Project Quality Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project Management.

Slides:



Advertisements
Similar presentations
Quality Planning Tools PMI Westchester Quality SIG Pawan Kumar, Quality SIG Member, PMP November 2007.
Advertisements

Project Quality Management
Chapter 8: Project Quality Management
Project Change Management
Project quality management Cody Ronning 3/23/2015.
Project Integration Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project.
Project Scope Management
Chapter 8: Quality Management Project Quality Management
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
Project quality management (PMI body of knowledge)
SOFTWARE PROJECT MANAGEMENT Project Quality Management Dr. Ahmet TÜMAY, PMP.
Project quality management (PMI body of knowledge)
Project Quality Management
Managing Project Quality
Project Management Methodology
1 L U N D S U N I V E R S I T E T Projektledning och Projektmetodik, VBEF01 Kristian Widén Tekn. Doktor Avd. För Byggproduktion Inst. För Byggvetenskaper.
QUALITY These slides have been added to the standard MRU PM Cert materials and are made available to students who have attended my class. Robin Hornby.
Degree and Graduation Seminar Project Management Processes
© 2005 Wiley1 Total Quality Management Chapter 5.
Project Quality Management
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
Quality Management Processes Plan Quality Management Perform Quality Assurance Control Quality.
Quality Control Project Management Unit Credit Value : 4 Essential
The Project Management Body of Knowledge (PMBOK)
Agenda  Purpose  Definition  Processes  Performance Reports  Quality Control  Risk Monitoring & Control  Change Requests 5.3.
Week 8 - Quality Management Learning Objectives You should be able to: §List and explain common principles of quality management (QM) §List, distinguish.
BSBPMG505A Manage Project Quality Manage Project Quality Project Quality Processes Diploma of Project Management Qualification Code BSB51507 Unit.
Quality Assurance vs Quality Control
Software Project Management Lecture # 12. Outline Chapter 26 – Quality Management  What is Quality?  Meaning of Quality in Various Context  Software.
Denise Robertson Information quoted or derived from PMI, Mulcahy, and Looking Glass Development's PMP exam prep materialsPage 1 PMI PMP Exam Prep PMI Mile.
Apply Quality Management Techniques Project Quality Processes Certificate IV in Project Management Qualification Code BSB41507 Unit Code BSBPMG404A.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
Project Quality Management.  Define project quality management.  Describe quality planning and its relationship to project scope management.  Discuss.
Lecture 12 Managing Project Control and Closure. Project Control The process that allows monitoring and measurement of project progress and directing.
2 How to use the seven tools of quality Tools for identifying problems / collecting data Check sheets Scatter diagrams Statistical process control (SPC)
Project Quality Management
Project Management Basics
© Wiley Total Quality Management by Adnan khan.
PMP Key Area Breakdown PMP Panel Discussion 9/9/2015.
Project Management Processes for a Project
Advanced Project Management Project Quality Management Ghazala Amin.
PMP Study Guide Chapter 11: Controlling Work Results.
0 SoMD PMI Training Bruce Schwickrath PMP 3/19/2008 Quality and the QMP and QCP Quality Management Plan (QMP) Quality Control Plan (QCP) SoMD PMI Training.
B U D I L U H U R U N I V E R S I T Y POST GRADUATE PROGRAM MAGISTER ILMU KOMPUTER IT PROJECT MANAGEMENT.
0 SoMD PMI Training Bruce Schwickrath PMP 4/30/2008 Quality and the QMP and QCP Quality Management Plan (QMP) Quality Control Plan (QCP) SoMD PMI Training.
PMP Prep Course – Project Quality Management - PMBOK 4 th Edition – Version 2.0 Project Quality Management PMP Study Group Quality Management.
Project Quality Management ©2010 Long Island Chapter of the Project Management Institute ALL RIGHTS RESERVED PMP Prep Course – PMBOK 4th Edition – Version.
8.1 Plan Quality Management
Quality Management.
Project Quality Management
Project quality.
Software Quality Engineering
8.3 Control Quality The process of monitoring and recording results of executing quality activities to assess performance and recommend necessary change.
Software Quality Engineering
Chapter 8: Project Quality Management
Process Improvement: Quality Assurance, Control, and Management
PROJECT QUALITY MANAGEMENT Teknik Elektro FT UNDIP
Project Scope Management
Project quality management (PMI body of knowledge)
What is Project Quality Management?
Overview Slides for CU Speaking Engagement
Who Wants To Be A PMP? Montoring & Controlling.
CIS12-3 IT Project Management
Project Quality Management
Project Quality Issues
Project Scope Management
Project Integration Management
Project Scope Management
Project Integration Management
Managing Project Work, Scope, Schedules, and Cost
Presentation transcript:

