Phased Deployment and Operation of the Mid-Atlantic Regional Coastal Ocean Observing System (MARCOOS) Project Duration: 3 years; currently starting year.

Slides:



Advertisements
Similar presentations
Presentation to IOOS FAC Josie Quintrell April 2014.
Advertisements

U.S. IOOS ® Briefing for RDML Glang Suzanne Skelley, CAPT Scott Kuester, & Jen Rhoades US IOOS Program Office 1.
National Oceanic and Atmospheric Administration FY 2015 Budget Submission March 18, 2014.
West Coast Regional Marine Planning
National Ocean Service Budget Update for the NOAA Hydrographic Services Review Panel Glenn Boledovich, Chief NOS Policy, Planning and Analysis Division.
Existing Mid-Atlantic Sub-regional Observing Systems LEO.
1 WRF Development Test Center A NOAA Perspective WRF ExOB Meeting U.S. Naval Observatory, Washington, D.C. 28 April 2006 Fred Toepfer NOAA Environmental.
Project Title Project Investigators Project Duration: (E.g., 3 years; currently in year 2, or x months if this is a better representation of project time)
SEA-COOS The Southeast Atlantic Coastal Ocean Observing System National IOOS Regional observing systems.
-101 MACOORA Annual Meeting October 22-23, 2008 Dartmouth, Massachusetts Presenters: Scott Glenn & Josh Kohut.
The SouthEast Coastal Ocean Observing SECOORA Meeting Regional Association (SECOORA) June 11-12, 2007 SECOORA Data Management and Communications SECOORA.
Success Stories – Making a Difference Optimizing HF Radar for SAR using USCG Surface Drifters Art Allen U.S. Coast Guard Josh Kohut, Scott Glenn Rutgers.
SEA-COOS The Southeast Atlantic Coastal Ocean Observing System National IOOS Regional observing systems.
Alaska Ocean Observing System (AOOS) A Regional Observing System within the Integrated Ocean Observing System Molly McCammon, Executive Director 1007 W.
InvestigatorAffiliationInvestigatorAffiliation A. AllenU.S. Coast GuardL. AtkinsonOld Dominion University A. F. BlumbergStevens Institute of Technology.
Welcome MACOORA Annual Meeting October 22-23, 2008 Fall River, Massachusetts Carolyn Thoroughgood.
The National MPA Center: Helping to Conserve our Nation’s Marine Resources Lauren Wenzel National Marine Protected Areas Center.
Progress Towards a Regional Coastal Ocean Observing System for the Southeast (SEACOOS) Harvey Seim / University of North Carolina at Chapel Hill University.
Development of a Dual-Use Over-The Horizon Radar Network for Monitoring Ocean Currents and Ship Traffic in the Exclusive Economic Zone Scott M. Glenn Coastal.
Integrated Ecosystem Assessment for the Gulf of Mexico Becky Allee Gulf Coast Services Center.
Our Planet is Changing U.S. Integrated Ocean Observing System (IOOS) We need advanced tools to understand and monitor our oceans, coasts and Great Lakes.
Moving Forward: NOAA & Earth Observation Systems Mr. Timothy R.E. Keeney Deputy Assistant Secretary of Commerce for Oceans and Atmosphere National Oceanographic.
Background Roundtable of Federal Hazard Mitigation Partners in the Pacific Islands (FHMPPI) (2002 – 2003) Pacific Risk Management `Ohana (PRiMO) (2004.
U.S. Integrated Ocean Observing System (IOOS) Enabling decision making every day; Fostering advances in science and technology.
1. 2 Why is the Core important? To set high expectations –for all students –for educators To attend to the learning needs of students To break through.
Coastal and Marine Spatial Planning Debra Hernandez, SECOORA Walter Johnson, BOEMRE Ru Morrison, NERACOOS Charly Alexander, IOOS Office.
Cape Cod Cape Hatteras NJ MA CT VA DE NY NC RI MD PA M ID - A TLANTIC R EGIONAL A SSOCIATION C OASTAL O CEAN O BSERVING S YSTEM 1000 km Cape to Cape RAISING.
UNCW Ocean Observing: Providing Infrastructure, Data, and Products to Support State and Federal Agency Needs AQUARIUS NOAA’s Undersea Research Center (NIUST,
The SouthEast Coastal Ocean Observing SECOORA Meeting Regional Association (SECOORA) June 11-12, 2007 Marketing Plan Jennifer Dorton & Tom Kuba Jennifer.
Graphic courtesy NOAA / PMEL / Center for Tsunami Research Pacific Northwest Waters Gateway to Our Future Communication through the NANOOS Visualization.
Gradually, the government's highest levels are becoming acquainted with the limits of observation in the Gulf, Jane Lubchenco, the administrator of the.
Predicting and Preparing for Natural Disasters Margaret A. Davidson Director NOAA Coastal Services Center June 7, 2005.
