

Spectrometer Solenoid Design & ProcurementPage 10 S. Virostek, M. Green, M. Zisman - Lawrence Berkeley Lab Two cryocoolers are needed at Wang NMR by the end of Feb 2007 for installation into first magnet Two additional coolers needed one month later 13 week lead time after placement of order Two coolers per magnet anticipated for operation Magnets designed to mount up to three coolers Two more coolers to be procured at a later date Short procurement spec to be done by M. Green Cryocooler Procurement

Spectrometer Solenoid Design & ProcurementPage 11 S. Virostek, M. Green, M. Zisman - Lawrence Berkeley Lab First draft of power supply procurement spec is being reviewed by collaboration members Three 300 A and two 50 A supplies are needed for magnet operation and for FNAL One spare of each supply allows parallel testing of first & second magnets Lead time to procure power supplies is 3 months First supply needed May 07 for testing at Wang Power Supply Procurement

Spectrometer Solenoid Design & ProcurementPage 12 S. Virostek, M. Green, M. Zisman - Lawrence Berkeley Lab On-axis field profile and peak field on conductor Axial forces and axial magnetic pressure calcs Evaluation of fringe fields on leads & cryocoolers 3-D magnet quench analyses (w/o Al bore tube) Heat leak calculations (thermal shield, He vessel) Calculation of cooldown cryogen requirements FEA stress analysis of coils and coil former ASME code calculations for He & vacuum vessels Summary of Wang Analyses

Spectrometer Solenoid Design & ProcurementPage 13 S. Virostek, M. Green, M. Zisman - Lawrence Berkeley Lab Magnet Construction Quality Assurance Plan Fabrication/installation/inspection plans: - coil former, ground insulation, coil winding, coil banding - quench protection, conductor feed thrus, coil assembly - He vessel, cold mass support, He recondenser, Hi-T C leads - thermal shield, vacuum vessel, support structure Winding instructions for each coil Project work breakdown structure and schedule Detailed component and assembly drawings Other Project Documents

Spectrometer Solenoid Design & ProcurementPage 14 S. Virostek, M. Green, M. Zisman - Lawrence Berkeley Lab Schedule Summary

Spectrometer Solenoid Design & ProcurementPage 15 S. Virostek, M. Green, M. Zisman - Lawrence Berkeley Lab Detailed magnet design is now complete Coil formers and high T C leads ordered Superconducting wire delivered to Wang Cryocooler order to be placed soon (~1 mo) Power supply spec is nearly complete First magnet to be shipped by end Aug 07 Second magnet to follow 1 month later Summary