EMGT 501 HW #2 Answer. 020/3 X 3 05/601-1/62/3050/3 X 6 0-5/300-2/3-1/3180/3 (c).3/230with )3/80,0,0,3/50,3/20,0(*)*, ( solution Optimal 654321   Z.

Slides:



Advertisements
Similar presentations
Chapter 7 Project Management
Advertisements

Project Scheduling: PERT-CPM
Project Management Projects are unique, one-time operations designed to accomplish a specific set of objectives in a limited timeframe Project managers.
Chapter 13 Project Scheduling: PERT/CPM
Chapter 3 Project Management.
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edwards University.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
2 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Project Management 2.
1 Topics to cover in 2 nd part ( to p2). 2 Chapter 8 - Project Management Chapter Topics ( to p3)
Project Scheduling Basic Approach. projectA project is a collection of tasks that must be completed in minimum time or at minimal cost. activitiesIt is.
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
1 Project Scheduling CP - Chapter 10 Lecture 3. 2 Project Management  How is it different?  Limited time frame  Narrow focus, specific objectives 
1 1 Slide © 2005 Thomson/South-Western Q 5 – 13 x 1 = the probability that Station A will take Sitcom Rerun x 2 = the probability that Station A will take.
1 1 Slide © 2004 Thomson/South-Western Chapter 12 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
1 1 Slide © 2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole.
MGMT 483 Week 8 Scheduling.
1 1 Slide © 2009 South-Western, a part of Cengage Learning Slides by John Loucks St. Edward’s University.
Project Management with PERT/CPM
1 7.1 Introduction A project is a collection of tasks that must be completed in minimum time or at minimal cost. Tasks are called “activities.” –Estimated.
1 1 Slide © 2005 Thomson/South-Western Chapter 10 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
Network Optimization Models
PERT/CPM Models for Project Management
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edward’s University.
Chapter 10 Project Scheduling: PERT/CPM
1 Slide © 2005 Thomson/South-Western Chapter 10 Project Scheduling: PERT/CPM Project Scheduling with Known Activity Times Project Scheduling with Known.
Project Management Techniques.
■ Project duration can be reduced by assigning more resources to project activities. ■ However, doing this increases project cost. ■ Decision is based.
EMGT 501 HW # Due Day: Sep 27.
EMGT 501 HW #2 Solutions Chapter 6 - SELF TEST 21 Chapter 6 - SELF TEST 22.
EMGT 501 HW # Due Day: Sep 12.
USING MS PROJECT Project management software programs such as Microsoft Project can be used for developing the project schedule We demonstrate the use.
Project Management CPM, PERT, Crashing – An Illustrative Example
USING MS PROJECT 2010 Project management software programs such as Microsoft Project 2010 can be used for developing the project schedule and budget, and.
MANA 705 DL © Sistema Universitario Ana G. Méndez, All rights reserved. W6 6.2 Operation Management Operation Management Managing Projects Techniques.
McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Table of Contents Chapter 8 (PERT/CPM Models for Project Management) A Case Study: The Reliable.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 17 Project Management Part.
Project Management (專案管理)
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
1 1 Project Scheduling PERT/CPM Networks. 2 2 Originated by H.L.Gantt in 1918 GANTT CHART Advantages - Gantt charts are quite commonly used. They provide.
1 1 © 2003 Thomson  /South-Western Slide Slides Prepared by JOHN S. LOUCKS St. Edward’s University.
1 1 Slide © 2005 Thomson/South-Western Chapter 10 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
Project Management Chapter 13 Sections 13.1, 13.2, and 13.3.
PERT/CPM F G A E H I J K D St T B C
Scheduling Scheduling : is the process of converting a project action plan into an operating time table. Why scheduling ? To answer the following questions:
Project Management (專案管理)
Project Management Chapter Topics
UNIT II Scheduling Procedures & Techniques FLOAT
Project Planning & Scheduling
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
Project Planning & Scheduling
Project Management for Business
PROJECT MANAGEMENT WITH CPM/PERT.
Decision making and Organization Management
Project Scheduling Network Optimization can be used as an aid in the scheduling of large complex projects that consist of many activities A project is.
תזמון פרויקטים.
Chapter 16 – Project Management
General Foundry Example of PERT/CPM
Slides Prepared by JOHN LOUCKS
Planning and Managing Projects
Presentation transcript:

EMGT 501 HW #2 Answer

020/3 X 3 05/601-1/62/3050/3 X 6 0-5/300-2/3-1/3180/3 (c).3/230with )3/80,0,0,3/50,3/20,0(*)*, ( solution Optimal   Z xxxxxx

6.1-4 (a) Dual formulation becomes Min s.t. # of constraints of Dual = 3 # of constraints of Primal = 5 So, Dual is better than Primal because the size of B -1 in Dual is smaller than that of Primal.