A Survey of Existing Mid-Atlantic Regional Association Coastal Ocean Observing System MARACOOS Assets Wendell Brown UMass Dartmouth School for Marine Science.
USER NEEDPRODUCTS / SERVICESAOOSAOOS CARACARA CeNCeN GCGC GLOSGLOS MARAMARA NANNAN NERANERA PACPAC SCCSCC SECSEC Safe and efficient coast and ocean transit--
A NOAA Cooperative Institute David R. Shaw, Director Northern Gulf Institute.
IOOS National HF Radar Update Jack Harlan IOOS National HF Radar Project Manager GCOOS Annual Meeting September 2012 Corpus Christi.
The Science Requirements for Coastal and Marine Spatial Planning Dr. Robert B. Gagosian President and CEO Ocean Studies Board November 10, 2009.
ESIP Federation Air Quality Cluster Partner Agencies.
Josie Quintrell, NFRA Executive Director October, 2010 MACOORA Board Meeting.
Creating a national plan for the regional contribution to National ICOOS.
ESIP Federation Air Quality Cluster Partner Agencies.
Congress on Building Capacity for Coastal Solutions Renewable Natural Resources Foundation Lessons from the Gulf of Maine Sponsored by: National Oceanic.
1 MACOORA ANNUAL MEETING November GROWING A NATIONAL NETWORK OF REGIONAL SYSTEMS.
1Office of the Federal Coordinator for Meteorology OFCM OFCM Special Session: Challenges of Urban Test Beds Charge to the Joint Action Group for Joint.
Northeastern Regional Association of Coastal Ocean Observing Systems MARACOOS.
Ocean.US and Coastal Ocean Applications and Science Team (COAST) Larry Atkinson September 2004 Corvallis.
Department of Commerce Workshop San Juan, Puerto Rico 17 November 2009 Laura Furgione Assistant Administrator for Program Planning and Integration National.
Insert Date 1 Hurricanes-Inundation Overview Objectives: Improve forecasts of tropical cyclones and related inundation hazards to enhance mitigation decisions.
The Physical Observing System: From Monitoring and Predicting Hazards to Long Term Changes Doug Wilson Co-Chairman, IOCARIBE-GOOS U.S. NOAA GEO CZCP Workshop.
-101 MACOORA Annual Meeting October 22-23, 2008 Dartmouth, Massachusetts Presenters: Scott Glenn & Josh Kohut.
FGDC Coordination Group Meeting 11 May 2010 Roger L. Parsons, IWG-OCM Co-chair (NOAA) Ocean and Coastal Mapping Integration Act Congressional Reports Update.
Gary Jedlovec Roadmap to Success transitioning unique NASA data and research technologies to operations.
1 NOAA Priorities for an Ecosystem Approach to Management A Presentation to the NOAA Science Advisory Board John H. Dunnigan NOAA Ecosystem Goal Team Lead.
Progress Towards Regional Coastal Ocean Observing Systems: Interactions between the NERRS, RAs and Sub-regional Monitoring and Observing Efforts 3 rd Meeting.
The Integrated Ocean Observing System (IOOS) is envisioned as a coordinated national and international network of observations, data management and analyses.
The Science Requirements for Coastal and Marine Spatial Planning Dr. Robert B. Gagosian President and CEO September 24, 2009.
RA Presentation Template NOTE: Please refer to the “GUIDELINES FOR PRESENTING RA PLANS” and the Excel spreadsheet when preparing your presentation (delete.
Integrated Ocean Observing System (IOOS) Update
U.S. Integrated Ocean Observing System (IOOS ® ) Z Improve safetyEnhance our economyProtect our environment CIMAR-GOMC meeting – 25 Feb 2015 Zdenka Willis.
Deerin Babb-Brott, Director National Ocean Council Office National Boating Federation 2013 Annual Meeting.
Great Lakes Environmental Research Laboratory Review – Ann Arbor, MI November 15-18, 2010 Page 1 Observing Systems & Advanced Technology Steve Ruberg.
Transitioning unique NASA data and research technologies to operations Short-term Prediction Research and Transition (SPoRT) Project Future Directions.
Future needs and plans for ocean observing in the Arctic AOOS Arctic Town Hall Futur Zdenka Willis Integrated Ocean Observing System National Program Office.
U.S. IOOS ® Update – SECOORA Annual Meeting Jack Harlan & Rob Ragsdale US IOOS Program Office.
From Regional and National to Global 1. Ocean observations for societal benefit Climate, operational ocean services, ocean health USA Committee for the.
State of the Global Change Grand Challenge Report to the Portfolio Committee on Science and Technology 15 September 2010.
US IOOS®, NDBC, CO-OPS Partnership Discussion
Presentation to Islands Trust Council December 6, 2017 – Victoria, BC
William Corso Deputy Assistant Administrator
Presentation transcript:

