US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1 Slides for the US Si Tracker Institutional Group Leaders Meeting J. Incandela March.

Slides:



Advertisements
Similar presentations
Clean Room Plans Monday, August 23, Hybrids--- Frames--- SensorsModules.
Advertisements

US CMS Silicon Tracker Project – Breakout session Overview - DOE/NSF Review Brookhaven - May 20, Incandela 1 CMS Si Tracker: Breakout Session Dept.
MEG Review at Brookhaven, Feb 5, 2004 : CMS Si Tracker Project: J. Incandela 1 US CMS Silicon Tracker US LHC Detector Maintenance and Operations Evaluation.
TEC Production in the US N. Bacchetta, J. Incandela,…and October 14, 2003.
Tracker Week – UCSB Gantry Status – April 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara Dean White.
US Tracker Production Meeting, March 8, 2005 J. Incandela 1 Slides for the US Si Tracker Weekly Production Meeting J. Incandela March 8, 2005.
MEG Review at BNL, Jan. 18, 2006 : CMS Si Tracker Project: J. Incandela 1 US CMS Silicon Tracker US LHC Detector Maintenance and Operations Evaluation.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
TOB Status Joe Incandela University of California, Santa Barbara For the TOB Group Tracker General Meeting Sep. 21, 2001 at CERN Slides courtesy of: A.
TEC Production in the US J. Incandela Level 2 Manager US CMS Silicon Tracker Project October 8, 2003.
CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 1 Status of the UCSB Gantry Dean White University of California Santa Barbara October.
US Production Report - September 4, Incandela 1 US Production Report CMS Tracker Steering Committee 4 September 2003 J. Incandela University of.
DOE REVIEW 1/20/04 – Dean White 1 Gantry Module Assembly TOB & TEC Dean White University of California, Santa Barbara.
Recent TOB Developments First LT failure and Stereo Module Status J. Incandela With slides provided by E. Chabalina, A. Affolder, Dean White.
US CMS Silicon Tracker : Schedule J. Incandela University of California Santa Barbara US CMS Silicon Tracker Project Manager Fermilab PMG April 9, 2004.
US CMS Silicon Tracker : Overview J. Incandela University of California Santa Barbara US CMS Silicon Tracker Project Manager Fermilab PMG April 9, 2004.
24 May 2005C. Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last week Reporting for: Dan Callahan Susanne Kyre Stephen Jaditz.
DOE/NSF Review, BNL, May 20, Incandela1 CMS Tracker: Cost, Schedule, Planning and M&O Joe Incandela, University of California Santa Barbara US CMS.
Tracker Week – UCSB Gantry Status – Febuary 10, 2004 – Dean White 1 Gantry Status University of California Santa Barbara UCSB Gantry Team: Andrea Allen.
US CMS Si Tracker Project presentation to the Program Management Group at Fermilab; 22 October 2004, J. Incandela (UCSB) 1 US CMS Silicon Tracker Project.
Status of the Tracker Outer Barrel Joe Incandela University of California Santa Barbara for the US and CERN Tracker Groups Comprehensive Review June 28,
1 UCSB Module Assembly Week of 5/23-5/27. 2 FNAL & UCSB Inventory HybridsSensorsFrames FNALUCSBFNALUCSBFNALUCSB STHPKITSTHPKITSTHPKITSTHPKIT L12pu /
Status of the Tracker Outer Barrel J. Incandela University of California Santa Barbara for the illustrious TOB Group Tracker General Meeting October 26,
US CMS Silicon Tracker – PAC Meeting – FNAL - Nov 3, Incandela 1 US CMS Tracker Outer Barrel (TOB) Silicon Project Joe Incandela Fermilab Level.
MEG Review at FNAL, Jan. 28, 2005 : CMS Si Tracker Project: J. Incandela 1 US CMS Silicon Tracker US LHC Detector Maintenance and Operations Evaluation.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