(b) Dual formulation becomes Min s.t. # of constraints of Dual = 5 # of constraints of Primal = 3 So, Primal is better than Dual because the size of B -1 in Primal is smaller than that of Dual.

6.1-5 (a) Min s.t. (b) It is clear that Z*=0, y 1 *=0, y 2 *=0.

Project Scheduling: PERT-CPM

PERT (Program evaluation and review technique) and CPM (Critical Path Method) makes a managerial technique to help planning and displaying the coordination of all the activities.

Activity Activity Description Immediate Predecessors Estimated Time ABCDEFGHIJKLMNABCDEFGHIJKLMN - A B C E D E,G C F,I J H K,L 2 weeks 4 weeks 10 weeks 6 weeks 4 weeks 5 weeks 7 weeks 9 weeks 7 weeks 8 weeks 4 weeks 5 weeks 2 weeks 6 weeks Excavate Lay the foundation Put up the rough wall Put up the roof Install the exterior plumbing Install the interior plumbing Put up the exterior siding Do the exterior painting Do the electrical work Put up the wallboard Install the flooring Do the interior painting Install the exterior fixtures Install the interior fixtures

Immediate predecessors: For any given activity, its immediate predecessors are the activities that must be completed by no later than the starting time of the given activity.

AON (Activity-on-Arc): Each activity is represented by a node. The arcs are used to show the precedence relationships between the activities.

A B C E M N START FINISH H G D J I F LK nodearc (Estimated) Time 2

START A B C D G H M FINISH = 40 weeks START A B C E F J K N FINISH = 43 weeks START A B C E F J L N FINISH = 44 weeks Path and Length Critical Path

Critical Path: A project time equals the length of the longest path through a project network. The longest path is called “critical path”. Activities on a critical path are the critical bottleneck activities where any delay in their completion must be avoided to prevent delaying project completion.

ES : Earliest Start time for a particular activity EF : Earliest Finish time for a particular activity

A B C E M N START FINISH H G D J I F LK ES=0 EF=2 ES=2 EF=6 ES=6 EF=16 ES=16 EF=20 ES=16 EF=23 ES=16 EF=22 ES=22 EF=29 ES=20 EF=25

If an activity has only a single immediate predecessor, then ES = EF for the immediate predecessor. Earliest Start Time Rule: The earliest start time of an activity is equal to the largest of the earliest finish times of its immediate predecessors. ES = largest EF of the immediate predecessors.

A B C E M N START FINISH H G D J I F L K ES=0 EF=2 ES=2 EF=6 ES=6 EF=1 ES=16 EF=20 ES=16 EF=23 ES=16 EF=22 ES=22 EF=29 ES=20 EF=25 ES=25 EF=33 ES=33 EF=37 ES=33 EF=38 ES=38 EF=44 ES=29 EF=38 ES=38 EF=40 ES=44 EF=44

Latest Finish Time Rule: The latest finish time of an activity is equal to the smallest of the latest finish times of its immediate successors. LF = the smallest LS of immediate successors. LS: Latest Start time for a particular activity LF: Latest Finish time for a particular activity

A B C E M N START FINISH H G D J I F L K LS=0 LF=0 LS=0 LF=2 LS=2 LF=6 LS=6 LF=16 LS=16 LF=20 LS=20 LF=25 LS=25 LF=33 LS=18 LF=25 LS=34 LF=38 LS=33 LF=38 LS=38 LF=44 LS=33 LF=42 LS=42 LF=44 LS=26 LF=33 LS=20 LF=26 LS=44 LF=44

Latest Start Time Earliest Start Time S=( 2, 2 ) F=( 6, 6 ) Latest Finish Time Earliest Finish Time

S=(20,20) F=(25,25) A B C E M N START FINISH H G D J I L K S=(0,0) F=(0,0) S=(0,0) F=(2,2) S=(2,2) F=(6,6) S=(16,16) F=(20,20) S=(25,25) F=(33,33) S=(16,18) F=(23,25) S=(33,34) F=(37,38) S=(33,33) F=(38,38) S=(38,38) F=(44,44) S=(29,33) F=(38,42) S=(38,42) F=(40,44) S=(22,26) F=(29,33) S=(16,20) F=(22,26) S=(44,44) F=(44,44) F S=(6,6) F=(16,16) Critical Path

Slack: A difference between the latest finish time and the earliest finish time. Slack = LF - EF Each activity with zero slack is on a critical path. Any delay along this path delays a whole project completion.