Phased Deployment and Operation of the Mid-Atlantic Regional Coastal Ocean Observing System (MARCOOS) Project Duration: 3 years; currently starting year 2. December 3, 2008 S. Glenn, B. Boicourt, A. Allen, L. Atkinson, A. Blumberg, W. Brown, M. Bruno, D. Chapman, A. Cope, A. Gangopadhyay, T. Herrington, D. Holloway, E. Howlett, D. King, J. Kohut, B. Lipphardt, A. MacDonald, J. McDonnell, J. Moisan, J. O’Donnell, M. Oliver, O. Schofield, H. Seim, J. Titlow, D. Ullman, J. Wilkin, R. Wilson, W. Wittman, M. Yarosh & A. Voros

2 Project Overview Project Goals: Leverage existing assets to establish a Regional Coastal Ocean Observing System to support MACOORA Regional Themes: Maritime Safety – provide regional surface currents maps to improve Search And Rescue, Hazardous Spill Response & Rip Current forecasts. Ecological Decision Support – provide regional 3-D temperature and circulation data & hindcasts for the recreational, commercial and fishery management communities. Provide regional-scale inputs to MACOORA’s nested subregional efforts on Coastal Inundation and Water Quality.

3 Project Overview MARCOOS Major Elements -10: Atmospheric Data Integration HF Radar Network Operations HF Radar Data QA/QC Underwater Glider Operations Satellite Data Acquisition Statistical Modeling Dynamical Modeling DMAC Education & Outreach Economic Benefits NWS WFOs Std Radar Sites Mesonet Stations LR HF Radar Sites Glider AUV Tracks USCG SLDMB Tracks NDBC Offshore Platforms CODAR Daily Average Currents

4 Project Overview Desired Outcomes: Collaborate with NOAA WFOs to link existing regional coastal weather networks to evolving NOAA WRF regional forecasting capabilities – to provide an improved ensemble of weather forecasts. Operate the existing Mid-Atlantic HF Radar network and leverage Coast Guard drifter data linked to statistical and dynamical models – to provide an ensemble of regional nowcasts and forecasts of 2-D surface currents. Operate the existing satellite receivers and leverage the Navy investment in a regional glider capability linked to dynamical models – to provide an ensemble of 3-D circulation, temperature and salinity nowcasts and hindcasts. Form a MARCOOS data management team – to facilitate implementation of an end-to-end system consistent with DMAC standards. Form an Education & Outreach planning team – to engage additional users. Form an Economic Impact planning team – to assess the benefits of MARCOOS information. Develop a management structure that establishes and monitors performance metrics – to ensure quality.

5 Project Overview Include how you measure success (success metrics) Milestone Chart – Progress enabled with monthly conference calls, semi- annual meetings & semi-annual reports. HF Radar operational performance metrics – Coordinated with National HF Radar Network. 12 of 13 Long Range Radars Deployed Average 78% data availability October 1, 2007 to October 1, 2008 RA outcome metrics – Membership satisfaction, growth, interest. Additional support for Federal Backbone assets. Tracking new projects or grants that leverage MACOORA & MARCOOS.