Finding ST Sensors that cause CMN: A Follow up to TSC Meeting N. 215 Prof. J. Incandela UC Santa Barbara US CMS Tracker Project Leader Tracker Steering.
Status of the Tracker Outer Barrel Joe Incandela University of California Santa Barbara for the US and CERN Tracker Groups Annual Review June 15, 2004.
US Module Production Status Joe Incandela University of California Santa Barbara for the US CMS Silicon Tracker Group CERN Tracker Week July 2004.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
Slide 1UCSB Rod Production presented by Jim LambDOE review, January 20, 2004 UCSB Rod Production UCSB Rod Production, Jan , presented by Jim Lamb.
3 May 2005Claudio Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last two weeks Reporting for: Dan Callahan Susanne Kyre Stephen.
CMS at UCSB Prof. J. Incandela US CMS Tracker Project Leader DOE Visit January 20, 2004.
US CMS Silicon Tracker Project Joe Incandela University of California Santa Barbara Status and schedule CMS Weekly Meeting Fermilab May 14, 2004.
Schedule & Plans Prof. J. Incandela US CMS Tracker Project Leader DOE Visit January 20, 2004.
Status of the Tracker Outer Barrel Joe Incandela University of California Santa Barbara for the illustrious and colorful TOB Group Tracker General Meeting.
US Module Production Prof. J. Incandela US CMS Tracker Project Leader For the US CMS Tracker Group Tracker Meetings - CERN Feb. 13, 2004.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave Staszak.
US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder1 US CMS Silicon Electronics Testing US CMS Lehman Review BNL 5/21/03 A.
UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 1 UCSB in CMS.
US CMS Silicon Tracker Project Joe Incandela University of California Santa Barbara US CMS Silicon Tracker Project Manager DOE/NSF Review of CMS Detector.
28 June 2005C. Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last week Reporting for: Dan Callahan Susanne Kyre Stephen Jaditz.
Slide 1Susanne KyreDOE review, January 20, 2004 Wirebonding for TOB and TEC Susanne Kyre University of California, Santa Barbara.
Status of TOB Modules & Rods J. Incandela For the US CMS Tracking Group Tracker Week, Feb
Slide 1 Electrical Testing at UCSB -Anthony AffolderDOE review, January 18, 2005 Electrical Testing at UCSB: Hybrids & Modules Anthony Affolder On behalf.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
US Tracker Project – CERN - July 17, Incandela 1 US Production Readiness CMS Tracker Week 17/06/03 CERN J. Incandela University of California Santa.
US CMS Silicon Tracker Project Regina Demina KSU Florida State University May 11, 2002.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002.
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
PHENIX Vertex Detector with Conventional Strip Sensors Abhay Deshpande Stony Brook University.
17 May 2005Jim Lamb (UCSB)1 Status of Rod Production at UCSB This report covers the last week Reporting for: Dan Callahan Susanne Kyre Stephen Jaditz Puneeth.
Joe Incandela University of California Santa Barbara DOE Site Visit Jan 17, 2008 Joe Incandela University of California Santa Barbara DOE Site Visit Jan.
On behalf of the US TOB testing group
On behalf of the US TOB testing group
US Testing Mailing List
US Testing Update Anthony Affolder (On behalf of the US testing group)
UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005.
Electrical Testing at UCSB: Hybrids & Modules
Electrical Testing at UCSB: Hybrids, Modules, & Rods
TOB Module Production Overview and Plan
Current Necessary for CMN Problem
Recent TOB Developments
Recent TOB Developments
Equipment Status ARCS equipment status DAQ equipment status
FNAL Hybrid Testing Status
Presentation transcript:

US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1 Slides for the US Si Tracker Institutional Group Leaders Meeting J. Incandela March 1, 2005

US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 2 US CMS Tracker Group Brown University R. Hooper, G. Landsberg, C. Nguyen, H. Nguyen University of California, Riverside (UCR) P. Gartung, G. Hanson, G.Y. Jeng, G. Pasztor University of California, Santa Barbara (UCSB) A. Affolder, S. Burke, C. Campagnari, F. Garberson, D. Hale, J. Incandela, P. Kalavase, S. Kyre, J. Lamb, R. Taylor, D. Stuart, D. White + technicians University of Illinois, Chicago (UIC) E. Chabalina, C. Gerber, L. Nigra, T. Ten Fermilab (FNAL) M. Demarteau, A. Ronzhin, K. Sogut, L. Spiegel, S. Tkaczyk + technicians University of Kansas (KU) P. Baringer, A. Bean, L. Christofek, D. Coppage Mexican Consortium: Cinvestav: H. Castilla, R. Perez, A. Sanchez Puebla: E. Medel, H. Salazar San Luis Potosi: A. Morelos University of Rochester (UR) R.Demina, R. Eusebi, E. Halkiadakis, A. Hocker, S. Korjenevski, P. Tipton 20 joined group this past year – few more needed at both sites 10 left the group (includes KSU) 20 joined group this past year – few more needed at both sites 10 left the group (includes KSU)

US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 3 US Group Activity US Group Leaders Meeting – monthly or as needed Discuss resources, planning, etc. US Production Meeting – Weekly Keep track of quality, schedule, problems All major tasks report. Experts understood to be meeting regularly. One expert representative for each task will make summary report in the Production meeting. Will start next week.

US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 4 SST Schedule Completion: Jan An aggressive schedule

US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 5 Schedule Outlook Parts Sensor: HPK – yields very high – quality excellent Fairly confident all Sensors will arrive by November – even if we increase order from to ~18000 Hybrids: Cicorel – quality good – yields rising Recent batches were very good Went from slightly behind the original schedule to slightly ahead The exceptionally good new batches included TOB Looks like all TOB hybrids could be in hand before Europe closes for August Module Production Open issues: Approval of Ag epoxy fix, Encapsulation Start now: 6-9 per day (30 per site this week) Following 4 weeks: ~50/w/site Following 4 weeks: ~75/w/site Steady state after that: ~100/w/site Cannot exceed ~ 60-70/w/site until multi-rod burn-in is going. Without rods, need overnight cycling in Wien box for thermal check. Gives us 5 to 8 weeks to get the rod production up to snuff.

US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 6 Planning We will focus heavily on TOB initially, with the possibility of completing all rods by early Autumn being considered. Then, UCSB will be full time TEC module production. Meanwhile, we build a team up at CERN for I&C

US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 7 UCSB Assembly Plate/Capacity  Total of 24 plates (#) = plates added in 2004 Module type Completed Plates Plates In Process Total Daily Capacity (# modules) TOB r-phi7 (2)721 TOB stereo3 (1)39 TEC R5P2 (2)139 TEC R5S2 (2)139 TEC R65 (4)515 TEC R72 (2)139

US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 8 TEC R7 TEC R6 TEC R5P TEC R5S TOB r-phiTOB stereo Module Types Built in US

US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 9 Tracker Management Structure Proposed Solution to Management Structure Must involve all Talented People in the Success of the Project Propose to Manage the Project with a Management Board Each Member with assigned Specific Responsibility Propose the Management Board meets ~ once each Month Management Board meets at different Tracker Institutions : Visit labs, Meets people doing the work, understands Problems/Common Solutions Receive Reports, Technical Status, Financial Status, Anticipate Future Problems Manage the Project to meet Schedule and Budget Develop the CMS Tracker Management Team Slide taken from Peter Sharp’s presentation

US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 10 Tracker Management Structure Slide taken from Peter Sharp’s presentation

US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 11 Tracker Management Structure Proposed Project Structure Slide taken from Peter Sharp’s presentation

US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 12 Tracker Management Structure Slide taken from Peter Sharp’s presentation

US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 13 Management Tracker Construction Board Currently 2D Columns: TIB/TOB/TEC/PIXELS Rows: Module Production, Integration: Tracker/Electronics/Software May add more technical rows Names not settled