Project Quality Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project Management Institute Inc., © 2009

Project Quality Management “Creating and following policies and procedures to ensure that a project meets the defined needs it was intended to meet from the customer’s perspective.” PMP Exam Prep, 6 th Edition

Why Quality Management? Quality means conformance to specifications and fitness for use – i.e. just what you need and not more Projects or products with unnecessary features can be too expensive to meet the business need Prevention is much cheaper than inspection, build quality in early to minimize costs/maximize quality

How Do We Manage Quality? Three processes Plan Quality Plan Quality What is quality and how will we ensure it? What is quality and how will we ensure it? Perform Quality Assurance Perform Quality Assurance Are we following the quality standards? Perform Quality Control Perform Quality Control Are we meeting the quality standards? Perform Quality Assurance Perform Quality Control Plan Quality

Scope Baseline Cost Performance Baseline Schedule Baseline  Cost-benefit analysis  Cost of quality  Control charts  Benchmarking  Design of experiments  Statistical sampling  Flowcharting  Proprietary quality management methodologies  Additional quality planning tools Inputs Outputs Tools & Techniques Risk Register Enterprise Environmental Factors Organizational Process Assets Quality Management Plan Quality Metrics Process Improvement Plan Quality Checklists Project document updates Perform Quality Assurance Perform Quality Control Plan Quality Stakeholder Register

Plan Quality Cost of Quality – Evaluating the cost of conformance with the cost of nonconformance to reach a balance. Includes; Prevention Costs Prevention Costs Appraisal Costs Appraisal Costs Failure Costs Failure Costs Cost of Conformance Cost of Non Conformance Quality training Rework StudiesScrap Surveys Inventory Costs Warranty Costs Deming’s Costs of Quality 85% of the costs of quality are the direct responsibility of management - Deming

Quality Planning Terms Gold Plating – Giving the customer extras that do not add value to the project Marginal Analysis – The point where the incremental revenue from an improvement equals the cost to implement it Kaizen – Continuous improvement process to reduce costs and promote consistency ISO 9000 – International standard to ensure that companies have quality procedures and that they follow them

Perform Quality Assurance Project Management Plan  Plan quality and perform quality control tools and techniques  Quality audits  Process analysis Inputs Outputs Tools & Techniques Change Requests Organizational Process Assets Updates Project Document Updates Project Management Plan Updates Quality Metrics Work Performance Information Quality Control Measurements Perform Quality Assurance Perform Quality Control Plan Quality

Statistics Terms Review Mutually Exclusive – Two events that cannot both occur in a single trial Statistical Independence – Probability of one event occurring does not affect the probability of another event occurring Probability – The likelihood that something will occur (usually expressed in percent) Remember: +/- 1  = 68.26% +/- 2  = 95.46% +/- 3  = 99.73% +/- 6  = 99.99% Normal Distribution

Perform Quality Control Project Management Plan  Cause and effect diagram  Control charts  Flowcharting  Histogram  Pareto Chart  Run chart  Scatter diagram  Statistical sampling  Inspection  Approved change requests review Inputs Outputs Tools & Techniques Quality Control Measurements Validated Deliverables Validated Changes Quality Metrics Quality Checklists Organizational Process Assets Work Performance Measurements Approved Change Requests Deliverables Change Requests Project Management Plan Updates Organizational Process Assets Updates Project Document Updates Perform Quality Assurance Perform Quality Control Plan Quality

Pareto Chart Graph of problem type vs. frequency 80/20 Rule – 80% of your problems will come from 20% of your work! Problem Type Frequency Cumulative Percentage

Control Chart Upper & Lower Control Limits (UCL & LCL) Set by quality goal i.e. 3  Set by quality goal i.e. 3  Includes the normal and expected variation in the process Includes the normal and expected variation in the process Specification Limits Contracted acceptable limit, usually outside UCL & LCL Contracted acceptable limit, usually outside UCL & LCL Out of Control Data point falls outside of UCL/LCL Data point falls outside of UCL/LCL Non-random data points i.e. “Rule of Seven” Non-random data points i.e. “Rule of Seven” Rule of Seven If you get seven points in a row on one side of the mean, seven points ascending, or seven points descending, the process is no longer random and it is out of control If you get seven points in a row on one side of the mean, seven points ascending, or seven points descending, the process is no longer random and it is out of control Originally adopted from a Ford quality manual Originally adopted from a Ford quality manual Assignable Change When the controller adjusts the process to bring the process back within process control limits When the controller adjusts the process to bring the process back within process control limits

Control Charts Specification Limit (or Mean)