Three-Estimates Most likely Estimate (m) = an estimate of the most likely value of time. Optimistic Estimate (o) = an estimate of time under the most favorable conditions. Pessimistic Estimate (p) = an estimate of time under the most unfavorable conditions.

o p mo Beta distribution Mean : Variance:

Mean critical path: A path through the project network becomes the critical path if each activity time equals its mean. Activity OE MPEMeanVariance ABCABC OE: Optimistic Estimate M : Most Likely Estimate PE: Pessimistic Estimate

Activities on Mean Critical Path MeanVariance ABCEFJLNABCEFJLN Project Time

Approximating Probability of Meeting Deadline T = a project time has a normal distribution with mean and, d = a deadline for the project = 47 weeks. Assumption: A probability distribution of project time is a normal distribution.

Using a table for a standard normal distribution, the probability of meeting the deadline is P ( T d ) = P ( standard normal ) = 1 - P( standard normal ) =

Time - Cost Trade - Offs Crashing an activity refers to taking special costly measures to reduce the time of an activity below its normal value. Crash Normal Crash time Normal time Crash cost Normal cost Activity cost Activity time

Activity J: Normal point: time = 8 weeks, cost = $430,000. Crash point: time = 6 weeks, cost = $490,000. Maximum reduction in time = = 2 weeks. Crash cost per week saved = = $30,000.

Cost ($1,000) Crash Cost per Week Saved ABJABJ $100 $ 50 $ 30 Activity Time (week) Maximum Reduction in Time (week) NNCC $180 $320 $430 $280 $420 $ N: Normal C: Crash

Using LP to Make Crashing Decisions Let Z be the total cost of crashing activities. A problem is to minimize Z, subject to the constraint that its project duration must be less than or equal to the time desired by a project manager.

= the reduction in the time of activity j by crashing it = the project time for the FINISH node

= the start time of activity j Duration of activity j = its normal time Immediate predecessor of activity F: Activity E, which has duration = Relationship between these activities:

Immediate predecessor of activity J: Activity F, which has time = Activity I, which has time = Relationship between these activities:

Minimize The Complete linear programming model

One Immediate Predecessor Two Immediate Predecessors Finish Time = 40 Total Cost = $4,690,000

EMGT 501 HW # Due Day: Sep 27

You are given the following information about a project consisting of six activities: (a) Construct the project network for this project. (b) Find the earliest times, latest times, and slack for each activity. Which of the paths is a critical path? (c) If all other activities take the estimated amount of time, what is the maximum duration of activity D without delaying the completion of the project?

Sharon Lowe, vice president for marketing for the Electronic Toys Company, is about to begin a project to design an advertising campaign for a new line of toys. She wants the project completed within 57 days in time to launch the advertising campaign at the beginning of the Christmas season. Sharon has identified the six activities (labeled A, B, …, F) needed to execute this project. Considering the order in which these activities need to occur, she also has constructed the following project network. STARTFINISH ACEF BD

Using the PERT three-estimate approach, Sharon has obtained the following estimates of the duration of each activity. Optimistic Most Likely Pessimistic Activity Estimate Estimate Estimate A 12 days 12 days 12 days B 15 days 21 days 39 days C 12 days 15 days 18 days D 18 days 27 days 36 days E 12 days 18 days 24 days F 2 days 5 days 14 days (a) Find the estimate of the mean and variance of the duration of each activity. (b) Find the mean critical path.

(c) Use the mean critical path to find the approximate probability that the advertising campaign will be ready to launch within 57 days. (d) Now consider the other path through the project network. Find the approximate probability that this path will be completed within 57 days. (e) Since these paths do not overlap, a better estimate of the probability that the project will finish within 57 days can be obtained as follows. The project will finish within 57 days if both paths are completed within 57 days. Therefore, the approximate probability that the project will finish within 57 days is the product of the probabilities found in parts (c) and (d). Perform this calculation. What does this answer say about the accuracy of the standard procedure used in part (c)?