6 Project Status Report Project Schedule and Milestones:

7 Project Status Report Significant Accomplishments: Existing observational capacities ($20 M/year) required prioritization - MARCOOS regional priorities were successfully set based on user input acquired by the Regional Association (MACOORA). Over 20 existing subregional observing systems spanning 10 States & 111 Congressional Districts were successfully linked in a coordinated Regional Coastal Ocean Observing System (RCOOS). MARCOOS Theme 1 – Coast Guard Search And Rescue - provided additional activation energy for a growing National HF Radar Network. MARCOOS Theme 2 – Fisheries - has generated support at the Large Marine Ecosystem Level with NOAA fisheries scientists, recreational and commercial fishers. Demonstrated that new technologies chosen for regional-scale observations and forecasting are sustainable at typically available funding levels. Established training & education programs for workforce development. Demonstrated importance of DMAC, E&O and Economic Impact efforts. Provided a sustained testbed to help attract other programs – DHS COE, DoD MURI, NSF OOI & COSEE-NOW, NWQMN Pilot, NOAA Fisheries, States.

8 Keys to Success What worked well & why? Prioritization of regional themes - Support of the Regional Association - Dedicated Partnering Meetings – Water Quality, Inundation, Fisheries - MARCOOS Economic Impact Team for targeting users Designing the RCOOS - Limited the scope - focused on linking and strengthening core capabilities - Leveraged existing assets - RA built trust over several years between individuals in a wide variety of academic, industry and government efforts. - Partnering – User Co-PI’s, E&O Team links providers with users. Implementing the end-to-end system - MARCOOS DMAC SWAT Team - now MACOORA-wide - Partnership Approach, Multiple Communication Opportunities - Generated broader support – RA & RCOOS provides a leveraging framework to attract other agencies and industry.

9 Potential Benefit to Others How might your project be relevant to other regions or federal agencies? - National HF Radar Network Evolution - Glider operations and training - Statistical model approaches for short term predictions - Data assimilative ensemble modeling approaches - Federal agency interest – NSF, ONR, DoD, DHS, EPA, MMS, USGS If so, what would be required to transfer key elements to other regions, federal agencies, and users? - Partnerships to define regional goals - Scientists to validate data and models - Experienced technicians to implement Does this project include a component to transfer or extend project results to other regions and users? If so, please describe. - Not as a funded activity. - Collaborations with 10 of 11 RAs are being pursued through other means. - Student participation in IOOS activities.

10 Challenges Describe potential and/or real challenges (i.e., such as institutional barriers, technical barriers, scientific barriers, personal, etc) you are facing in accomplishing the established milestones. Institutional: - Spatial overlap between MACOORA & NERACOOS. - RA is not well structured to respond to non-IOOS RFPs. Technical: - HF Radar Operations-Need technicians, spare parts, redundant systems. - Glider Operations-Need sufficient Gliders, technicians, operations costs. - Dynamical Models-Need Personnel for sustained real-time operations. Scientific: - Scientific basis for Ecosystem Based Management is still being established in our Large Marine Ecosystem. Personnel: - Primary challenge is the personnel required for sustained operations – this is a simple support level issue, not a complex willingness issue.

11 Challenges Resolving challenges - How might these challenges be resolved? (Besides additional financial resources) For example, are there actions that NOAA or other federal agencies could take to assist? Relation between NERACOOS & MACOORA will strengthen over time - We are linked by the Large Marine Ecosystem and new observing technologies. Science Teams are a MACOORA product for diversifying funding. Eager to work with NOAA to enhance the Federal Backbone. Specifically – PORTS, Buoys at the shelf break, WRF weather forecasts. Continue to develop national capabilities where it makes sense – e.g., HF Radar network, ONR Glider Consortium.

12 Stakeholder Response How are you engaging stakeholders in this project? - Data Web pages have been active since MACOORA Annual Regional meeting - Dedicated Subregional meetings on focus topics - As Co-PI’s on MARCOOS and follow-on projects How are stakeholders responding to the project to-date? - Constant traffic, increasing interest in MACOORA. - MACOORA-MARCOOS are now being invited to stakeholder meetings. - MARCOOS is transitioning into an asset for attracting additional funds. How are you tracking stakeholder satisfaction? - Web hits, s, surveys. - Talking with major users. - Membership in MACOORA, letters of support, petitions.